Shuji Matsumoto Accelerator Lab., KEK

Slides:



Advertisements
Similar presentations
SLAC workshop 7-10 July 2009 WP1: microwave based accelerators Status of CLIC X-band high-power components G. Riddone, (contribution from A.
Advertisements

CERN-KEK X-band collaboration 3 Dec T. Higo on behalf of X-band group of KEK.
Status and plan for X-band high field experiments at KEK US High Gradient Collaboration Workshop University of Maryland Jan , 2008 KEK T. Higo.
Structure testing and RF tests stands Jan Kovermann CERN On behalf of the CLIC structure test team.
July Alexej Grudiev, Improvement of CLIC structure. Possible improvement of the CLIC accelerating structure. From CLIC_G to CLIC_K Alexej.
Report from Nextef IWLC10, Genève, Oct. 20 T. Higo (KEK)
High-gradient Experiments with Narrow Waveguides Kazue Yokoyama, Toshiyasu Higo, Yasuo Higashi, Noboru Kudo, Shuji Matsumoto, Shigeki Fukuda, Mitsuo Akemoto,
Demonstration of the Beam loading compensation (Preparation status for ILC beam loading compensation experiments at ATF injector in this September) (PoP.
Walter Wuensch CLIC project meeting, 31 March 2015 Accelerating structure program: design and testing.
Test Facilities Sami Tantawi SLAC. Summary of SLAC Facilities NLCTA (3 RF stations, one Injector, one Radiation shielding) – Two 240ns pulse compressor,
Test Facilities Sami Tantawi SLAC. Summary of SLAC Facilities NLCTA (3 RF stations, one Injector, one Radiation shielding) – Two 240ns pulse compressor,
30 GHz waveguide line modification towards 12 GHz.
Update of KEK X-band Research Activity March 3, 2009 Shuji Matsumoto Accelerator Laboratory, KEK 2009/3/31US High Gradient Workshop.
R&D proposals for EuCard 2 EuCard2, April 21Steffen Döbert, BE-RF  SRF basic research (W. Weingarten)  CTF3 and CTF3+, possible infra - structure for.
Test Facilities and Component Developments Sami Tantawi SLAC May 15, 2008.
Christopher Nantista ARD R&D Status Meeting SLAC February 3, …… …… …… … ….
Clustered Surface RF Production Scheme Chris Adolphsen Chris Nantista SLAC.
X-Band RF Structure and Beam Dynamics Workshop, December 2008 CERN experience with 12 GHz high power waveguide components Igor Syratchev (CERN)
Anders Sunesson RF Group ESS Accelerator Division
X-band high gradient activities at KEK May 13-15, nd Collaboration meeting on X-band Accelerator Structure Design and Test Program T. Higo, KEK.
NLC Status and Milestones D. L. Burke ISG9 KEK December 10-13, 2002.
Performance of CLIC prototype accelerator structures tested at Nextef CLIC February 2014 Toshiyasu Higo (KEK)
CLIC TDR Task Force CLIC Zero, cost & schedule considerations R. Corsini.
常伝導技術での LC の可能性 LC feasibility consideration with normal conducting technology 第5回「機構の研究推進について」の意見交 換会 (ILC の推進について ) 平成 24 年 2 月 13 日 加速器・肥後寿泰.
Next Linear Collider 8-Pack Project D. Atkinson System Review, April 3 The 8-Pack Project at NLCTA An overview of the status and schedule for the project.
Recent high-gradient results, rf testing, places and plans Steffen Döbert, CLIC Workshop, Test facilities High gradient results Future testing.
Summary of progress towards CLIC goals and next steps for structure testing 6 th X-band collaboration workshop, April 18 th- 20 th 2012 Steffen Döbert,
A Study of RF breakdown of Narrow Wave Guide Shuji Matsumoto Kazue Yokoyama Toshi Higo Accelerator Lab., KEK 2016/1/41SLAC Workshop 8-10 July 2009.
EnEfficient RF Sources Workshop. June 2014 I. Syratchev X-band high RF power testing activity at CERN I.Syratchev.
12 GHz Stand alone power source at CERN G.McMonagle AB/RF.
High gradient study at KEK CLIC08, Oct , 2008 T. Higo.
Status report from KEK Feb. 26, 2010 T. Higo, S. Matsumoto T. Takatomi, Y. Higashi and X-band group.
Nextef results CLIC09, Oct T. Higo (KEK). Contents Quadrant high gradient test status – Initial processing and power limit – VAC characteristics.
W. Wuensch CLIC project meeting High-power rf structure testing.
Status of high gradient experiments at Nextef Kazue Yokoyama, Toshiyasu Higo, Yasuo Higashi, Shuji Matsumoto, Shigeki Fukuda Accelerator Laboratory, KEK.
Narrow waveguide experiments Kazue Yokoyama, Toshiyasu Higo, Yasuo Higashi, Noboru Kudo, Shuji Matsumoto, Shigeki Fukuda, Mitsuo Akemoto, Mitsuhiro Yoshida,
1 Design and objectives of test accelerating structures Riccardo Zennaro.
C/S band RF deflector for post interaction longitudinal phase space optimization (D. Alesini)
Nextef status and expansion plans Shuji Matsumoto for KEK Nextef Group /5/51 4th X-band Structure Collaboration Meeting, CERN.
High Power Crab Cavity Testing Ben Woolley HG2016 Argonne National Lab. 8 th June 2016.
The status of RF components G. Riddone, M. Filippova RF development meeting on
KEK test area plans Shuji Matsumoto Accelerator Lab., KEK.
Advancements on RF systems D. Alesini (LNF-INFN) Quinto Meeting Generale Collaborazione LI2FE, Frascati 15-16/03/2011.
A CW Linac scheme for CLIC drive beam acceleration. Hao Zha, Alexej Grudiev 07/06/2016.
Franck PEAUGER – CEA SACLAY LCWS11 - Grenada 29 th September 2011 High power RF components F. Peauger, A. Branco, M. Desmons, W. Farabolini, P. Girardot,
Test Accelerating Structures Designs, Objectives and Critical Issues
The LEP Superconducting RF system has reached its maximum configuration of 288 four-cell cavities powered by 36 klystrons in In 2000, this system,
Multi-stage pulse compressor
High power test results of X-band deflecting cavity
Abstract EuSPARC and EuPRAXIA projects
Development of X-band 50MW klystron in BVERI
Manipulating RF phase and amplitude at high power level.
An X-band system for phase space linearisation on CLARA
Application of moderate (5 MW) X-band power sources for the CLIC accelerating structures testing program and other projects I. Syratchev, CERN.
Ideas for medium and long term facility upgrade Roberto Corsini for the CLIC Accelerator Collaboration.
X-band and high-gradient development plans at Tsinghua University
Application of the moderate peak power (6 MW) X-band klystron’s cluster for the CLIC accelerating structures testing program. I. Syratchev.
DRFS and Low Energy 10 Hz Option
12 GHz High Power RF components requirements for CEA activities
Summary of the test structure design
Testing Infrastructure, Program and Milestones
Task 2: High-gradient normal-conducting technology development
CLIC Klystron based. Updates 2017.
Recent high-gradient testing results from the CLIC XBoxes
High Gradient tests at the KEK Nextef Facility
CEPC RF Power Sources System
A Study of RF breakdown of Narrow Wave Guide
Status of KEK X-band Test Facility and its future plans
STATUS REPORT OF THE SPARC HIGH POWER RF SYSTEM Nov. 16, 2005 R
CLIC Feasibility Demonstration at CTF3
Presentation transcript:

