Martin Dommach TDR ART Review, Hamburg, September 14, 2012

Slides:



Advertisements
Similar presentations
31/03/11FV 1 CEDAR from flammable gas safety point of view.
Advertisements

M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
Progress and Plan for Superconducting RF Cavity RF Group.
Oak Ridge SNS Experimental Facilities X /arb 1 SNS MPS Review Target-MPS Review WBS Ron Battle Target Controls, Target Systems Experimental.
The MICE vacuum system Presented by Mark Tucker at CM-39, 26 June 2014.
The ESS vacuum team has overall responsibility for all technical vacuum systems used on the: Accelerator, Target and Neutron Scattering Instruments and.
30/05-03/06/2007 LCWS2007 and ILC2007, DESY Hamburg Germany Vacuum System Specifications What needs to be specified in Vacuum Specification for ICL Damping.
1 BROOKHAVEN SCIENCE ASSOCIATES Vacuum Systems H.C. Hseuh, Vacuum Group Leader 8 th ASAC Meeting for NSLS-II Project May 10-11, 2011.
SuperFRS Multiplett and Dipole Vacuum Interfaces Multiplett: Insulation vacuum: Insulation Vacuum Pumping flanges: Two CF flanges of the size DN160 must.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
Workshop “Vacuum systems of Synchrotron Light Sources“ organized by MAX-LAB & ALBA Barcelona, th September 2005 Instrumentation and Vacuum Control.
Vacuum / cryo links Mechanical design issues Jo van den Brand, Martin Doets Nikhef Cascina, January 21,
Date Event Global Design Effort 1 Technical System Review John Noonan, ANL Yusuke Suetsugu,KEK Paolo Michelato, INFN Milano.
MICE CC Test Status Ruben Carcagno 11/06/13 1. Cooldown Coil Temperature (calculated average in each of 8 coil segments) SC Transition (voltages across.
F. Mazzolini Vacuum Systems for Synchrotron Light Sources Barcelona, September 12– Front-end vacuum system F.Mazzolini.
NLC - The Next Linear Collider Project NLC Beam Delivery Lehman Review, May 1999 Vacuum System Cost Model Presentation by Leif Eriksson.
ELENA Vacuum System R. Kersevan, TE-VSC-IVM R. Kersevan, “ELENA Vacuum System”, - ELENA Project Review, Oct14-15, 2013, CERN.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
The Operation of the Tevatron Vacuum system Authors David Augustine Alex Chen Scott McCormick 1.
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
ESS Vacuum Systems TAC 6 November 2012 Peter Ladd Senior Vacuum Expert.
ESS Vacuum Standardization
Warm Girder UHV Components John Heckman Anthony DiPette Vacuum Group 2/29/2016.
Failure Analysis Tools at DESY. M. Bieler, T. Lensch, M. Werner, DESY ARW 2013, Melbourne,
Ullrich, DESY Dubna GDE XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser 1 Water cooling XFEL Desingn of the XFEL water cooling.
Vacuum Related Procedures and Tools of IHEP ILC Test Cryomodule Assembly Jiyuan Zhai (IHEP) TTC Topical Workshop on SRF Cryomodule Clean Room Assembly.
Extra / Discussion Slides. 2 1.Helium Top Fill Port Add extra CF/ISO flange as collar so that the weld-region is not disturbed 2.Helium bottom FillCF.
1 IPN Orsay / Division Accélérateurs The Spoke cryomodule Vacuum aspects P. DUTHIL on behalf of the IPNO team ESS Lund February 19 th 2013.
Paolo Michelato, July 19-22, 2006 Global Design Effort 1 Vacuum system segmentation Cold vacuum system segmentation reflects the cryogenic structure of.
Status Report of the Review of Vacuum Systems and Procedures Tug Arkan, Allan Rowe 3/7/
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
Cleanrooms Keith Middleman. Particulates and Clean rooms What is a particulate? Small discrete mass of solid or liquid. Human hair is microns in.
01/09/ KTAG 5/8 sectors equipped DCS system in pogress DAQ commissioning in progress Test pressure scan this week (t.b.c) 01/09/20142.
MicroTCA Development and Status
Field Emission Minimization for LCLS-II
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
Sub-system integration for the VBOX
Rosario Turrisi INFN Padova
DESY Experiences on Use of Gas overlay during Assemblies
HFM Test Station Main Cryostat
Proximity Cryogenics P&IDs meeting
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
E-XFEL Status and First Beam Results
General remarks about the HESR and PANDA vacuum system
Preliminary Y-chamber specifications – First draft
Mathieu, Gabriel, Max, Spyros, Guillaume
XFEL Vacuum System Commissioning
WP02 PRR: Master Oscillator and RF Reference Distribution
WP02 PRR: Master Oscillator and RF Reference Distribution
Racks Coordination 16 September 2011 E. Negodin
for X-ray Optics and Beam Transport
Interferometric measurements on mirrors
WP-73 TDR ART Review Report: Hard X-Ray Monochromator
WP 3 coordination meeting Saclay May 2008
WP Coordinaten XFEL RF Operation
WP02 PRR: Master Oscillator and RF Reference Distribution
Markus Hüning 3rd XFEL Collaboration Meeting
XFEL Collimation and Beam Switchyard Vacuum Issues
IMP Cryomodule Assembly and Alignment
ESS elliptical cryomodule
Installation of Photon Beam Transport to FEH
ISRC and LEBT Vacuum System Design
Ola Ingemansson Electrical & Instrumentation Engineer
Operation of Target Safety System (TSS)
Vacuum Control System for Monolith Vacuum
Vacuum System Design for the Target Monolith System
Overview of the TARGET Monolith Rough Vacuum
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
Presentation transcript:

