CIS Regions GE TRS Compliance Summary

Slides:



Advertisements
Similar presentations
AS9102 First Article Inspection Report
Advertisements

Job Performance Requirement 7-13 Servicing an SCBA Cylinder Using a Cascade System.
Lock Out/Tag Out Training Lock-Out/Tag-Out OSHA Definition. Lockout/Tagout (LOTO) refers to specific practices and procedures to safeguard employees.
PPAP Requirements Training
First Article Inspection Report
CE Regulation Service PROLAB Tech Rev 1 Machinery Directive Flow Chart A brief guide.
Guardian Tier 2 PPAP Guidelines
3 rd SG13 Regional Workshop for Africa on “ITU-T Standardization Challenges for Developing Countries Working for a Connected Africa” (Livingstone, Zambia,
Pressure Measurement By Manometer
Moscow, 2013 Dr. Elena Stroganova Director of Test Laboratory of Telecommunication and Broadcasting Equipment.
First Article Inspection
SELECT Scheme Provider Certification of Construction (Electrical Installations to BS 7671)
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden CRE Policy, Labelling 2006/06/22 - Toulouse ANTD SFP Page 1 Design,
Materials Bratislava 11/12/13 April 2005 Presented by Peter Hanmore For the benefit of business and people TAIEX Workshop on the Pressure Equipment Directive.
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Prof R T KennedyEMC & COMPLIANCE ENGINEERING 1 EET 422 EMC & COMPLIANCE ENGINEERING.
Jon KleinISEProject Manager Nguyen VuMETechnical Lead Kyle MengesMETechnical Lead Christine LowryMEDesign Engineer Chris SteinMEDesign Engineer Priya NarasimhanEEElectrical.
Release Detection for Piping Spring Types of Piping Safe Suction “Unsafe” Suction Pressurized.
Level 2 Unit 4 Producing Engineering Solutions Engineering Diploma Level 2 Unit 4 Producing Engineering Solutions An Approach to Unit Delivery and Assessment.
What Documentation Needs to be Submitted With an Approval Application?
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Approvals and Permits Division Isreal Mallard Transportation Specialist,
Making every vote count. United States Election Assistance Commission EAC Voting System Certification TGDC Meeting December 9-10, 2009.
PRESENTATION OUTLINE Enhancements on SRM Registration of Supplier (ROS)/ Supplier Self Service (SUS) Go-live 16 th December, 2013.
MICE hydrogen review Approval process. Process Working group Document pack PPD Director & ISIS Director Prerequisite testing Completed action list Approval.
HPU FILTERS LOW PRESSURE FILTER FROM APU UNIT. CLOSE APU HYDRAULIC FLUID VALVE. FILL FILTER WITH HYDRAULIC FLUID PRIO TO INSTALLATION. LUBRICATE GASKET.
Biosolids Annual Report A Step by Step Guide to Submittal.
1 HIGH ENERGY ACCELERATOR RESEARCH ORGANIZATION KEKB Review Committee/ NAKAI Hirotaka KEK Crab Cavity - Cryogenics - KEKB Crab Cavity Group - presented.
The Road to New Plant Approvals Graeme Claridge. New Plant Approvals How do we get to this stage.
CONFIRMING ORDERS Purchasing and Accounts Payable Department 2015.
NCSX Water Systems Larry Dudek March 21, Plan for FY03 Review questionable legacy equipment and verify viability for NCSX New Scope: NB support.
06/02/20161 Benny Hoff TÜV NORD Sweden AB AFS 2005:2 Installations.
3017 North Stiles, Suite 100 Oklahoma City, OK Toll-Free
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience Product Lifecycle Management.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 LAT QA has hired a full-time on-site representative (Donald Knaepple)
Prof R T KennedyEMC & COMPLIANCE ENGINEERING 1 EET 422 EMC & COMPLIANCE ENGINEERING.
Fieldbus Foundation General Assembly 2008 Project Planning and Execution Mike Downey Jacobs Engineering.
Technical Translation Agency INTERCOMSERVICE …finding a common language LLC «INTERCOMSERVICE» Holosiivska str. 7, office 150 Kyiv, Ukraine.
1.  Career description: construct and repair structures and fixtures of various woods prepare cutting lines on materials with a ruler, pencil, chalk.
SCG-SH-0200 Southern Company Generation Clearance Procedure Awareness Training for Contractors and Nonlisted Personnel.
North & South America Regions GE TRS Compliance Summary
Generic GE TRS Compliance Summary
Lock Out & Tag Out.
Technical Scope of Work
TCP LIMS – Animal Use Protocol Management
Part 2 Technician’s Guide & Workbook for Duct Diagnostics and Repair
ISUAL Product Assurance
Teleconference ACS – FREIA 10th May 2017
USAJOBS – Application Manager
EET 422 EMC & COMPLIANCE ENGINEERING
RazorBuy Sole Source Form
Subsea 100 Global Services Products Presentation
Documentation status in WP 5 Goal: To collect all documentation/know-how needed in a structured way for the ESS installation, commissioning, operation,
First Article Inspection
QPS EVALUATION SERVICES INC.
Technical Scope of Work
KAMAN AEROSPACE GROUP L. Chodasiewicz - Supplier Quality Assurance.
For the benefit of business and people
Buy A&M Receiving Training
Community Rehabilitation Providers
Reliance Supplier Corrective Action Process
First Article Inspection
ESS approach and support for Declaration of Conformity (CE-marking) Fredrik Håkansson 9th SRF ESS
National English Spelling Competition (NESC-GE)
Installation Binder / IRR – an example
Workshop commissioning Installation Coordination at ESS
ESS approach and support for Declaration of Conformity (CE-marking) Fredrik Håkansson 9th SRF ESS
Workshop on the Pressure Equipment Directive, Riga,
ESS approach and support for Declaration of Conformity (CE-marking) Fredrik Håkansson ESS Accelerator Collaboration Board Meeting Trieste
CICA Project of the Year Entry Template
Presentation transcript:

