PSB lock-out test - Organisation AP. Bernardes, D. Hay, C

Slides:



Advertisements
Similar presentations
HSE & Edinburgh University working together to manage Biological Safety Dr Matthew Penrose HSE Biological Agents Unit.
Advertisements

International Civil Aviation Organization European and North Atlantic Office SAFETY MANAGEMENT Elements Michel Béland ICAO Regional Safety Officer Europe.
Family Court Mediation and Counselling Service of Western Australia 1 The Columbus Program and its impact on the Family Court of Western Australia Kay.
Risk Assessment – An Essential Standard
Please read this before using presentation This presentation is based on content presented at the Exploration Safety.
Challenges of a Harmonized Global Safety Regime Jacques Repussard Director General IRSN IAEA 2007 Scientific Forum.
WATS Conference April 29th 09 ORLANDO The EAMTC Organisation: European Aviation Maintenance Training Committee.
The All Ireland Practice and Quality Development Database Launch Dublin Castle 5 th April 2006.
TS, Length of YETS EYETS LIU & CONS Project
Processus de Rabat / Rabat Process Session 4: Monitoring the Roadmap of the Dakar Strategy MEETING ON THE STRENGTHENING OF POLITICAL DECISION-MAKING BASED.
1 EARLY SAFETY MANAGEMENT OF PROJECTS AND EXPERIMENTS HSE UNIT PH DSO EDMS No
Peer review in institutional evaluation procedures “Sharing thoughts and comments about implementation“ Bruno Curvale Evaluation coordinator, CNÉ, France.
Workers’ Compensation Committee Agenda for December 17 th Meeting: Welcome/Introductions (7:30-7:45) Purpose of forming a Workers’ Comp Committee (7:45-8:15)
LS2 Safety Thomas Otto, LS2 Safety Coordinator.
Regional Programme of Statistics in the Mediterranean Region MEDSTAT Phase II This project is funded by the European Union 1 Workshop on Data Compilation.
LIU-PSB Configuration Management EDMS Documentation, Layout and ECRs Thomas Birtwistle EN-MEF-DC.
Planning & Installation meeting New working group EDMS th October 2014LIU PLI meeting - J.Coupard1.
Last but not least : LS2 General Safety 1 Thomas Otto, LS2 Safety Coordinator for LHC Ana-Paula Bernardes, LS2 Safety Coordinator for Injectors.
ADO-PO Section Meeting Safety Activities Sigi Wenig (LEXGLIMOS) 8 September 2015.
Safety Documentation How do we organize it and what will be the contents? A. Funken, LIU Project Meeting, 26 th September 2013.
ECR - PSB: New KSW magnet in 16L1 Luis Feliciano, 4 th February.
28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. General.
Dr. José Miguel JIMENEZ LS2 Project Leader, CERN 1 LS2 Days 30 th September2015.
1 st of April st LS2C LS2 Committee Mandate and Organization 2 Chairman:Jose Miguel JIMENEZ Deputy:Jean-Philippe.
Text box Workplace Safety and Health Management System New Worker Safety Orientation and Review Online Training Module.
Planned activities during (E)YETS… up to LS2 for PSB-PS equipment Etienne CARLIER On behalf of TE/ABT/EC.
Workload Assessment Model. Workload Management in Human Services : Workload Study-101 Standards 2003: Foster Care Workload Study 2010: Resource.
Twinning project ENEA – ENforcing Environmental Acquis César Seoánez Skopje, 9 th of February, th Steering Committee.
Electrial Safety LS2 days November 2016 AP
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
1st Steering Committee Meeting activities from WP3 –
Survey on “Chargés de Consignation” Status Update
Title of the Change Project
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
Clarifying Roles of Leaders New Committee Chairs
YETS & LS2 Works EN-EL / Power distribution
Framework Schedule from EYETS 2016 to LS2
Update on the Critical Path of the PS Booster Schedule for the EYETS
PSB Lock Out Test, Follow-Up AP. Bernardes-/EN-STI, K
Introduction Intro Problem Materials Hypothesis Procedure Results
Injector De-cabling Project
Safety in Construction and Upgrade Phases
Suggested Case Study Outline
Workload Assessment Model
Buffer Zones - Status Report
De-cabling strategy during YETS
PS Booster Hardware Tests & Cold Check-out planning 16th of March 2017
IRSC 2017 Hong-Kong.
CRG activities for EYETS 2016
Survey on “Chargés de Consignation” Follow-up
YETS & LS2 Works EN-EL / Power distribution
1st Steering Committee Meeting activities from WP3 –
PSB-PS instrumentation for LIU
PS Booster Report from: David HAY, Cyrille BEDEL 12-Jan-2018
Christophe Duhamel Global Office Coordinator, FAO Statistics Division
In Young Suh Division of Nuclear Security
CAPACITY BUILDING AND E-LEARNING IN VIETNAM
Workload Assessment Model
COST and COST Actions Participation of Georgian researchers
Region Training Conference 2018
Seminar on the Implementation of the 2008 SNA in Africa
LNG Workshop Bilbao, March 13th 2009 GLE.
Introduction: leaving care
4th Meeting of Steering Committee on E&T December 4, 2012
Proposal Writing Webinar
Employee Training and Orientation Process
Agenda • Introductions • Project Objectives • Project Steps
PROJECT SAFETY Richard Hislop.
Management commitment and responsibility Safety accountability of managers Appointment of key safety personnel SMS Implementation Plan Coordination.
Presentation transcript:

PSB lock-out test - Organisation AP. Bernardes, D. Hay, C PSB lock-out test - Organisation AP.Bernardes, D.Hay, C.Mugnier on behalf of the LS2 project Acknowledgements: M.Bernadini, JP.Burnet, J.Coupard, K.Foraz, M.Jimenez, V.Montabonnet, C.Pinto, JP.Tock

Outline Introduction Organisation Activities concerned by the PSB test Conclusion 16 December 2016 LS2 Committee

Introduction Presented during LS2 days: https://indico.cern.ch/event/564604/ 16 December 2016 LS2 Committee

Organisation Reference tandem for “PSB tests” (electrical safety only)  Follow up of “PSB tests” by AP.Bernardes Role Responsibles Reference tandem for “PSB tests” Support: 1 person with an electrical safety inspector profile followed by C.Mugnier David Hay Christophe Mugnier To be defined (selection on collaboration with HSE-SEE) 16 December 2016 LS2 Committee

Organisation Mission : Select 3 cases where electrical safety is critical and where the lock-out process needs to be clarified Define a pilot methodology and apply it on the 3 cases selected Identify the groups concerned, contact them and clarify with them the lock-out steps based on an electrical hazard assessment Write the operational procedures with the groups contribution If the procedure is approved it should be followed on field when applicable, get feed-back from groups Present feed-back of results and process at the LS2 Committee of April 2017 16 December 2016 LS2 Committee

Activities concerned by the PSB test 3 cases with 3 different approaches are proposed for the “PSB tests”: Machine oriented approach PSB Period approach Intervention on PS Booster PERIOD 2 (EYETS, YETS, TS, LS2)  Lock-out process, who is concerned, who does what? Work package New Injection Region 1L1 (LS2)  Lock-out process, who is concerned, who does what? Transversal Activity approach PSB Access and electrical state of the machine (EYETS, YETS, TS, LS2)  Electrical hazard mapping, training, habilitation 16 December 2016 LS2 Committee

Conclusion The “PSB tests” are proposed to improve the lock-out process The reference tandem is defined The support selection process for the “PSB tests” is on going 3 cases have been identified thanks to D.Hay, C.Mugnier and the groups collaboration “PSB tests” will start in January 2017 Your collaboration and feed-back from field are the key for the success of this test! 16 December 2016 LS2 Committee