Vibration Isolation Group R. Takahashi (ICRR)Chief T. Uchiyama (ICRR)Payload design H. Ishizaki (NAOJ)Prototype test R. DeSalvo (Caltech)SAS design A.
Advertisements

Seismic attenuation chains concept, design and advancement status Riccardo DeSalvo for the KAGRA Seismic group JGW-G September 10, 20121JGW-G
BS and Mirrors for the LCGT Norikatsu Mio, PSC Univ. of Tokyo Eiichi Hirose, ICRR Univ. of Tokyo December 13, 2011 CSIRO, Lindfield Australia.
KAGRA Vacuum System Items of vacuum sub-group 1 1. Overview VAC (YS) Required Pressure “uhv (ultra-high-vacuum)” in the order of Pa, or lower.
SEO report _SAITO 1. Overall schedule of iKAGRA installation/commissioning change to Michelson Interferometer 2. Scheduling of daily works for installation.
Cryo-payload Kazuhiro Yamamoto Institute for Cosmic Ray Research
Prototype Test of Vibration Isolation System Current Status & Schedule
Takanori Sekiguchi Anual Meeting of Physics Society of Japan Sep. 22nd, 2013) Prototype Test of Vibration Isolation System Current Status & Schedule 1.
Takanori Sekiguchi ALPS Report, Dec. 26th, 2013 Prototype Test of Type-B 1 Takanori Sekiguchi KAGRA F2F MEETING Feb
Summary of Suspension Configurations Yuta Michimura Department of Physics, University of Tokyo March 18, 2015.
VIRGO_LCGT Meeting Laser & Mirror 5 November, 2010 Norikatsu Mio.
Ryutaro Takahashi (National Astronomical Observatory of Japan) Vibrtion isolation system for KAGRA The 6th Korea-Japan workshop on KAGRA NAOJ, June,
Takanori Sekiguchi External Review Control and tuning of suspension 1 T. Sekiguchi KAGRA 4th External Review.
LIGO-G D LIGO II1 AUX OPTICS SUPPORT Michael Smith, 6/11/03 STRAY LIGHT CONTROL ACTIVE OPTICS COMPENSATION OUTPUT MODE CLEANER PO MIRROR AND PO.
Optical Levers Layout and Cabling Yuta Michimura, Yuya Kuwahara Ando Group Department of Physics, University of Tokyo November 19, 2015.
Installation Plan of VIS Ryutaro Takahashi (NAOJ) for the 4th external review on 30 June.
Low frequency anti-vibration system of LCGT Vibration Isolation Group R. Takahashi (ICRR), K. Yamamoto (ICRR), T. Uchiyama (ICRR), T. Sekiguchi (ICRR),
Vibration Isolation Subsystem KAGRA face to face meeting (31 July, 2012) R. Takahashi (ICRR), K. Yamamoto (ICRR), T. Uchiyama (ICRR), T. Sekiguchi (ICRR),
Monica VarvellaIEEE - GW Workshop Roma, October 21, M.Varvella Virgo LAL Orsay / LIGO CalTech Time-domain model for AdvLIGO Interferometer Gravitational.
1 Kazuhiro Yamamoto Institute for Cosmic Ray Research The University of Tokyo KAGRA external review (Cryogenic payload) 18 April 2012.
1 Kazuhiro Yamamoto Institute for Cosmic Ray Research The university of Tokyo LCGT internal review (Cryogenic payload) 30 January 2012.
IKAGRA 初期アラインメント手順 Initial Alignment Procedure for iKAGRA Yuta Michimura Department of Physics, University of Tokyo July 5, 2016JGW-T
Local control sensors for iKAGRA payloads and perspective (Optical lever) Kazuhiro Agatsuma 2013/Dec./5 ELiTES meeting at Tokyo1.
LIGO- G R Amaldi7 July 14 th, 2007 R. Ward, Caltech 1 Prototyping for eLIGO: Power Recycled Fabry Perot Michelson DARM RF ITMy ITMx BS PRM SRM.
Main Interferometer Subsystem
Mechanical loss measurement for KAGRA sapphire suspension system Takafumi Ushiba Department of Physics, The University of Tokyo The first international.
Type-A SAS Local Control Simulation (Current Status)
Vibration Isolation Group
Main Interferometer Subsystem
Main Interferometer Subsystem
Type B Installation Plan
Kazuhiro Yamamoto on behalf of KAGRA collaboration
KAGRA用防振装置の開発 VIII Configuration Sensors and Actuators
Yuta Michimura Department of Physics, University of Tokyo
LCGT Seismic Attenuation System LCGT-SAS
Yoichi Aso on behalf of the LCGT ISC Group
Control of the KAGRA Cryogenic Vibration Isolation System
External forces from heat links in cryogenic suspensions
Summary of the iKAGRA Run
Interferometer Design for bKAGRA Phase 1 and Beyond
iKAGRA初期アラインメント手順 Initial Alignment Procedure for iKAGRA
Type B Installation Plan
Institute for Cosmic Ray Research The University of Tokyo
Mark Barton f2f Meeting 2/22/16
Interferometer Design for bKAGRA Phase 1 and Beyond
Mark Barton f2f Meeting 2/22/16
Summary of iKAGRA Test Run Mar 25-31, 2016
Summary of iKAGRA Test Run Mar 25-31, 2016
Interferometer Design for bKAGRA Phase 1 and Beyond
Interferometer Design for bKAGRA Phase 1 and Beyond
Interferometer Design for bKAGRA Phase 1 and Beyond
Commissioning Procedure for bKAGRA Phase 1 ( )
iKAGRA初期アラインメント手順 Initial Alignment Procedure for iKAGRA
Commissioning Procedure for bKAGRA Phase 1 ( )
Summary of the iKAGRA Run
Commissioning Procedure for bKAGRA Phase 1
Commissioning Procedure for bKAGRA Phase 1
Commissioning Procedure for bKAGRA Phase 1 ( )
iKAGRA初期アラインメント手順 Initial Alignment Procedure for iKAGRA
Yuta Michimura Department of Physics, University of Tokyo
Status of KAGRA Yuta Michimura on behalf of the KAGRA Collaboration
Commissioning Procedure for bKAGRA Phase 1
Status of KAGRA Yuta Michimura on behalf of the KAGRA Collaboration
Commissioning Procedure for bKAGRA Phase 1
Interferometer Design for bKAGRA Phase 1 and Beyond
Beam Propagation for bKAGRA Phase 1 with flat ETMs
Development of vibration isolation systems for LCGT VII
iKAGRA初期アラインメント手順 Initial Alignment Procedure for iKAGRA
Interferometer Design for bKAGRA Phase 1
Yuta Michimura Department of Physics, University of Tokyo
Presentation transcript:

Vibration Isolation Systems bKAGRA Vibration Isolation Systems 2016/6/21@PAB Y. Aso (NAOJ)

VIS Overview

KAGRA Vibration Isolation Systems BRT KAGRA Vibration Isolation Systems ETMY Mode Cleaner ITMY PRM PR2 IMMT ITMX ETMX BRT IFI BS PR3 SR2 Type-A (cryogenic) Type-B SR3 SRM Type-Bp OFI Type-C OMMT Others OMC OST

Suspensions need to be installed from Now BRT IMMT BRT ETMY ITMY PRM PR2 IMMT ITMX ETMX BRT IFI BS PR3 SR2 Type-A (cryogenic) Type-B SR3 SRM Type-Bp OFI Type-C OMMT Others OMC OST

Three types of large suspensions Type-Bp Type-B Type-A

Other vibration isolation systems MC (TAMA suspensions, installed) IMMT (TAMA suspensions) Output optics OFI (modified TAMA suspension ?) OMMT (newly built TAMA like suspension) OST (newly built TAMA like suspension) OMC (custom made one) BRT Custom made one

Who is responsible for what ? Large suspension systems + IMMT (Type-A w/o cryo payload, Type-B, Type-Bp, Type-C) → VIS subsystem (NAOJ) Cryogenic Payload → CRY (KEK) Beam Reducing Telescope Suspensions → AOS (NAOJ) Output Optics Suspensions (OFI, OMMT, OST, OMC + IFI?) → IOO ?

