Tom Lackowski Fermilab

Slides:



Advertisements
Similar presentations
Refrigeration & Air Conditioning
Advertisements

HVAC CONTROLS (See section 18.9)
Moisture to water converter. Out Line : Abstract Introduction Heat Pump Heat Pump Components Conclusion.
SANITARY DESIGN PRINCIPLES FOR FACILITIES. ZONES OF CONTROL.
9/17/07 ILC Detectors 1 Conventional Utilities Tom Lackowski.
Powered Platform Safety. © Business & Legal Reports, Inc Session Objectives You will be able to: Identify powered platform components Recognize.
NuMI Radiation and Environmental Protection NBI th International workshop on Neutrino Beams and Instrumentation September 5-9, 2006 Mike Martens.
INTRODUCTION IT’S ALL ABOUT YOUR PERSPECTIVE. WATER DAMAGE IS RESPONSIBLE FOR GREATER THAN 25% OF RESIDENTIAL INSURANCE CLAIMS ANNUALLY. IN THE U.S. THAT.
Preventative Heatstroke Cooling Shelter: ASHRAE Design Competition Andres Gomez Errick Santana Orangel Velazquez EML 4551 Ethics and Design Project Organization.
3-1 NFIRS 3 Structure Fire Module. 3-2 ObjectivesObjectives The participants will be able to: –describe when the Structure Fire Module is to be used.
1 Matakuliah: D0194 / Perancangan Sistem Kerja & Ergonomi.
March 14, 2003 MICE Absorber/Coil Integration MICE LH2 Absorber 1.Assembly 2.Safety 3.Staging 4.Instrumentation.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 28 July 2003 Sam Burke UCSB HEP Group.
Best Direction System Ltd.
Objective Learn about Cooling and Cooling systems Define heat pump Learn about energy storage systems.
1 HVAC OVERVIEW and VALUE ENGINEERING ITEMS August 13, 2008 CLIC Working Group CES Lee Hammond, Fermilab.
Value Engineering Session Air Treatment / HVAC November 27, 2007 Lee Hammond, FNAL CFS.
First Considerations on CLIC Cooling System Ch. Martel, J. Inigo-Golfin TS/CV.
Central Region Discussion Power and Cooling GDE Beijing-CFS.
31, May 2007 ILC DESY 07 1 Surface Building Design Development Tom Lackowski GDE.
1 Process Water and Air Treatment 01 June 2007 Emil Huedem, Maurice Ball, Lee Hammond Fermilab.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
DESIGN AND PERFORMANCE EVALUATION OF AN EVAPORATIVE HEAT EXCHANGER A.O. MURITALA, S.O. OBAYOPO, S.K. FASHOGBON, O.T. POPOOLA*, S.A ADIO Department of Mechanical.
Objective Address your concerns/suggestions Review Learn about Cooling Systems Compressor cooling circles Sorption coiling Evaporative cooling.
BDS Magnet-Power System-Facility Optimization1 ILC BDS Kickoff Meeting Basis for Magnet, Power System and Cooling Facility Optimization Discussion Paul.
Architectural acoustics Acoustical materials. Sound absorber: Reapor Expanded Glass Granulate  Description  The sound absorber for challenging environments.
CHAPTER 12 Copyright © 2007 Thomson Delmar Learning 12.1 Protective Systems.
Sept., 2007 European CF&S Kick Off Meeting 1 Plan for a Value Engineering Study T. Lackowski.
VENTILATION PRINCIPLE FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 28/7/2009 Already presented by C. Martel/ J Inigo Golfin on15 th October 2008 CLIC WORKSHOP.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
Thickness of the Kamaboko Tunnel Shield Wall under Different Assumptions Ewan Paterson Technical Board June 23,
SLAC_OCT07 BDS-KOM-CFS 1 Beam Delivery System & Interaction Region KOM Conventional Facility & Siting Overview Fred Asiri/SLAC Acknowledgment: Atsushi.
Relative Humidity. Humidity  the measure of the amount of water in the air  high humidity =lots of moisture in the air.
Fire Protection Systems Chapter 6. Fire Protection Systems Most of the time you will work with an electrical engineer or fire-protection designer to coordinate.
Purpose NEW BEAM DUMP TUNNEL Launch Safety Agreement - conventional aspects LIU-SPS external beam dump meeting - C. Colloca DGS/SEE LSA conventional.
3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP STATUS REPORT V. Kuchler,
Three Factors of Weather
VENTILATION PRINCIPLE FOR THE DRIVE BEAM TUNNEL CERN TS/CV Wednesday 9 th July 2008 CLIC.
Moisture in the Atmosphere Beaker demo. Humidity Humidity - how much moisture is in the air. Saturated air is air that is full of water. Dew point is.
April 5, 2005 PPD Informal FLARE Review T. Lackowski 1 FLARE Conventional Civil Construction.
Dew Point The temperature that the air needs to be cooled to reach saturation (100% humidity) Cooling the air below the dew point causes the water vapor.
7/15/2002PP.AFD.09 1 of 43 Yaskawa Electric America Variable Frequency Drives In HVAC Applications.
MECH1300 Pneumatic Components Topics Pneumatic Cylinders Pneumatic Motors Other Pneumatic Actuators Pneumatic Directional Control Valves Pneumatic Flow.
AWLC14 - FERMILAB May 12-16, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, A Enomoto, J Osborne.
Boiler Energy Saver Advanced Boiler Controls. Most boiler controls at present consist of a switch!
Summary of Presentation 1. Tolerances i. Vertical tolerances on BPMs (rf-BPM: ± 0.2μm, user BPMs: ±0.1μm, and X-BPMs: ± 0.1μm) ii. Tolerances on magnets’
1 CFS Utilities – What’s included in RDR for IR July CFS Utilities – IRENG WG C WATER COOLING: none. Unknown loads on IR. Only have water plants.
CFS EDR KICK OFF MEETING Air Treatment August 23, 2007 Lee Hammond, FNAL CFS.
E- source kick-off meeting e- Source RDR- Conventional Facility & Siting Overview Fred Asiri/SLAC.
Date of download: 9/19/2016 Copyright © ASME. All rights reserved. From: On Scaling Down Turbines to Millimeter Size J. Eng. Gas Turbines Power. 2008;130(5):
CPMGT 300 Week 3 Learning Team Planning Process Groups and Developing the Scope Check this A+ tutorial guideline at
Haz-Mat Incident Considerations
Liming Yuan, Alex C. Smith  Process Safety and Environmental Protection 
AIR CONDITIONING SYSTEM
Review of the International Linear Collider (ILC) Electrical and Mechanical System Design to be held at CERN on 21 March, 2012 The purpose of the Review.
FCU Controller M/FCU
Installation Global System
Conventional Facility & Siting (CF&S) Overview for the Positron Source
Americas KlyCluster Cost Analysis Overview
ROCKET TESTING TYPES OF TESTS
Reliability targets in functional specifications
AUTOMATIC SPRINKLERS.
To understand the processes involved in the water cycle
NFIRS 3 Structure Fire Module
Draw this H L.
Calibrated Energy Models: One New Change
To understand the processes involved in the water cycle
How is relative humidity measured? What is the dew point?
Relative Humidity (Evaporation).
Presentation transcript:

Tom Lackowski Fermilab Tunnel Temp Issues (Limitations, Requirements, Desirable Features, Design) Tom Lackowski Fermilab 7 Sept 06 ILC Power and Water Issues

ILC Power and Water Issues Major Breakdown Creature Comforts Work environment Productivity Machine environment Life cycle cost Reliability 7 Sept 06 ILC Power and Water Issues

ILC Power and Water Issues Creature Comforts A combination of temperature and humidity – WB & DB Temperature Initial installation, during operations, during shutdowns periods OSHA Guidelines Criteria is subjective, based on type of work and % of rest time allotment Need to understand the type of work, duration of work, and hazards of the work in order to reach a consensus that is reasonable, 7 Sept 06 ILC Power and Water Issues

ILC Power and Water Issues Machine Environment Beam Tunnel Humidity Conventional will require the humidity to be maintained below “wet” conditions to protect conduits, concrete, and structural attachments. Other requirements? Air Flow Flow for humidity control, personnel access, and to control gas build-up. Fire and purge separate. Temperature (Stability) ? 7 Sept 06 ILC Power and Water Issues

ILC Power and Water Issues Machine Environment Service Tunnel Humidity Air Flow Temperature 7 Sept 06 ILC Power and Water Issues

ILC Power and Water Issues Service Tunnel Humidity and Air Flow – similar requirements as Beam Tunnel. Temperature Heat to air can be controlled for a number of components. Air temperature models being modeled at Fermilab. (Just started – need three weeks) Certain components benefit from a reduced operating temperature – can be resolved via a number of alternative designs. Currently the criteria for temperature stems from assumptions made for creature comforts. 7 Sept 06 ILC Power and Water Issues

Creature Comforts – Service Tun. Discussion topics Current design assumptions Tunnel occupancy, frequency, type of work activities Consensus on OSHA description Design alternatives and cost drivers 7 Sept 06 ILC Power and Water Issues