WES Document Flow 1 of 4 Receipt of tender specification (S&M team)

Slides:



Advertisements
Similar presentations
Log System Spec 1 Logical Systems Specification Module Two stages in the module – Stage 4 - Technical Systems Options – Stage 5 - Logical Design Performed.
Advertisements

Click to edit Master text styles – Second level Third level – Fourth level » Fifth level Integrated Solutions for Hospitality Projects.
offered by COMPONENTKIOSK Dupont Path Apple Valley MN USA Tel: Fax: Piping.
MIS 325 PSCJ. 2  Business processes can be quite complex  Process model: any abstract representation of a process  Process-modeling tools provide a.
Internal Control Concepts Knowledge. Best Practices for IT Governance IT Governance Structure of Relationship Audit Role in IT Governance.
© Nintendo Game Document Game Development - Spring
Design Reviews.1 KGCOE Multidisciplinary Sr. Design Borkholder 2007 R I T Design Reviews Objectives of the Design Review Participants for a successful.
Design Reviews.1 KGCOE Multidisciplinary Sr. Design Borkholder 2006 R I T Design Reviews Objectives of the Design Review Participants for a successful.
Project Execution & Termination Life Cycle Execution Presented by: Basker George.
SOFTWARE QUALITY ASSURANCE Asst. Prof. Dr. Selim BAYRAKLI Maltepe University Faculty of Engineering SE 410.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
THE SYSTEMS LIFE CYCLE ANALYSE DESIGN IMPLEMENT MAINTENANCE IDENTIFY/INVESTIGATE.
Presentation Handout EDBA – Module 8 Information Technology 7 th December 2014 By K.M.Prashanthan.
Free Powerpoint Templates Page 1 Free Powerpoint Templates How do we do it? Class 7.
Manufacturing Process GLOBOSE Manufacturing Process Details Globose Systems and Solution Pvt,. Ltd.
System Development Life Cycle. The Cycle When creating software, hardware, or any kind of product you will go through several stages, we define these.
Improving engineering productivity APEGGA. Improving Productivity Mega Projects  History  What is needed  How will it be done  Division of Labour.
Specification & Quantities Estimating
Service Management for CERN Change Management Acceptance Meeting Geneva, Jochen Beuttel.
Software Development Life Cycle (SDLC) Presented by The Smartpath Information System An ISO 9001:2008 Certified Organization
Project Management Methodology Development Stage.
Understanding Fire Sprinkler Systems (c) Nothing in this Act shall be construed to prevent a fire sprinkler contractor licensed under the Fire Sprinkler.
R&D and Product Development Engineering Management & Design Process Hub van de Bergh - July Rev 1 | 17 July 2004 | Hub van de Bergh
ITER- TBM Planning and Costing Activity DCLL TBM Mechanical Design ( ) & TBM-Port Interface ( ) Presented by Mo Dagher December
Product Documentation Process Infosys Technologies Ltd. Bangalore.
Final Year Project 1 (FYP 1)
GCSE ICT 3 rd Edition The system life cycle 18 The system life cycle is a series of stages that are worked through during the development of a new information.
Best Practices for Inventory Control Patricia Hanson Biological Administrator I Florida Department of Agriculture and Consumer Services Food Microbiology.
CS 5150 Software Engineering Lecture 9 Requirements 3.
© Questionnaire 27 th September 2010.
Complete Design & Gate Review. Complete Design Detailed Design Review (DDR) 1.“High and medium technical risk” areas –Design Review (Prelim-DDR): standard.
How to succeed in International Tenders Ing. Miloš TKÁČ MTC – Engineering / Consulting / Sales Južná trieda 93 – P.c. Strojár, Košice tel.: 055 / 6808.
MANAGING HSE IN CONTRACTS 2016 GU140 (C9). 01 PR1171 PART I & PR1171 PART II Contract HSE Management – Mandatory for CH and Contractor 03 PR1997 Contractor.
Façade Management Consulting
Create a PO-Based Invoice
Software Configuration Management
Chapter 7 Compliance Testing.
Metrics Replication Presentation for Maryland Staff September 26, 2002
DOCUMENTATION DEVELOPMENT LIFE CYCLE (DDLC)
Input Flow Diagram Output Doc’s Who Start End
SNMS Supplier Network Management System
CEM 515 Process analysis & Improvement
ECITB Apprentice Phase Testing (APT) Programme 2018
Pre-contract Planning and Practice
Inspection and Testing
Sales Process March 2017.
Project: 33kV Substation Refurbishment Customer: NEEPCO Site : Ranga Hydro Electric Plant, P.O. Ranga Project, Arunachal Pradesh.
Engineering Processes
Using the Checklist for SDMX Data Providers
Interested to become an EOQ Member?
Registration Process for new messages
Fast Track Maintenance Process (for existing messages)
FINANCIAL BID OPENING.
MANAGING HSE IN CONTRACTS 2017 GU140 (C9)
Concept Generation: ID-3D Design’s Initial enclosure concepts are generated based on specifications, requirements and preferences from the client as well.
APQP PROCESS FLOW Prepare for APQP Plan and Define Program
Yearly Maintenance Process (for existing messages)
Standards Break Out Session
Purchasing cycle Purchase request
Vendor Portal Registration Procedures
Wide Area Workload Management Work Package DATAGRID project
5 POINT PLAN THE SYSTEMS LIFE CYCLE ANALYSE DESIGN
NSS Instrument Project Tollgate Coordinator
CEM 515 Process analysis & Improvement
1. Process Hazards Checklists
Registration Process for new message variants
TECHNICAL EVALUATION.
SCADA – Data Processing Module
Requirements “Content Guide”
Project Model Otto Husby Cimple AS.
Presentation transcript:

WES Document Flow 1 of 4 Receipt of tender specification (S&M team) PreliminaryBEP L Storage of documents in input log Process Documents Review of tender specifications Yes Preparation of “Design Guide” C- From BOQ reconciliation E-Receipt of vendor offers J- to interface check L-Input List QUERIES Kick of meeting with client BEP Approval parallel to DE No Start Detailed Engineering (DE) Drawings Layout, MDL& 1st Engg. BOM J Start issuing PR in ERP E

WES Document Flow 2 of 4 1st stage closure Simultaneously J Output List P Interface check of generated document with all disciplines* Rapid check Additional BOQ COMPLIANCE TO INTERFACE- CHECK & CHECK LIST CORRECT THE DOCUMENT/DRAWING FOR COMPLIANCE No No Yes C No Yes Submission of document through DCS to client IS THE DOCUMENT APPROVED K---Issuing MFC & GFC Issue PR after reconciliation Receipt of document from client Stage closure complete L P Yes K * APPLICABLE FOR DOCUMENTS MEANT FOR INTERFACE CHECK AS PER STANDARD LIST.

WES Document Flow 3 of 4 E Receipt of vendor offers Vendor Technical evaluation of offers Reject and send to the vendor Is the document technically OK No Reject and send to vendor No Is the POD technically OK Yes PO/Receipt of POD from finalized vendor L-Input List J- to interface check E-Issuing PR’s Yes L J

WES Document Flow 4 of 4 K K K APPROVED E&I DOCUMENTS MFC & GFC BOQ RECONCILIATION APPROVED MECHANICAL BOUGHT DOCUMENTS MFC & GFC BOQ RECONCILIATION PIPING ISO RELEASE & BOQ RECONCILIATION Engineering Closure C Additional BOQ Yes No K- From approved documents C- Issue PR after reconciliation End