Martin Dommach TDR ART Review, Hamburg, September 14, 2012 Vacuum System Martin Dommach TDR ART Review, Hamburg, September 14, 2012 How to edit the title slide Upper area: Title of your talk, max. 2 rows of the defined size (55 pt) Lower area (subtitle): Conference/meeting/workshop, location, date, your name and affiliation, max. 4 rows of the defined size (32 pt) Change the partner logos or add others in the last row.

Cleaning of components Pump down procedure Outline Overview Mechanical design Cleaning of components Pump down procedure Calculation of pressure profiles and pump failure analysis Interface to accelerator vacuum and to instruments Vacuum control system WP-73 TDR ART Meeting, Hamburg, September 14, 2012 Martin Dommach

More than 3 km of vacuum system to be installed Overview More than 3 km of vacuum system to be installed Installation starts in October 2013 Installation order: SASE1, SASE3, SASE2 ≈ 9 months installation time per beamline WP-73 TDR ART Meeting, Hamburg, September 14, 2012 Martin Dommach

All vacuum parts are made of stainless steel Mechanical design All vacuum parts are made of stainless steel Standard pipe length is 6 m Only use of CF-flanges with copper gaskets All-metal angle valves between air and vacuum (roughing and venting valves) Viton sealed gate valves to separate different vacuum sections All-metal gate valves at the interfaces to the instruments and to the linear accelerator Installation of an 75 l/s Ion pump roughly every 30 m and larger pumps on optical and diagnostic elements WP-73 TDR ART Meeting, Hamburg, September 14, 2012 Martin Dommach

All vacuum parts have to be hydrocarbon free Cleaning All vacuum parts have to be hydrocarbon free Pressure of mass 45-100 has to be less than 10-3 of total pressure Lab washer to clean parts up to 60 x 60 x 70 cm size Industrial partner for cleaning of larger pipes and vessels RGA-Test setup to proof cleanness RGA-setup Lab washer, installed at HERA Süd lab WP-73 TDR ART Meeting, Hamburg, September 14, 2012 Martin Dommach

Particle free areas ±30 m around mirrors and gratings Assembly in cleanroom class ISO 5 Small cleanroom tents for installation in the tunnel Installation of fast safety valves upstream the distribution mirrors To prevent venting Only one instrument of a beamline will be affected in the case of an air inrush To avoid particle transport towards the mirror WP-73 TDR ART Meeting, Hamburg, September 14, 2012 Martin Dommach

Main components DN100 gate valve DN16 all metal venting valve with particle filter 75l/s ion pump DN40 all-metal rough pumping valve tube support DN100 vacuum pipe Main components for beam transport Long tubes WP-73 TDR ART Meeting, Hamburg, September 14, 2012 Martin Dommach

On site orbital welding 18 m sections made of three prefabricated parts For long distances (at SASE2 several 100 m) Purchase of the pipes cleaned and sealed in foils, ready for orbital welding in the tunnel Good experience at LCLS Used for beam transport between near and far hall Less potential leaks Less installation work Less expensive WP-73 TDR ART Meeting, Hamburg, September 14, 2012 Martin Dommach LCLS, May 2011

Mobile pumping station Used to pump down beam transport sections before starting the ion pumps Hydrocarbon free – no lubricants 80 l/s turbo pump 10 m3/h scroll pump Rough pumping via bypass, to get better conductance Reducing of scroll pump run-time by using a buffer volume Optional RGA or leak test unit Beckhoff PLC with touch panel, remote controllable WP-73 TDR ART Meeting, Hamburg, September 14, 2012 Martin Dommach

Mobile pumping station Status: Prototype is ready for use Design of a smaller version is finished Small “series production” of pumping carts is ongoing 3 small carts 3 lager ones WP-73 TDR ART Meeting, Hamburg, September 14, 2012 Martin Dommach

