Introduction of Code Contingency Guidelines Document

Slides:



Advertisements
Similar presentations
Mod 0260 Post-Emergency Claims: Implementation Update Transmission Workstream - December 2009.
Advertisements

Funding UKLink Process changes (User Pays). 2 Purpose of Presentation  Review of User Pays  Principles  Application to date  National Grid NTS observations.
Review of industry code governance 26 March 2010.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Operating Margins. 2 Competitive Provision of Operating Margins Change to National Grid Gas’s Transporter Licence which:  Introduced Special Condition.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Revision of the UNC Post-Emergency Arrangements draft proposal July 2009.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Assignment of NTS Entry Capacity Transmission Workstream 06 November 2008.
February 2008 Gemini Incident Overview. Agenda Focus this part of the presentation is on the system elements of last year’s Gemini incident :-  Briefly.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Mod Clarifications Transmission Workstream 6 August 2009.
Proposed DN Pensions Deficit Charge Transmission Workstream 2 November 2006.
Initial Thoughts on the Release of Non Obligated NTS System Entry Capacity Transmission Workstream 3 rd April 2008.
Assignment of NTS Entry Capacity Transmission Workstream 02 July 2009.
September 2008 QSEC auction - Allocations Transmission Workstream
Code Governance Review UNC Modification Proposals Beverley Viney - National Grid NTS.
Agency Charging Statement Overview of Consultation 11 th February 2008.
Administrative Changes to the UK-Link Manual Modification 414 and SIS Removal David Addison.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Mod Entry Capacity Transfers Transmission Work Stream, 5 April 2007.
Assignment of NTS Entry Capacity Review Group 221, 10th December 2008.
Legal Text Production Options for Discussion. Legal Text Production 2 Issues with current approach Issues with the current approach to legal text production.
Development Modification Proposal: Introduction of an Inter-day Linepack Product Review Group August 2010 Transmission Workstream 07/10/2010.
UNC Modification Proposal 0097: Modification to release aggregated ex-post information for pipeline interconnector offtake flows Christiane Sykes E.ON.
IGT and Shipper Workgroup meeting 28 th February 2011.
EU Phase 3 Customer communications
Review of UNC Section Q “Emergencies”
Grid Code Development Forum – 6 September 2017
Code Governance Review UNC Modification Proposals
Transmission Planning Code
Transmission Workgroup 4th October 2012
CAP190: Workgroup Report CUSC Modifications Panel, 26th August 2011
UNC Trader User – Licence obligations
Proposer: National Grid NTS Panel Date: 17th April 2014
Gemini Code Contingency Testing – Exercise Star
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
NTS Entry Charging Review Update
Assignment Workshop 2 16th September 09, Solihull.
COR1072 Enduring Transfer and Trade Arrangements
Assignment of NTS Entry Capacity – Background and UNC Obligations
Exit Capacity Substitution and Revision
The Necessary Criteria for a UNC Modification Proposal
Proposer: Malcolm Montgomery Panel Date: 20/10/16
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
MOD 258A Demand Estimation Sample Point – Shipper Report.
Rebecca Hailes For 15 March 2018
Proposer: Colette Baldwin – E.ON Panel Date: 21st August 2014
COR1072 Enduring Transfer and Trade Arrangements
Transmission Planning Code Review
QSEC auction timetable
UNC Modification Proposal 0385 Inclusion of DNOs as Users in User Pays Arrangements Phil Lucas 7 June 2011.
Introduction of Code Contingency Guidelines Document
Modification Proposal 0474: Inclusion of the guidelines relating to the “Customer Settlement Error Claims Process” within UNC governance.
Proposer: Transporter /
Transmission Workstream 2nd December 2010
UK Link Manual Update (UNC Modification 0613)
Open Letter - Summary of Responses
CAM: Next Steps UNC Transmission Workgroup Lisa Martin 9 January 2014.
Gemini Code Contingency Review
Assignment of NTS Entry Capacity – Work currently being Undertaken
Assignment of NTS Entry Capacity – Previous Work Undertaken
Transmission Workstream 05 November 2009
Joint Office UNC Elections
Joint Office UNC Elections
Gas Customer Forum 28 July 2008
Modification 0621 / GB Charging Project DSC Change Management Committee update June 2018.
DSG Governance Group Recommendations.
Joint Office UNC Elections
Presentation transcript:

Introduction of Code Contingency Guidelines Document April 2009

Background Existing UNC Code Contingency arrangements have not had any significant review for a number of years Gemini system (unplanned) outage in October 2007 highlighted need for review Review Group 0217 ‘Gemini Code Contingency Arrangements initiated in July 2008 to review existing arrangements and recommend revisions where required

Review Group 0217 Concluded that the following recommendations be taken forward: Introduction of “Code Contingency Guidelines Document” detailing processes and procedures (communications) in the event of partial or total failure of UK Link Governance arrangements applied to the Guidelines through UNC Section V12 Raise a Modification Proposal that reflected the 0217 recommendations Provide suggested legal text to implement the changes

Modification Proposal - drafting Proposal has been drafted taking into account the 0217 Review Group recommendations The recommendation for the Guidelines to be governed within UNC Section V12 however does lead to dual governance issues with UNC Section U (UK Link) With hindsight, National Grid believes that it is appropriate for the Code Contingency Guidelines to be annexed to the UK Link Manual (effected via Section U). This addresses the issue of UK Link-related rules being split between Section U and Section V12 Shippers and Transporters are able to discuss any future changes to these Guidelines through the UK Link Committee (Section U) The drafting reflects the requirement to cross-reference specific parts of the UNC that might be relaxed in the event of a UK Link (‘Gemini’) Code Contingency, for example, Section B (Capacity Overruns) and Section H, Demand Attribution

Modification Proposal - next steps To be sent to the UNC Modification Panel in April with a recommendation that it proceeds to consultation Discussed at Transmission Workstream in May Anticipation that Contingency Guidelines could be published in June/July Raise a Class 1 UK Link change to link Guidelines to UK Link Manual

Publication of documents The new Contingency Guidelines will be published via the Joint Office website In addition, whilst the UK Link Manual is currently available on the xoserve website, it is proposed that the future publication of the UK Link Manual will also effected through the Joint Office website [Date of transfer to be agreed]

? Any questions?