ELENA tune measurement

Slides:



Advertisements
Similar presentations
MICE RF TEST STAND Major Milestones (2006) –Testing of BURLE 4616 circuit September 2006 –Testing of 4616 circuit with full amplitude and phase control.
Advertisements

MERIT review, Dec. 2005CERN AB-ATB1 CERN Installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
BLM FOR THE INJECTORS PROJECT CABLING NON-CONFORMITIES LIU-PSB Working Group Meeting (15/08/2013) Christos Zamantzas
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
UF-PNPI HV system upgrade Presented by N. Bondar. CERN  Part 1. HV System migration to USB interface  Part 2. HV System proposal of Stage 2.
ELENA – Electron Cooler Vacuum design Benjamin Moles March 26 th 2015 on behalf of Electron Cooler team : Gerard Tranquille Jean Cenede Lars Soby Lars.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
1 ALICE T0 detector W.H.Trzaska (on behalf of T0 Group) LHCC Comprehensive Review, March 2003.
Page 1 BaBar IFR Mechanical, Schedule Cost Review Outbriefing (1) Excellent job on preparing and presenting review Overall, the Committee feels that the.
BBQ system Tatiana and Benoit, thanks to a lot of help from Christian Boccard, Marek Gasior and Ralph Steinhagen (BE/BI-QP)
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
Technical Support Activities in PH-ADO-PO
Tunnel Gallery Girders x ADC’s HV Power supply Rack channels digitizer VME module (SIS3300), 12 bits 96.
Status of NA62 straw electronics Webs Covers Services Readout.
BI.DIS10: Magnets & generators R. Rosol, L. Sermeus, T. Stadlbauer, TE-ABT LIU review, 20 November
Summary of the WA104, T600 overhauling programme C. Montanari – INFN-PV, Italy M. Nessi – CERN, Switzerland weekly meeting, December 18,
R. Rosol, LIU-PSB review, 10 September BI.DIS Pulse generators R. Rosol, LIU-PSB review, 10 September Luc SERMEUS, Rodolphe ROSOL Laurent.
CERN September 29, 20041W.H.Trzaska HIP Jyväskylä T0 – TDR 22 nd LHCC meeting; Open Session CERN, September 29, 2004 W.H.Trzaska (for T0 collaboration)
1 V. Kashikhin for ILC ALCPG 2007, FNAL Meeting October 23, 2007 Ring to Main Linac Magnets.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
ELENA Hardware Baseline Current Document Status T. Birtwistle EN-MEF-DC.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Long DB Si- telescope Integration of a Si-telescope in the HIE ISOLDE long diagnostic boxes 21/09/2015LDB Si-telescope1.
Gas system for NA62 Straw detector Roberto Guida On behalf of Gas Service Team NA62 Straw working meeting, March 26, 2012 Outline: P&I Drawing Schedule.
18, 19, 20 February 2002 Power Converters for magnets (PBS 1.2.3) R. GENAND SL/PO 1 Power Converters for Magnets –Introduction –Specification Magnet characteristics.
Agenda 1 BOSS Meeting - 27/5/ : :10 Introduction and aims of the workshop 10‘ 09: :25 Priorities from OP for PSB and transfer lines 15'
INJECTORS BLM SYSTEM: PROGRESS REPORT Christos Zamantzas on behalf of the BLM team. MSWG 28/08/2015.
Status of the Spanish contribution to CTF3 L. García-Tabarés, F. ToralCERN, 17/9/2006.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
ATLAS TRT Duke University CERN, Feb Fuse Box Status Duke University.
Proposal for Microstation Prototype Jaak Lippmaa CERN 2005.
Cost and schedule for ELENA Beam Transfer Systems W. Bartmann, J. Borburgh, E. Carlier, L. Ducimetiere, T. Fowler, M. Hourican, R. Ostojic, L. Sermeus.
ELENA installation progress F. Butin / ELENA collaboration.
LKr status R. Fantechi.
ELENA scrapers ELENA status for BI – electronics and software
LAV front-end and readout status
Brief Status SPS Prototype PSB Prototype Installed in LS1
LIU Wire Scanner Milestones June 2017
Flexible lines production and planning
LIU – EVM status and next steps
Injectors BLM system: PS Ring installation at EYETS
LEIR IMPEDANCE AND INSTABILITY MEASUREMENTS
Working plan for 2017 Acquisition and Control Electronics
G.Alexeev for Dubna group ITEP, April 28, Muon System Status Report from Dubna.
ELENA – Electron Cooler
The ELENA BPM System. Status and Plans.
Status of the BI Work Package in the LIU-PSB frame
Beam instrumentation for the upcoming TIDVG#5
ELENA electron cooler and SEM grids status
352MHz Klystron Control for the 3MeV Linac test stand
Update on the Ethernet Network Installation Campaign
10/month is the present production rate 2 FTE + sporadic contributions
AMMS-WG BE-BI and PPE 9/12/2018.
AWAKE status and readiness for phase #2
LIU Wire Scanner Series Costs
Conclusions of LCWS08 & ILC08, Chicago, November ‘08
Pierluigi Paolucci - I.N.F.N. Naples
RPC HV&LV status Introduction HV power supply tender
CONSOLIDATION CPS-BL SYSTEM

HL-LHC upgrade at IPHC news
Upgrade Phase 2 Mechanics meeting, 21 March 2013 Introduction
ELENA / AD Pick-ups and Schottky
East Hall under construction
Rack installation and local tests for the MEBT Chopper Rack
Status of the BI Work Package in the LIU-PSB frame
Presentation transcript:

ELENA tune measurement Joel Albertone, Christian Boccard, Marek Gasior, Thibaut Lefevre (BE-BI) Benjamin Moles, Antti Juhani (EN-MME) ELENA tune measurement

Tune measurement systems at CERN ELENA tune measurement

ELENA tune measurement PS stripline ELENA tune measurement

ELENA tune measurement ELENA stripline ELENA tune measurement

ELENA tune measurement ELENA stripline ELENA tune measurement

ELENA BBQ electronics – Prototyping on AD Curtesy of M. Ludwig ELENA tune measurement

ELENA tune measurement Summary Striplines: the same design for the kicker and the pick-up; mechanical design ready; production drawings to be started in a few weeks; coaxial feed-throughs: chosen, one offer ready; production and assembly ready by the end of the year. Electronics: acquisition + BBQ front-end prototyped on AD; LNA integrated with the detectors (= active detectors) to be produced (design ready); Active detectors will be tested on AD this year. Miscellaneous: cables to be pulled (racks ready ?); kicker pulsers and HV power supply: to be discussed with the kicker team (in general for all BBQ systems) Budget: total 150 kCHF; 15 kCHF spent so far (drawing office); 60 kCHF foreseen for manufacturing of the striplines; 75 kCHF should be enough for the rest. ELENA tune measurement