Estimation of pump down time Assumption: One pump station DN100 vacuum pipe 67 m long pipe Outgassing: Pump down using one mobile pump station shown on previousslide Graph shows pressure at the end of the 67m long tube After 2-3 days its possible to switch on ion pumps An other development is the SASE3 gas attenuator… WP-73 TDR ART Meeting, Hamburg, September 14, 2012 Martin Dommach

Pumping down and venting For initial pump down the pump stations are used for ≈60 h to reach 10-5 mbar pressure to start the ion pumps Further maintenance breaks require less pump down time due to controlled venting and use of more pump stations The operation and control of the process is done manually The exhaust gas of the pump stations will be discharged into the tunnels Venting the vacuum system will be done using dry Nitrogen All venting valves are equipped with particle filters to avoid contamination WP-73 TDR ART Meeting, Hamburg, September 14, 2012 Martin Dommach

Calculation pressure profiles Example: straight section of 240 m Stainless steel tube, inner diameter 100 mm (DN100) CF-flanges, metal gaskets Outgassing assumption 1 x 10-10 8 ion pumps 75 l/s, one pump every 30 m At 10-6 mbar the pump lifetime will be 80000 h (≈ 9 years) What happens if one or more pumps fail? Calculations made with CalcVac software (M. Hoffmann, M. Seidel, DESY) WP-73 TDR ART Meeting, Hamburg, September 14, 2012 Martin Dommach

All 8 ion pumps operational WP-73 TDR ART Meeting, Hamburg, September 14, 2012 Martin Dommach

1 pump failing WP-73 TDR ART Meeting, Hamburg, September 14, 2012 Martin Dommach

2 pumps failing WP-73 TDR ART Meeting, Hamburg, September 14, 2012 Martin Dommach

3 pumps failing WP-73 TDR ART Meeting, Hamburg, September 14, 2012 Martin Dommach

4 pumps failing WP-73 TDR ART Meeting, Hamburg, September 14, 2012 Martin Dommach

Pump failure analysis - summary Worst case included: failure of four pumps Only the pumps adjacent to the failed pumps experience an increase in pressure, but the pressure will be still in the 10-7 mbar range They can be used like this at least for a few weeks Exchange of the faulty pumps can be shifted to next maintenance period Mobile pumping stations can be connected to the beam pipe as a backup Assumptions on achievable end pressure will be tested in HERA south lab WP-73 TDR ART Meeting, Hamburg, September 14, 2012 Martin Dommach

Interface to WP-19 (accelerator vacuum system) V0 all-metal gate valve Operated by WP-73 Two sets of limit switches Fast safety valve Fast safety valve controller Redundant pair of vacuum sensors 100m away from safety valve Getter pump and Vacuum gauge WP-19 Getter pump WP-73 Getter pump WP-19 Line represents the vacuum pipe V0 – valve as a hand over position WP-73 TDR ART Meeting, Hamburg, September 14, 2012 Martin Dommach

Interface to the instruments WP-73 TDR ART Meeting, Hamburg, September 14, 2012 Martin Dommach

Modular system, easy to extend Vacuum control system Based on Beckhoff PLC: EtherCAT technology Ring topology Modular system, easy to extend Racks in the tunnels every 100m, provided by WP-76: Water cooled 230V power outlets Computer network connection PLC software & user interface by WP-76 WP-73 TDR ART Meeting, Hamburg, September 14, 2012 Martin Dommach

Vacuum control system - devices Components operated by the vacuum control system Vacuum pumps Gate valves Pressure gauges Fast safety valves Gas attenuator Residual gas analyzers Differential pumping units Other sensors (temperature, air pressure, Cooling water flow…) User interface Archive Machine Protection System Main PC (XHQ) PLC- software … Rack 1 (Tunnel) I/O, controllers getter pumps gauges …   Rack 2 (Tunnel) I/O, controllers getter pumps gauges gate-valve … Rack n (Tunnel) I/O, controllers WP-73 TDR ART Meeting, Hamburg, September 14, 2012 Martin Dommach

Vacuum control system – interfaces Accelerator Vacuum System (WP-19) Instrument Control System MID Instrument Control System HED Instrument Control System SPB Instrument Control System FXE Instrument Control System SQS Instrument Control System SCS Personal Interlock Injector Machine ProtectionSystem V0 and fast safety valve close or error Vacuum OK All valves open? Beckhoff online? Error? Mode 1-5 Inst. ready, vacuum OK Different interfaces To machine protection system Instruments More detailed the interface to WP-19 WP-73 TDR ART Meeting, Hamburg, September 14, 2012 Martin Dommach

Thank you for your attention! WP-73 TDR ART Meeting, Hamburg, September 14, 2012 Martin Dommach