API SC 10 Task Group on Stage Cementing Collars TG Charge Proposal Alfredo Sanchez, P.E., Rubicon Oilfield International 2017 Exploration and Production Winter Standards Meeting Austin, January, 2017
Content TG Volunteers Summary of first meeting Charge proposal TG Members
Current Volunteers Alfredo Sanchez Alfredo.Sanchez@rubicon-oilfield.com Rubicon Oilfield International Austin Freeman Austin.Freeman@bp.com BP Brandon Bourg Brandon.Bourg@weatherford.com Weatherford Brent Lirette brent.lirette@aot-llc.com Antelope Oil Tools Dale Doherty Dale.R.Doherty@conocophillips.com ConocoPhillips David Laurel David.Laurel@bakerhughes.com Baker Hughes David Stiles david.stiles@exxonmobil.com ExxonMobil Dennis Jiral DENNIS.JIRAL@Weatherford.com Glen Benge gbenge@sbcglobal.net Benge Consulting Gunnar DeBruijn gunnar1@slb.com Schlumberger Hank Rogers ceconsulting@cox.net Citadel Casing Solutions Jamie Reid James_Reid@oxy.com OXY John Hebert john.e.hebert@blackhawkst.com Blackhawk K.K. LaFleur kklaptop@gmail.com LaFleur Properties Keith Harless KHarless@gryphonoilfield.com Gryphon Oilfield Solutions Lonnie Helms Lonnie.Helms@Halliburton.com Halliburton Luis Padilla Luis.Padilla@chevron.com Chevron Max Rodrigue maxime.rodrigue@weatherford.com Scottie Scott scottie.scott@blackhawkst.com Wesley Johnson wesley.johnson@downholeusa.com Downhole Products
First Meeting - Participants
First Meeting - Content Safety moment Introductions Review original project proposal Discussion on document types Potential content Additional participants Timeline Define charge
RP vs TR Discussion 10TR6 10TR4 10TR5 RP 10F 19AC – completions accessories (iso 14998) Other
Potential Content Applications Types Testing procedures Performance reporting considerations Factors that affect life span Design and manufacturing considerations
Additional Participants Port collar manufacturers Other
Charge Proposal Develop an API document for stage cementing collars to include at minimum the following content: Applications Types Testing procedures Performance reporting considerations Factors that affect life span Design and manufacturing considerations The final content and document type to be defined based on the consensus of the task group and balloted to SC-10