Sat 17/9 – Sun 18/9 07:00 Cryo problem in point 4 From E. Blanco: First beam dump caused by a cryo PLC not reachable anymore (UX45_QUI) and then 14 minutes.
Advertisements

Will we still see SEEs? (a word trick game) R2E Project Meeting - draft presentation for Chamonix 2012 – 19 th January 2012 M. Calviani (EN/STI) for the.
LHC 15 April :19: UFO event detected by on BLM 15.R8 and beam dump 8:46: P2 cold compressor trip and recovery during morning shift. Access given.
R2E Weekly Report status AT/MB/MC – 4 th R2E Project Meeting – 7 th April 2011.
J. MEKKI (1/14) 05/12/12 – RadWG meeting Summary of the radiation levels of the equipments at CNRAD RF MosFETs Cryogenics TE/EPC LED warning system BPM.
21/05/2012LHC 8:30 meeting Overview Week 20 Injectors, LHCb polarity, Beam-Beam Coordinators: Bernhard Holzer, Jan Uythoven.
LHC 30 th and 31 st July :10 Finish scrubbing fill 25 ns trains by operator dump. –No XPOC data … 08:40 Inject for another scrubbing fill 09:09.
Radiation test - PSI Date Equipment Owner Test groupDUT May 20th EN/STI OSL, TLD BE/BI Detector June 1stTE/EPCEN/STI Mosfet Voltage regulators Voltage.
RADWG 6 TH TH OCTOBER 2012 G. Spiezia (EN/STI/ECE)
Sat 18/6 – Sun 19/6 07:48 Beam dump due to spurious interlock from BIS 08:30 access BIC repair. RF intervention in parallel. 13:00 Intervention on BIC.
TE-MPE-CP, RD, 23-Nov Summary of Radiation Induced QPS Events in LHC 2010 R. Denz TE-MPE-CP.
Premature Dumps in 2011 Acknowledgements: A.Macpherson, G.Papotti, M.Zerlauth M.Albert LHC Beam Operation Workshop December 2011.
Follow-Ups and Notes. Project News LMC R2E (SEE Events) Update (see link)link RadWG SEE list (link) and Post-Mortem Database (link) synchronizedlink MCWG.
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
LHC 8:30 meetingEBH 1  Cryogenics recovery in point 8  Meanwhile a couple of accesses:  MKI investigation on noise in IP2  Insulation Vacuum.
RF observation from Saturday morning Observation of beam induced voltage/power following the two klystron trips: 03:18 3B1 just at end ramp, 1.26E14 p.
Beam Interlock System MPP Internal ReviewB. Puccio17-18 th June 2010.
1 Commissioning and Early Operation – View from Machine Protection Jan Uythoven (AB/BT) Thanks to the members of the MPWG.
LMC Update - R2E Failures December 5 th 2012 (R2E) Mitigation Project: LMC Update December 5 th 2012 R2E SEE Update M. Brugger on behalf.
R2E Availability October 15 th 2014 Experience from Past LHC and Injector Operation and scaling to the future G. Spiezia.
Radiation monitoring: what do we have and what do we need? M. Calviani, M. Brugger, P. Peronnard, J. Saraiva, G. Spiezia (EN/STI) R2E/Availability Workshop.
LHC progress Tuesday 28 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
R2E Mitigation Project Status Report 2 nd R2E Committee Meeting R2E Project Report.
LHC Cryogenics Schneider PLCs: Radiation tests at H4IRRAD Mitigation measures M. Calviani, M. Brugger, G. Spiezia (EN/STI) E. Blanco, J.M. Beckers, D.
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
Proposal to change bunch length during physics fills to assess beam induced heating after LS1 M. Barnes, P. Baudrenghien, A. Burov, S. Claudet, S. Jakobsen,
R2E Mitigation Project Review November 21 st – 24 th 2011 Intense program (link)link A few facts/highlights per session/task Calculations & Monitoring.
TE-MPE-CP, RD, 28-Sep Problems with QPS DAQ Systems During LHC Operation, 1 st Results from 2010 CNRAD Tests R. Denz TE-MPE-CP.
Follow-Ups and Project Structure R2E Meeting September 8th Project / Study Group / RadWG R2E Mitigation Project:  Responsible of development and implementation.
A few slides about ‘Very’ ;-) VERY Quick look on IR7 – RadLevels (Ion versus Proton Run) [good and bad refers to losses in the machine] PLEASE NOTE THREE.
R2E-MD preliminary report – 3rd/4th July th July LSWG meeting
LHC Beam Commissioning Meeting V. Kain & R. Alemany
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
R2E impact of TCL settings: input for 2017 operation
Outline Introduction to LHC Power Converters Remaining Inventory Observed Availability New inventory – FGClite Cumulative & SEE Effects Maintenance.
RADMON Salvatore Danzeca (EN/STI) on behalf of the R2E Project and RADMON team Thanks to all the RADMON Team!
Wednesday September 14th
R2E – Experience and Outlook for LS1
TI8/WIC Incident & UJ87/UA87 Radiation Levels & Analysis
Wednesday 17th August Rocky, short fills, initial luminosities are good LHCb polarity change to negative seems ok 18/08/2011 LHC 8:30 meeting.
LHC Morning Meeting - G. Arduini
Saturday 12:00 Fill 1992 in stable beams.
LHC Morning Meeting - G. Arduini
Technical Stop #4 29th August - 2nd September 2011
Summary of Week 11: 14 – 21 March
Collimator Control (SEUs & R2E Outlook)
Fri 29/7 – Sat 30/7 09:00 End of fill 1990, PC trip RCBXV3.R1 (likely SEU on QPS). Integrated Luminosity: 41 pb-1. Access for MKI2 main switch replacement.
Thu 19/5 06: :00 Investigations from vacuum and cryogenics
Summary of Week 16 G. Arduini, J. Wenninger
Preliminary Analysis and foreseen actions EN-ICE&EN-STI
Friday 11/5 08:00 RF communication problem solved. Ready to inject but beam not available from the injectors. Injection line collimators opened from 4.5.
Finally.... We had to wait a long time.... We had many problems....
Global Post Mortem Event Event Timestamp: 15/06/12 15:54:
RADIATION induced failures in LHC 28th June 2011
Wednesday 10/5 Cryo recovery until 18:30
Sunday/Monday & :30 Stable beams. Fill #1851.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Radiation To Electronics Collimation Areas (IR7/3)
Radiation To Electronics 2x A Brief Look
LHC Morning Meeting - G. Arduini
Scrubbing progress - 08/12/2012
IP8 aperture measurements (07:30-10:30)
Thursday 26th July 13:21 Fill 2880 beam dumped
R2E LMC Update (Weeks 32/33) Post-Mortem database: SEE analysis and link to existing RadWG list in preparation Shielding block delivery crisis solved:
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Wednesday 6th April Injection of 50 ns up to 108 bunches (3 x 36).
Saturday 24 September 2011.
Mon 2/4 08:00-13:00: Access for: Experiments Power converters BBQ
Coordination: Eva Barbara Holzer, Mike Lamont
Mon 8/8 – Tue 9/8 Stable beams #2009
Presentation transcript:

X X X QURA PLC X RM01_R X RM01_L Long-Term?: QURC(A,B) QUI (-1) New BLM + BatMon Monitors (~1mGy/s during high intensity fills) Cumulative radiation levels: few 1E6cm-2 (still fairly low!) QURA PLC X Towards US85: Factor ~5-10 less X RM01_R New BLM + BatMon Monitors X X RM01_L X Long-Term?: QURC(A,B) QUI (-1) CRYO RF (-0.5) New BLM + BatMon Monitor

P4 Radiation Levels ~2-6x105cm-2 at PLC location TS TS TS ~1-3x105cm-2 at PLC location 2nd Failure 1st Failure Vacuum activity higher after TS and with higher intensity -> long-term study important

P4 Radiation Levels Beam-Gas Interactions (levels decrease fast) Up to 1mGy/s Beam-Gas Interactions (levels decrease fast) New installed BLMs have noise, but fills are nicely visible 1mGy/s versus RadMon readings -> analysis ongoing

P4 PLC Considerations Failures occurred during beam-on, in a period when the UX45 RadMons counted Radiation levels still very low at location of the PLC (~a few years of surface equivalent) Failure signature compatible with SEU, 2nd failure observed in same location; radiation test could confirm high sensitivity Additional monitoring was installed during the last TS (many thanks to BLM and RadMon teams!) to evaluate mid/long-term radiation evolution (25ns!) Most exposed equipment is in UX45 and relocation requirements are to be evaluated

Observed Radiation Levels © MCWG (M. Calviani et al.)

Observed Radiation Levels © MCWG (M. Calviani et al.)

Post-Mortem DB & RadWG List Post-Mortem database: RadWG list (link) and PM-DB (link) fully synchronized and mostly iterated with equipment owners Many Thanks to: Rafal, Markus Z., Reiner, Marco, Julien, Giovanni !!!

SEE ‘Events’ Since last TS QPS [5/1+1/14] nQPS mFIP DQQDI and DDQDG Cryo [2/2+2/3] Temperature Sensor Probem (mitigation currently tested) PLC US45 (radiation levels are low, but 2nd case) Valves + Control (rather electrical problem) Power-Converter [2] Auxiliary power-supply (600A) – didn’t dump the beam? Collimation [1] collimation control affecting TCTVA position (stuck bit?) Vacuum [1/0] PLC problem in UA27 (unlikely, but to be checked) [Dump/App. +???/Mitig.]

QPS Failure Rate Evolution © R. Denz et al. ISO150 patch solution applied in critical locations

Cryogenics: Failure Rate Evolution © S. Claudet et al. Cryogenics patch solution for DFB logic in place (P1, P5 and P7), works perfectly! Fix for temperature sensors of current leads: currently tested in P5 [TT893 only]

SEE Failure Rate Evolution Cryogenics patch solution for DFB logic in place (P1, P5 and P7), works perfectly! Temperature sensors for current leads: currently tested in P5 [top of lead only] (S. Claudet) PIC PLC relocation performed in P1 (M. Zerlauth)

SEE Failure Rate Evolution ??? ISO150 Patch Slope: ~1SEE_dump per 60pb-1 Only 100% SEE Cases (e.g., not PIC, not PLCs,…) Cryogenics patch solution for DFB logic in place (P1, P5 and P7), works perfectly! Temperature sensors for current leads: currently tested in P5 [top of lead only] (S. Claudet) PIC PLC relocation performed in P1 (M. Zerlauth)