CIS Regions GE TRS Compliance Summary Summaries Required for all TRS Documents Submitted to GE

Vendor & Purchase Information 1. Vendor/Supplier Information 2. Product Information 3. Project Information – comes from drawing and/or specification 4. Provided by the vendor/supplier/ manufacturer

Support Documentation Steps If drawing or specifications require the documents to be submitted to GE, fill in with a “Yes”, if not “No” If drawing or specifications require the documents to be translated, fill in with a “Yes”, if not “No” Verify the documents are attached with submittal to GE Note: Technical passports required for all CUTR & Metrology Certs (in Russian & English)

Pressure Equipment Steps Does your equipment include pressure equipment (valve, pressure vessels, pipping, tubing, boilers, etc)? If No, Check “No” & skip to next section (Electrical Equipment) If Yes, Check “Yes” & Fill out product information

Electrical Equipment Steps 1. Does your equipment include electrical equipment (controls, measurement devices, etc.)? If No, Check “No” & skip to next section (Measurement Devices) If Yes, Check “Yes” & move to the next question Identify drawing or specification “Zone” equipment will be installed in. If Zone 0, 1, 2 complete Hazardous Location certification information Complete other electrical certification information (LV, EMC, etc.)

Measurement Devices Steps Does your equipment include measurement Devices (gauges, Thermocouples, sensors, etc)? If No, Check “No” & skip to next section (Machinery DoC/DoI) If Yes, Check “Yes” & Fill out product information

Machinery DoC/DoI Steps Does your equipment require a top level CUTR 010 ? If No, Check “No” & skip to next section (Additional Certification) If Yes, Check “Yes” & Fill out product information

Additional Certifications Steps Does your equipment require any additional certifications? If No, Check “No” & skip to next section (Declaration) If Yes, Check “Yes” & Fill out product information

Submit Documentation to GE Declaration Sign the declaration Submit Documentation to GE Collect &”package all the documentation identified in the TRS Summary Submit TRS Summary & identified documents to GE Sourcing via approved tools (SDX, documentum, etc.)