Introduction of the Decontamination Method Which Uses Blasting

Slides:



Advertisements
Similar presentations
Carburetion Systems Small Engines.
Advertisements

Heating, Ventilation, and Air-Conditioning (HVAC) Systems
All Rights Reserved, Copyright (C), MITSUBISHI HEAVY INDUSTRIES,LTD. NO.1 Application of cavitation jet technique to operating nuclear power plant September,12.
CHAPTER 5: Mass and Energy Analysis of Control Volumes
HVAC: heating, ventilating, and air conditioning this is a thermostat: it sends signals to the heating/cooling system.
Propulsion Train & Shaft Line Components
Pulping and Bleaching PSE 476 Lecture #5 Continuous Reactors Lecture #5 Continuous Reactors.
 Latent heat  Sensible heat  Total heat  Specific heat.
PUMPS AND GAS-MOVING EQUIPMENT
PEUGEOT 206 INSTALLATION 99’— 05’ TU5JP4
KICK-OFF MEETING - Brindisi 21 July 2011 EcoPlasBrick WP2 Industrialization activities Development of an automated production system Start-up of a new.
POWER PLANT.
STEAM CONDENSERS.
STEAM HEATING.
Introduction of the Decontamination Method Which Uses Blasting ISOE/ATC 2006/10/12 ALARA SYMPOSIUM Oct./12/2006 IN YUZAWA JAPAN.
Water piping design.
Air Conditioning in tropical climates Presented by Ranjeet Kumar Nayak.
INTRODUCTION Definition:
TEAM 12: Low-Cost, Portable, Off-Grid Biodiesel Production Plant Team Members: James Black Sam Dresser Joey Kilmer Matt Mills Faculty Advisor: Dr. Dave.
Radiation Safety Management KHNP Lee Eung-Il HANUL Unit4 Steam Generator Replacement.
Principles of Carburetion
Heating Systems.
 Spray drying - formation of droplets from the bulk liquid – moisture removal  liquid droplets - sprayed –drying chamber  the low-humidity hot gas.
Parul Institute of Engineering & Technology Subject Code : Name Of Subject :Fluid Power Engineering Topic :Rotodynamic Pumps.
adiation safety management practices in 19th preventative maintenance of Kori unit 4 and future plans.
Introduction to Energy Management
The Improvement of ALARA for the Steam Generator Maintenance Radiation Safety Department The 3 rd Plant, Ulchin Nuclear Power Site.
Submitted by Pradeep pataskar Roll no.11031M02034.
Principles of Carburetion. Carburetors function The carburetor works on Bernoulli's principle: the faster air moves, the lower its static pressure, and.
Unit 2, Genkai Nuclear Power Plant
Refrigeration Systems
The C.I. Engines Fuel System  The C.I. engine demands that the fuel supplied is –  Timed to inject when the piston is near the end of the compression.
FLUID FLOW FOR CHEMICAL ENGINEERING
Fluid Mechanics for Chemical Engineers Arif Hussain (Lecturer)
Air condition installation
ARÇELİK TİCARİ KLİMA EĞİTİM DÖKÜMANI APPENDIX.
James McIntyre VRF Training Manager V5 Key Components.
PUMPS Thermal Systems Laboratory Samuel A. Santiago Pérez Modesto González David Alvarado.
Sorbent Handling Plant by NHI-Design & Equipment Specifications
CENTIFUGAL PUMP OPERATION
Lesson 7 Steam Power Plant.
Chapter No-5 STEAM CONDENSERS AND COOLING TOWERS Marks-16
Types of material handling equipment
Unit 13 Oil-Burning Equipment
Engine Lubrication Systems
RECIPROCATING MACHINES
Unit 37: Fluid containment Dr
Objectives Develop the conservation of mass principle.
Chapter: 06 MASS AND ENERGY ANALYSIS OF CONTROL VOLUMES.
ABRASIVE WATER JET MACHNINING
BASICS OF MECHANICAL ENGINEERING
R1 Fundamentals of Refrigeration
Radiation Safety Management
Heating Ventilating and Air Conditioning
Essentials of Fire Fighting
Cooling technology Main components and equipments
WHAT IS HX……??? Heat exchangers are equipment that transfer
Applied Thermal Engineering
Unit 37: Fluid containment Dr
R1 Fundamentals of Refrigeration
Introduction of fuel feed system
Power Plant Engineering. Boilers Boilers Boiler is an apparatus to produce steam. Thermal energy released by combustion of fuel is used to make steam.
STEAM CONDENSERS AND COOLING TOWERS Marks-16
By: JAGDEEP SANGWAN Refrigeration Basics 101.
What is a Turbine ? A Turbine is a device which converts the heat energy of steam into the kinetic energy & then to rotational energy. The Motive Power.
The Improvement of ALARA for the Steam Generator Maintenance
2019/7/9 Application of cavitation jet technique to operating nuclear power plant MITSUBISHI HEAVY INDUSTRIES, LTD.  Hironori Onitsuka KORYO ENGINEERING.
Cooling System In I.C.E.
Presentation transcript:

Introduction of the Decontamination Method Which Uses Blasting ISOE/ATC 2006/10/12 ALARA SYMPOSIUM Introduction of the Decontamination Method Which Uses Blasting Oct./12/2006 IN YUZAWA JAPAN  

Contents 1. Outline Decontamination 2. History of Mitsubishi decontamination technologies 3. Decontamination using blasting 4. Cavitations jet (CJ) decontamination 5. CJ + blast decontamination 6. Revolving flow polishing method 7. Summary

1. Outline Decontamination The purpose of decontamination Cost Configuration of an object (structure, physical amount) function of subject Schedule (Time required) Loss in quantity of radioactive waste The amount of secondary wastes Exposed reduction of a worker Area space DF Determination of the decontaminating method 1

2. History of Mitsubishi decontamination technologies

3. Decontamination using blasting facility which lifts Accumulator Drier The control panel of a whole system Compressor Cooler Blaster Drier Air pressure power control panel Filter Drum Drum with radiation shield Outdoors Blower Blast tank Blast equipment (primary cyclones separator ) Hose balancer Hose balancer Hose balancer 2次サイクロンセパレータ Bag filter dust sampler ブラスト材収 Supply of air (Vacuumed pressure) Recovery blower R/V platform for shields Decontamination equipment R/V outlet shield plug Vacume blast gun R/V outlet nozzle neck Blaster (Blast circulation system) 3

3. Decontamination using blasting Functional examination situation Pipe(nozzle neck mockup) AIR Cylinder for forcing nozzle  研削した跡 Guide roller Nozzle ( Vacuumed blast gun) 4

3. Decontamination using blasting main specifications 1. Decontamination equipment (1) Decontamination system:Dryness type vacuumed blast (3) Guide system :Trapezoid screw sending type nozzle rotation (4)Weight:About600kgf/set 2.Utilities (1)Used power supply:AC200V (2) Used air supply:Station service air 0.6MPa 5

3. Decontamination using blasting Features of various blasting materials alumina Aℓ2O3 Glass SO2 Boric Iron SUS Particle Cut Wire DF large small middle Remaining effects Cost Damage 6

3. Decontamination using blasting Particle diameter of the blast materials :  Usual φ0.1~2mm Blast pressure : Usual l5~6kg/cm2 Blast Angle : Usual 45°≦ The configuration before and after activity of blast material (stainless steel grid) Case of projection factory test to steel materials Before(×200) After 1-time use( × 200) 7

3. Decontamination using blasting The check of the soundness of target material When the amount of grinding is large  ⇒ Reduction in thickness  Loss of a resisting pressure function     8.1~8.7μm/2times,13.3~15.1μm/3 times When the amount of grinding is locally large  ⇒ SCC,Fatigue occurs    Influence on the plant by remaining (Remainder of recovery, Remainder of Pierced)    They are 10cc remains at the blast of about 300ℓ  8

4. Cavitations jet (CJ) decontamination It compares with high-pressure water washing in mind, and is a high physical impulsive force efficiently   ⇒ Compact equipment With no pollution expansion of dust generating etc. into air because of underwater washing With no influence which it has on lining in washing time of a decontamination level Fundamentally, with no secondary waste by decontamination Contraction Cavitation bubbles Liquid 9

4. Cavitations jet (CJ) decontamination Track record ① Spent fuel pit surface of wall and fuel rack cell inside Object Purpose Before After DF Note Pit surface Pollution removal 22000 cpm 700~1200 cpm 18~30 CJ+ washing fuel rack cell inside Dose rate reduction 5.9 mSv/h 0.9 mSv/h 6.6 Underwater Measureme-nt data Track record② The part which has clad adhesion by contact to the fuel for a fuel extraction facility DF 2.1~13.5(総平均8.8) 10

4. Cavitations jet (CJ) decontamination The application example to fuel extraction equipment Before (Those with blackish brown clad) After (With no adhesion remains of clad) 11

