PS operational beams 15 September 2017

Slides:



Advertisements
Similar presentations
Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
Advertisements

Accelerator Schedules LHC and LHC Injectors Schedules MSWG meeting 16 January 2015 SPSC - 13 January 2015 Rende Steerenberg, BE/OP2 Rende Steerenberg,
Thomas Roser Muon collaboration meeting February 8-10, 2002 AGS beam intensity upgrades What has been achieved Sextupole power supply upgrades Bunch manipulation.
MD status. 50 ns double batch, preliminary results Intensity: extraction Transverse parameters at PS extraction, end of last week LHC50_DB Eh.
Bunch Flattening with RF Phase Modulation T. Argyropoulos, C. Bhat, A. Burov, J. F. Esteban Müller, S. Jakobsen, G. Papotti, T. Pieloni, T. Mastoridis,
MG - MTE Workshop 24/09/20101 Measurements’ analysis S. Gilardoni, M. Giovannozzi, M. Newman Introduction Techniques, tools Results (selected) Outlook.
LHC beams in the SPS in 2014 H. Bartosik, G. Rumolo, G. Iadarola With the help from K. Kornelis, V. Kain and SPS OP crew.
H. Bartosik, K. Cornelis, A. Guerrero, B. Mikulek, G. Rumolo, Y. Papaphilippou, B. Salvant, E. Shaposhnikova June 16 th, 2011.
PSB DSP Based Low Level RF Operational Experience. April 2015 M.E. Angoletta, A. Blas, A. Butterworth, A. Findlay, S. Hancock, M. Jaussi, J.Molendijk,
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
The East Area Rende Steerenberg, ps/op PS-Days 2001 Evian.
MICE Run Plan Sept/Oct 2009 m. apollonio – IC MACHINE PHYSICS USERs RUN NO SHIFT A B C D E.
MTE vs CT D.Manglunki for BE/OP - pictures from M.Giovannozzi - details in “Fifty years of the CERN Proton Synchrotron (Vol I)” CERN
NA61 11 October 2010Light Ion for NA61/ S. Maury1 Light Ion in SPS Foreseen to have primary Ar beam physics in 2012 Nothing runs in 2012 NA61 duty cycle.
BWS PS and SPS problem report J. Emery
Beam position instabilities in the PSB injection line J. Tan, M. Bozzolan, L. Søby, B. Mikulec, G.P. Di Giovanni, O. E. Berrig, E. Benedetto BI Technical.
Content  The LHC beams produced  LINAC2 & PSB  The PS  The SPS  Super Cycles and N0n-LHC physics  Conclusions IEFC Workshop, 8 March 2012 Rende.
News on TMCI in the SPS: Injecting high intensity bunches Benoit for the MD team: T. Bohl, K. Cornelis, H. Damerau, W. Hofle, E. Metral, G. Rumolo, B.
LHC Injection Sequencing MD 16/23/2009 Injection sequencing / BCM R, Giachino, B. Goddard, (D. Jacquet), V. Kain, M. Meddahi, J. Wenninger.
PSB semgrid - wire scanners measurements Emittance working group meeting 13/10/2015 Emiliano Piselli BE-BI-BL.
LHC Injectors Upgrade Project 1/12/2010 R. Garoby.
MG - APC meeting 29/02/20081 MTE commissioning strategy and requirements M. Giovannozzi What is needed to implement MTE ScheduleCommissioning Acknowledgements:
E. Benedetto, 24/04/14, LIU-PSB Meeting, MDs planning for 2014 MDs planning for 2014 E. Benedetto Thanks: G. Rumolo, B. Mikulec and the RF, OP, ABP, BI.
INJECTORS BLM SYSTEM: PROGRESS REPORT Christos Zamantzas on behalf of the BLM team. MSWG 28/08/2015.
Beam loss and radiation in the SPS for higher intensities and injection energy G. Arduini 20 th November 2007 Acknowledgments: E. Shaposhnikova and all.
MTE commissioning status S. Gilardoni, BE/ABP With C. Hernalsteens and M. Giovannozzi.
SPS availability K. Cornelis Acknowledgments : A. Rey and J. Fleuret.
Statistics 2015 Fixed Target CT/MTE and LHC BRIGHTNESS Eric Veyrunes, Johan Dalla-Costa, Diego Perez.
LHC Injectors Upgrade Project 11/11/2010 R. Garoby.
Summaries and conclusions of the MTE Workshop
LIU-PS Beam Dynamics Working Group Introduction and objectives
Update on BISW EYETS activities
PS status 10 August – 17 August 2017
LIU Wire Scanner Milestones June 2017
Automatic emittance measurement in the CERN 1.4 GeV Booster
Brief introduction to the Injector MD days
Space charge studies at the SPS
MD #453 Effect of low frequency noise
Injection BIS – next iteration
BE-BI Software for LINAC4
High Radiation to Materials 16th Project Team Meeting – May 20, 2010
PS wire scanner failures
LIU, ABP-CWG, PBC, miscellaneous
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
MD Studies for LIU PS Injection
Michael Benedikt AB/OP
The Proton Beam for the neutron Time Of Flight facility
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
MTE latest measurements
D. Manglunki with input from C. Carli, K. Cornelis, T. Dobers, I
Yesterday Issue of injection kicker not pulsing:
Beam requirements and operational scenarios in 2010
Dry Run 0 Week 13: BI test of...everything circulating beam: all fixed displays and BI applications OP directories for 2009, concentrators running Need.
Lost at 12:05 to power converter (RTQX2.R1) problem
Wire almost entirely through beam before BLM triggers dump
Yesterday’s morning’s controls issues
Introduction to LHC beam production in PSB and PS
Friday 16/3 08:30 – 10:15 Access for QPS and EPC (BI in point 4)
Present and Future test facilities for High-intensity Targetry CERN
MSWG Report – SPS OP Crew
News on TMCI in the SPS: Injecting high intensity bunches
Generation of Higher Brightness Beams for LHC
How to control the local beam density
Preliminary analysis of PS septum 31 failure August 8th, 2008
First meeting of the LIS section: Welcome to the new members!!
ABP/RTL Main RTL Activities for 2007/8:-
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Tuesday End of fill 1393 Movement of suspicious Roman pots OK
Monday 152 bunch operation summary
Presentation transcript:

PS operational beams 15 September 2017 fixed target beams status comments EAST 1,2 OK in specs high intensity delivered for one user during 2 weeks Low intensity version set up and used by IRRAD MTE* up to 2100E10 ppp in the PS with correct emittances Higher in the PSB but emittances being worked on TOF ** AD suffered from prbs. With PFW power supply, now fixed *) new PU after DFA can measure single islands available **) On request from TOF the beam position in TT2 is logged in Timber and an application has been made available which compiles important information for TOF Screenshots have been taken by the OP crew during every shift Improved diagnostics in the FTN line is under discussion (OP, BI, STI) MSWG 15/09/2017 KH

PS operational beams 15 September 2017 LHC type beams status Comments LHC 25ns OK (LHC 50ns) used? LHCPROBE LHCINDIV suffered yesterday LHCINDIV_VDM BCMS 25ns LHC25ns8b4e 2 versions (nominal and hi) wealth of dedicated beams for LHC MD set up and delivered wire scanners get occasionally blocked MSWG 15/09/2017 KH