What happened in iKAGRA ?

iKAGRA VIS: Original Plan ETMY Mode Cleaner PR2 IMMT ETMX IFI BS PR3 Type-B Type-Bp' Type-C Fixed to the ground

iKAGRA VIS: What happened ETMY Mode Cleaner PR2 IMMT ETMX IFI BS PR3 Type-Bp' Type-C CLIO Suspension Fixed to the ground

VIS installation took much longer than expected PR3 was the only large suspension installed Tunnel environment Insufficient preparation Parts missing Not-well-established installation procedure Incorrect drawings Tools missing Troubles Cracks in the sapphire prisms Broken OSEM flags Wrong cables Screw galling Original estimate of installation work duration 1 month for PR3 Actually happened 3 months for test installation, 1.5 months for the actual installation.

PR2 wire breaker developed cracks Small size (2mm height) Rough surface finish No annealing (!) Operation of iKAGRA by the end of 2016 March was a strict requirement We needed to do something about it

Fixed PR2

Plan for bKAGRA

Suspensions need to be installed from Now BRT IMMT BRT ETMY ITMY PRM PR2 IMMT ITMX ETMX BRT IFI BS PR3 SR2 Type-A (cryogenic) Type-B SR3 SRM Type-Bp OFI Type-C OMMT Others OMC OST

I will focus on the large suspensions ETMY ITMY PRM PR2 IMMT ITMX ETMX IFI BS PR3 SR2 Type-A (cryogenic) Type-B SR3 SRM Type-Bp

Overall Schedule

VIS team organization Three teams Preparation status Type-A: 1 scientist, 2 engineers, 1 student Type-B: 2 scientist, 1 engineer Type-Bp: 1(+1) scientist, 1 student, (1 engineer) Preparation status Type-A Suspension components are mostly ready Installation procedure is being tested Some local sensors needs to be added Installation will start from Dec. 2016 Type-B Most of the components are ready except for two additional payloads Installation procedure is being finalized Start the test installation from July Type-Bp Additional sensors/actuators need to be retrofitted to damp some resonances Except for the modifications above, most of the suspension components are ready Installation will start from Feb. 2017

Technical Issues

Type-Bp damping issue No inverted pendulum A high Q mode survives

Type-Bp damping issue Additional sensors/actuators Active damping on the bottom filter Reduced RMS

Better inertial sensors for the pre-isolators ? (Type-B and Type-A) Original plan: Use Geophones The noise may not be good enough Alternative options: Accelerometers by NIKHEF Being tested with BS

OSEM flags are huge We broke them during the suspension assembly work Thermal noise concern -> calculation says barely OK

Decided to remove the flags from the optics No sensing. Only actuation. Use an optical lever instead Two QPDs at different Gouy phases to sense the longitudinal motion

Wider gap OSEMs for IM Narrow Wide

bKAGRA phase 1 BRT Mode Cleaner IMMT BRT Type-A (cryogenic) Type-B ETMY Mode Cleaner PRM PR2 IMMT ETMX BRT IFI BS PR3 SR2 Type-A (cryogenic) Type-B SR3 SRM Type-Bp Type-C Others

BRT Before bKAGRA phase 1 ETMY Mode Cleaner PRM PR2 IMMT ETMX BRT IFI BS PR3 SR2 Before the cryogenic payloads become available ... We would like to test the performance of Type-A We want to do some interferometer work SR3 SRM Put a temporary mirror on the dummy payload of Type-A ?