SCT Power Supply Installation Schedule Jan Bohm, Prague AS, 4 th November 2005 The SCT Power Supply System will be installed in 22 LV&HV racks situated.
Advertisements

Uli Schäfer 1 JEM: Status and plans Pre-Production modules Status Plans.
Uli Schäfer 1 JEM: Status and plans Pre-Production modules Status Plans.
Uli Schäfer 1 JEM: Status and plans JEM1.2 Status Test results Plans.
Uli Schäfer 1 JEM1: Status and plans JEM1.1 Status Plans.
Bad Fibers LIU Qian. Today we put the bundle 2 (West bundle) into the protecting tube. Common end 9 m barrel 5.6 m 9.4 m Put into coiled tube Put into.
Uli Schäfer 1 Production modules Status Plans JEM: Status and plans.
EE Mainz meeting 5/3/03 Calorimeter-to-trigger connectivity u Documentation t Excel tables by Steve and Murrough give full detail t LAr has been checked.
29 November 2005A.Ciocio - SCTSG1 Type IV Cables and PP3 Status of Type IV installation Connector in situ work Status of PP3 Testing.
Readout electronics for the MUV detectors R. Fantechi 28/3/2012.
Alex Madorsky University of Florida/Physics Track Finder production readiness review, Rice, August 2004 Track Finder Crate, Backplane and Parts Alex Madorsky.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
13 June 2013Laurent Roy Optical Fibers / Electronics Upgrade -Fibers need for Upgrade -> Installation ? -Two techniques possible for multi fibers installation.
John Coughlan Tracker Week Feb FED Status FED Production Status Transition Card.
r1Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling YB+2 and YB+1, extension to minus wheels and YB0, cables between UXC55 and USC55.
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
Ideas about Tests and Sequencing C.N.P.Gee Rutherford Appleton Laboratory 3rd March 2001.
Neil JacksonUK-V RAL 8th September Module to Disc Assembly Infrastructure –Services and test box –Evaporative cooling system –Disc Handling Tests.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
E.Guschin (INR,Moscow) 17 July 2007 CALO commissioning group meeting CERN Status of PS/SPD LED system.
SL1Calo Input Signal-Handling Requirements Joint Calorimeter – L1 Trigger Workshop November 2008 Norman Gee.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
BI.DIS10: Magnets & generators R. Rosol, L. Sermeus, T. Stadlbauer, TE-ABT LIU review, 20 November
SCTSG - 17 October 2006 A. Ciocio1 SCT Services Installation Update Recent Full Report: September ID week SCT Cables Web page:
1/5 ECAL/HCAL Front-end status Calorimeter Meeting Frédéric Machefert Wednesday February 9 th, 2011.
8/September/2008Calo Running and Operation Meeting 1 SPD running and operation: progress report and plans Calo running and operation meeting – CERN 8 th.
8 June 2006A.Ciocio - SCTSG1 Status of Type IV Cables Cables production –resumed in February after 3 months stop –See ID week February ‘06 Delivery of.
1J. Gu CERN CSC Meeting July 2008 DAQMB/FEBs Readiness for First Beam Jianui Gu The Ohio State University.
V. Bobillier1 Cable installation status.
31 January 2006A.Ciocio - SCTSG1 Type ii-iii and PP1 Production Timescale for installation Plan PP1and Testing.
L1Calo Installation Status Murrough Landon, QMUL Level-1 Calorimeter Trigger (University of Birmingham, University of Heidelberg, University of Mainz,
4 May 2006May 06 PMG - Paul R1 AFEII-t Status May 4, 2006 PMG Paul Rubinov.
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
L1Calo Databases ● Overview ● Trigger Configuration DB ● L1Calo OKS Database ● L1Calo COOL Database ● ACE Murrough Landon 16 June 2008.
Schedule ● External Links ● Calorimeter Signals ● Internal Tests ● System Tests ● Combined Runs ● Schedule Murrough Landon 19 April 2007 A brief update.
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
L1Calo DBs: Status and Plans ● Overview of L1Calo databases ● Present status ● Plans Murrough Landon 20 November 2006.
S A Griffiths CM42 June 2015 Electrical & Control.
M4 Operations ● Operational model for M4 ● Shifts and Experts ● Documentation and Checklists ● Control Room(s) ● AOB Murrough Landon 24 July 2007.
Calibration Operations ● Recent Changes ● Required Changes ● Calibration by Shifters Murrough Landon 23 March 2011.
Rainer Stamen, Norman Gee
PIXEL CAEN Installation Status
Cables for the RE4 Upscope in CMS
High energy beam transport.
Online Database Work Overview Work needed for OKS database
TOTEM Electronics Status
CLAS12 DAQ & Trigger Status
LKr status R. Fantechi.
LAV front-end and readout status
Service channels between Tracker and PP1
Optoelectronics internal report, 17 August 2007
TVB TVB X 14 TRIG40 (tell40 structure) Selection board in barrack
Online Database Status
TDCB status Jacopo Pinzino, Stefano Venditti
Online Software Status
Remaining Online SW Tasks
Level 1 (Calo) Databases
Cabling Lengths and Timing
F.Guber, A.Ivashkin INR, Moscow
Online Software “To Do” List
Radiation Laboratory Meeting
Front-End Cabling ‘Bible’
Joint Meeting Wrap-up I’ve cheated Partially justified?
Track Finder Crate, Backplane and Parts
BLM planning 03/02/2014.
(Not just) Backplane transmission options
The Country Outhouse assembly Instruction By Laser Dollhouse Designs
Presentation transcript:

Nearly the end of a long story... Cabling Status Murrough Landon 28 June 2007 Nearly the end of a long story... Overview Analogue cables LVDS cables Glink fibres Remaining work

Overview

Analogue Cables Almost all short analogue cables are now installed Remaining are 80 lower C side RPPP cables About 2 or 3 days work, considered low priority About 40 connectors needed minor repairs Open connector, broken glue These should be retested using the Saclay tester in USA15 Need extension cables? Alain Le Coguie still has all the test results He plans to write a tool to parse his files and enter the results in a database, both for LAr and our cables Tricky as many test files are misnamed Connectivity tests still required for almost all cables! Only 32 of 776 checked properly with calo pulses

Analogue Cables: First Full PPM Rack

LVDS Cables (1) All LVDS cable bundles installed, including spares 1888 cables plus 100 spares in about 200 bundles Many thanks to large number of helpers Both JEP crates and 2 of 4 CP crates connected Lot of work tidying the cable bundles so the power supplies and back doors can be closed Three (of 8) PP crates connected (A side) Still to be done: middle two CP crates, one A side & four C side PP crates comprehensive testing (needs full PP and CP crates)

LVDS Cables (2) Small fraction of LVDS cables now tested Four JEMs and two CPMs fed from eight PPMs 68 out of 1888 LVDS cable assemblies Only basic connection tests (no check for swaps) One error so far four cables displaced upwards by one row of pins top of CPM slot so easiest to correct

LVDS Cables: Before and After

LVDS Cables: First Few Connections

LVDS Cables: First Complete Crate

LVDS Cables: Beautifully Tidy!

Glink Fibres Need 124 fibres, under the floor, from PP crates Separate lengths for C, A sides Ordered, not yet delivered Need 200 fibres from CP and JEP crates Across the front of the racks Large number of separate precise lengths (to 10cm) Ordered (a bit later), not yet delivered Requested protective wrapping from R. Mclaren Aim to install late July or early August

Summary of Remaining Work Install last 80 RPPP cables: half a cabling week Connect last two CP crates: half a cabling week Test repaired analogue cables: half a week? Connectors on TCPP cables not yet checked? Connect remaining five PP crates: two weeks? Paul and Klaus according to their own schedule... Install underfloor glink fibres: one day? One further cabling week planned: 9 July Might need one more week? Also need to install muon terminators at TCPPs Except for channels used for TileCal cosmic trigger

Caveat Few of the installed cables have been tested Neither analogue nor LVDS cables Any bad LVDS cables will be hard to reconnect Very fiddly and hard to access Ditto any miscablings in the analogue system Cables cut to “correct” length Any problems could mean a lot more work!