4. Cavitations jet (CJ) decontamination Enforcement example:  Fuel transfer pit      Outline specification High-pressure pump:16MPa-18L/min   (Hand-pushed conveyance type) Nozzle:10MPa-4.4 L/min Required utility:The power supply for pumps  220V-23A,Water for washing about4m3 High-pressure pump Pure water for work Operation floor Cavity C/V A/B About 6m Lifting frame Nearly drain Floor surface washing Transfer pipe Track frame 2m Drain part washing 長靴 Nozzle 12

5. CJ + blast decontamination [Finishing patent application] The polish grain mixed in the cj grinding-removes adhered clad The decontamination effect higher than what added the decontamination effect of CJ and a blast simply ◎Influence examination to in service equipment and apparatus ・In a system application test, it affection-evaluates with a mock-up The faculty of a facility is not affected even if it executes for 30 minutes ◎The faculty of a facility is not affected even if it executes 13

5. CJ + blast decontamination P PI High-pressure pump feed line crane High-pressure pump 22MPa,15 ℓ /min Nozzle feed device To air filter Filter housing Air purge line Surplus water return line control panel Water recovery line Water drain line フィルター Container Circulation pump Mono flex pump ( ) Manometer Blast grain suction nozzle strainer CJ + stream Blast grain SG insert plate When collecting Blast grains Turn table return line Frame To floor drain 14

5. CJ + blast decontamination Applicability test with actual machine Object : SG insert plate After Before 15

5. CJ + blast decontamination The decontamination result in a system application test Notes : ( ) inside value is the dose rate to extracted Object Before After Decontamination time D.F. B-SG HOT 40mSv/h (14.97mSv/h) 0.7mSv/h (0.09mSv/h) 60 min. 166 D-SG COLD 25mSv/h (9.96mSv/h) 0.63mSv/h 90 min. 111 16

6. Revolving flow polishing method [Finishing patent application]  〈Aim〉   Inside contamination of long piping which has a crookedness part is decontaminated   A revolution style is given to a flow Blast grain Blast grain In the conventional blasting, it checks that the piping crookedness part round which an Blast grain does not spread can also be decontaminated efficiently. 17

6. Revolving flow polishing method The outline of the gas revolution flow grinding method Principle of generating revolving flow Distances the revolving flow can reach Q1: Air to be used for revolving flow Q2: Air to be used for suppressing revolving flow Q3: Air to be used with abrasive Speed of abrasion  δ (μ m/min) μ δ Abrasive Fluidics Insertion type Revolving flow type Distance from nozzle outlet L (m) Insert the sliding nozzle from tube end and make it move. Butt tube ends Tube to be decontaminationed Tube to be decontaminationed Characteristic between speed of abrasion and distance (Long tube) Range of decontamination is small Sliding nozzle Range of decontamination is small Fixed nozzle 18

6. Revolving flow polishing method Element examination Speed of abrasion  Speed of abrasion  Average speed in piping Flux ratio Relation between grinding speed and the average flow velocity in piping Relation between grinding speed and a flux ratio Since the flux which induces revolution speed is Q1, if a flux ratio becomes large, degree centrifugal force will become weaker and grinding speed will become small. If the average speed in piping is made quick, grinding speed will increase 19

6. Revolving flow polishing method System application examination Heart exchanger tube ① Supply air former Pressure: 0.5MPa ② amount of grinding airstreams a.For revolution style generating(Q1):1200NL/min b.For revolution style control(Q2):400 NL/min c.For grinding material supply(Q3):180NL/min ③ Blast material: 200μm Alumina grain ④ Decontamination time : 40分 SG Suction plug 管 板 *A *D *B *C Seal plug Seal plug *F *G Steam generator Channel head A:For blast material supply B:For revolution style generating C:For revolution style control D:For hopper pressurization E:For vibration F:For discharge part seals G:For inhalation part seals Oil pressure pump Oil pressure pump *E Preliminary recovery line Hopper Recovery line Supply line Fluidics Vacuum cleaner Discharge side (Hot side) Inhalation side (Cold side) Separator Steam generator heat-exchangers tube inside decontamination equipment System composition figure 20

7. Summary The needs for decontamination 【Former is also from now on】 Reduction of the amount of secondary generation wastes Improvement in the speed of decontamination speed Cost reduction Radiation exposure reduction The spirit of ALARA has been, and will be respected in our efforts forever. 21