Shuji Matsumoto Accelerator Lab., KEK KEK test area plans Shuji Matsumoto Accelerator Lab., KEK

Two X-band high power stations in KEK KT-1 (50MW) Klystron Test, Small experiments (in Lead shield box) Test area in Shield-A Nextef (100MW) Modulator and twin klystrons

What to be pursued by KEK X-band Practical structure evaluation and develop high power system Aiming at CLIC design Minimum required power and pulse width are ~ 75MW and ~ 240ns. Nextef is our only choice to conduct this work. These parameters are just we are operating. Introducing power compression system is needed beyond these. Basic research on high gradient Study with: Single-cell, Narrow waveguide, C10, CD10, … Required the power as low as10MW to very high >>100MW with pulse width ~500ns. KT-1 is suitable for these works . We may use Shield-B with Nextef klystrons. Development of components and devices load, directional coupler, …, Klystron, …

2009 version final version 22m - One Channel Pulse Compressor (circular TE11 / TE21) proposed by M. Yoshida. Klystron Accelerator TE11R TE11L 750ns → 150ns Gain = 3.6 @ 3dB 22m - One Channel 1500ns → 300ns Gain = 3.3 @ 3dB TE12L TE12R TE11 Mode Converter TE11-TE12 Reflector Upgrade using higher mode 2009 version 25 MW×2 Klystons ×gain=3 → 150MW final version

Gycom High-Q Cavity PC

Q=20 000

Proposal Pulse compression systems Construct Yoshida PC of “final version” (double-mode version). The compressed power goes to Shield-A for the structure test. Test of High-Q Cavity PC at Nextef. The (maximum) power of 50MW with 1.5us will be available for the test. High-Q Cavity PC may be installed at KT-1.

Pulse compressors Nextef KT-1 Source RF Compressed (Gain=3) (Gain=2.5) 1500ns 300ns 25MW X 2 150MW 25MW 60MW Yoshida Delay Line PC with Double Modes Gycom High-Q cavity PC

Comment : Practical operation limit of PPM Klystron Plots of Pulse Shortening Events on Power / Width plane. 25MW,1.5us

TE11/TE21 PC Configuration

Reconfiguration of transmission lines Current configuration Proposed configuration

Nextef Area as of July 3. Nextef Klystrons and Modulator Phi-80 Circular waveguide Shield-B Shield-A (T18 Disk-> T18 Quad )

Nextef Planning revised on July 1,2009. 2009 2010 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 T18_VG2.4_Disk #2 TD18_VG2.4_Quad A TD18_VG2.4_Disk T18_VG2.4_Disk #4 Gycom Pulse Compressor test C-band line from KT-2 X-band transmission line construction B RF transmission test, SKIP test, structure (CKM-004) test C-band Structure Test KT-1 NWG Cu-005 Conditioning of PPM-06b Component tests

Nextef Configuration KT-1 X-band KT-2 C-band

Conclusion Nextef Sheild-A: We continue X-band structure tests. Delay Line Pulse Compression system will be installed in FY 2009. 150MW 300ns pulse is expected. DLPC starts operation in early summer 2010 after a 2m-long C-band structure test. ( The test starts in April 2010. Note the test occupies the delay line.) Sheild-B: X-band power line will be established from Nextef klystrons. KT-1 Continues tests of RF loads as well as klystron test. Install Gycom Cavity PC after its test(proposal).

Nextef planning (longer period) 2008 2009 2010 2011 2012 1 4 7 10 1 4 7 10 1 4 7 10 1 4 7 10 1 4 7 10 Establish system with KX03 T18_VG2.4_Disk #2 TD18_VG2.4_Quad TD18_VG2.4_Disk C-band structure test T18_VG2.4_Disk #3 TD24_VG_Disk_Practical TD24_VG_Disk_Practical for long run KT-1 Pulse compression Installation and commissioning Nextef To be determined reflecting the status