Valenciennes, 15th November 2017

Slides:



Advertisements
Similar presentations
Interfacing Risk and Systems Engineering – Left Shift Risk Management
Advertisements

European Commission - DG Environment Clean Air for Europe Jacques Delsalle European Commission European Commission DG Environment, Unit C1 Update on TREMOVE.
Configuration Management
SCORT/TRB Rail Capacity Workshop - Jacksonville Florida1 1  A Primer on Capacity Principles  New Technologies  Public Sector Needs 22 September
A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission WP 1: Specification and evaluation.
CENTRAL EUROPE PROGRAMME SUCCESS FACTORS FOR PROJECT DEVELOPMENT: focus on activities and partnership JTS CENTRAL EUROPE PROGRAMME.
Rational Unified Process
How are service providers helping their customers to deliver IT as a Service? Peter Glock – Orange Business Services 18 May 2011, presentation to Europe.
Overview of the IT 3 Initiative CONFIDENTIAL Discussion Document September 2008.
ERTMS state of the art and evolution of the applications considering customer’s orientations.
The Preparatory Phase Proposal a first draft to be discussed.
Mantychore Oct 2010 WP 7 Andrew Mackarel. Agenda 1. Scope of the WP 2. Mm distribution 3. The WP plan 4. Objectives 5. Deliverables 6. Deadlines 7. Partners.
Industrial Software Project Management Some views on project managing industrial and business software projects.
InterDynamics Pty Ltd Planning, Scheduling Risk Systems Peter Page Managing Director 4 October
Remedy – Customer Portal Fiona Gregory McKesson CRM 1.
provide information ESSnet on consistency of concepts and applied methods of business and trade related statistics Session 2 : Business.
Reducing the Risk of Embankment Failure Under Extreme Conditions Mark Morris HR Wallingford IMPACT Project Workshop Wallingford, 17 May 2002.
6-7 / 3 /2006 INSEAD Campus - Fontainebleau WP5: Exploitation and Dissemination General approach and scheduling on deliverable: D5.1 Dissemination and.
European Commission 1 Directorate General for Energy and Transport Discussion for a co-ordinated trans-European Deployment Plan for ERTMS 15 June 2004.
Company for Urban Innovative Transport (CUIT) 19/12/2007 Request for proposal.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
Changing the way the New Zealand Aid Programme monitors and evaluates its Aid Ingrid van Aalst Principal Evaluation Manager Development Strategy & Effectiveness.
Funding: STEER – INTELLIGENT ENERGY EUROPE (IEE) Grant Agreement IEE/10/290/SI Full title: ECOSTARS Europe Acronym: ECOSTARS Project start date:
Federal Funding Strategies Update Internal Working Document Update on Federal Funding California High-Speed Rail Authority In Partnership with: Kadesh.
Demonstrating Digital Railway
Common Understanding on Major Horizontal Issues and Legal Obstacles Excerpts from the relevant sections of the ToR: II. Working items to be covered (details.
Exploitation means to use and benefit from something. For Erasmus+ this means maximising the potential of the funded activities, so that the results are.
Capacity Building in: GEO Strategic Plan 2016 – 2025 and Work Programme 2016 Andiswa Mlisa GEO Secretariat Workshop on Capacity Building and Developing.
Scientific, technical and socio-economic aspects of impacts of, and vulnerability and adaptation to, climate change SBSTA in-session workshop on Scientific,
Power of Choice (PoC) Program Overview
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
Rapid Launch Workshop ©CC BY-SA.
Informal document GRRF-84-32
Supportability Design Considerations
Configuration Management
Maintenance BC - NZTA assessment in TIO
PERSONAL SAFETY INTERLOCKS External EHS Expert Panel Workshop
* MARKET SYSTEM RELEASE UPDATE Modifications Committee Meeting 9 August 2011 * 1##
Programme Management Board
Submitted by the expert form Japan Document No. ITS/AD-09-12
Configuration Management
EU Implementation Programme
PROGRAM CONSULTATIVE FORUM Meeting pack
Railway Mobile Communication System Future Dan Mandoc,
Session II: System authority for ERTMS 4RP Trackside approval
Transmission Planning Code
<Name of Product>Pilot Closeout Meeting <Customer Name>
Shift2Rail, innovating ERTMS Control Command and Railway Communication Conference 16 November 2017, Valenciennes Giorgio Travaini, Head of Research &
15-16 November 2017 Valenciennes, Cité des Congrès
Network/route compatibility
The ERA EVORA Program Evolution of railway radio communication
ATO over ETCS Benoît BIENFAIT 10/2/2016.
Closing Plenary.
Planning a Learning Unit
SL026/17 – Product Acceptance
Knowledge Translation
CYRAIL Final Conference ERA on cybersecurity
High level seminar on the implementation of the
Exit Capacity Substitution and Revision
Power of Choice (PoC) Program Overview
Update on Exit Capacity Substitution and Revision
RF System (HLRF, LLRF, Controls) EDR Plan Overview
SmartMeterTM Steering Committee Update – November 2012
XRN4361 – UK Link Future Release 2
REVIEW OF RAPDRP PART A PROGRESS IN KARNATAKA 28-July-2014
Programme Management Board
XRN Nov 19 Release - Status Update
Street Manager High-level roadmap
XRN Nov 19 Release - Status Update
Status of Preliminary Reasonable Progress Analysis
Presentation transcript:

Valenciennes, 15th November 2017 ETCS L3 Valenciennes, 15th November 2017

Business & Migration Objectives ETCS L3 – Agenda Business & Migration Objectives System concepts and main conceptual challenges Architecture and assumptions S2R planning ERA planning

ETCS L3 – Business Objectives Capacity increase (due to moving block or short fixed virtual blocks) Cost reduction (due to less or no track vacancy detection systems) Punctuality increase (due to less or no track vacancy detection systems) Application areas all (regional; conventional passengers/freight; high-speed) Migration Objectives & Scenarios Protect existing (ETCS) on-board investments (any impact on ETCS B3R2 specifications?) Mixed fleet operation possible? (trains with and without Train Integrity Management System)

ETCS L3 – System Concepts and challenges Full Moving Block, without Track Vacancy Detection Full Moving Block, with Track Vacancy Detection Fixed Virtual Blocks, without Track Vacancy Detection Fixed Virtual Blocks, with Track Vacancy Detection Level 3 Hybrid

ETCS L3 – System concepts and challenges Train Fitment All trains need to be ETCS fitted. Train Integrity Monitoring Especially retrofit, especially variable consist freight trains Note: X2Rail-2 contains Work Package on Train Integrity System Recovery How to achieve recovery without Track Vacancy Detection? Includes system initialisation, deactivation of shunting areas Performance Notably release of points where capacity is critical

ETCS L3 – System architecture and main assumptions Architecture as relevant to WP5 Moving Block: Notes: Consistent with ETCS as is Start point is ETCS Baseline 3 Release 2 + CR940 Not sufficient for GoA3/4 – there is a Driver as an external user

Current work is create Scenario Descriptions ETCS L3 – S2R-planning Current work is create Scenario Descriptions Reached about 75% Initial Scenario Descriptions Now working on more detailed analysis via Workshops Scheduled dates for deliverables in 2018 Nov-18: D5.1 Moving Block System Specifications Aug-18: D5.2 Moving Block Operational and Engineering Rules Oct-18: D5.3 Moving Block Preliminary Safety Analysis Beyond 2018 X2Rail-2 started Sep-17. This contains WP covering: Train Integrity Train Location X2Rail-3, scheduled start Sep-18, will contain further work on Moving Block, Deliverables to be defined X2Rail-5 may also contain work on Moving Block

ERA ETCS L3 WG (H2 2017) > define ERA ETCS L3 activities ETCS L3 – ERA activities ERA ETCS L3 WG (H2 2017) > define ERA ETCS L3 activities Quick-win ETCS L3 Hybrid (Fixed Virtual Blocks, with Track Vacancy Detection) Concept developed by EUG with compliance to B3R2 specifications+CR940; Migration: mixed fleet operation is possible (TIMS optional); Concept being demonstrated in the field by Prorail & Network Rail in H2 2017; Limited ERA-activities (OPE TSI > impact ETCS L3 hybrid on Appendix A & ETCS driver’s handbook; CCS TSI > editorial updates, e.g. subset 091); S2R ETCS L3 (Base case: Moving block without Track Vacancy Detection) Q2 2018 : ERA workshops to disseminate S2R results; Target 2022 : CCS TSI update with game changer functionalities;