“Safety precautions for urgent maintenance works or repair works on the railway infrastructure during train operations by using modern IoT / wireless solutions.

Slides:



Advertisements
Similar presentations
1 Wireless Middle East Forum: January 2006 Industrial Experience of Wireless Applications: Drivers, Productivity Impact, and Challenges Nabil K.
Advertisements

DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY MANAGEMENT CONSULTING Early Lessons Learned from DOE-EPRI Framework Experience Melissa Chan MA DPU.
Applications of Wireless Sensor Networks in Smart Grid Presented by Zhongming Zheng.
Smart Sensor Technology For Rail Network health Hawk Measurement Systems.
1 Hong Kong Institution of Engineers (Information Technology Division) Annual Conference 22 May 2014.
Wireless The Technology of the Future for Process Automation.
Workshop on Infrastructures Sustainable Infrastructure for Efficient Mobility: the Key Challenges Luc Bourdeau ECTP Secretary General Industrial Technologies.
Turning the change of Globalisation into an Opportunity Understand reality then make reality better.
Smart Buildings Srirangarajan Kadaba National Manager – Energy Edge Buildings Business Schneider Electric 21June 2010.
1 PredictiveOnLine PREDICTIVE SYSTEMS ENGINEERING Vintec Knowledge Ltd.
Powered by M2m methodology diagram Anything Anywhere Our specialist expertise and partnerships have enabled us to tailor smart monitoring solutions and.
MOTOROLA and the Stylized M Logo are registered in the US Patent and Trademark Office. All other product or service names are the property of their respective.
Planning and Analysis Tools to Evaluate Distribution Automation Implementation and Benefits Anil Pahwa Kansas State University Power Systems Conference.
IntelliSense.io Beyond the hype - Real World Applications / Solutions of Internet of Things.
Indian Railways: Greening the tracks Achieving the 1 GW solar PV target Aditya Ramji Junior Research Associate Council on Energy, Environment and Water.
1 Drivers for Building Life Cycle Integrations Jim Sinopoli.
Fatal Risk Working Group - Working at Height Martin White - Head of Birse Rail.
1 Are you really in control? 2 A Program-Focused Solution 3 How we help you succeed 4 Who We Are 5 Success Stories.
Railway Demonstration. 2 Low-Density Traffic Lines * n Single track, few trains/day –High safety requirements –High installation and maintenance costs.
Wireless Data Technologies
TMALL 0141 Presentation v 1.0 Asset Management Bo Olsson Bucharest October 7th, 2015.
Data Center Management Microsoft System Center. Objective: Drive Cost of Data Center Management 78% Maintenance 22% New Issue:Issue: 78% of IT budgets.
Network Video Solutions for Education Applications.
RETENTION SYSTEM sockets for post installation THE INTELLIGENT FOUNDATION FOR POST INSTALLATION TM.
Controlling Environment Monitoring Networks CLEEN MMEA Seminar / Olli Ojanperä & Panu Kilponen Session 1: Data, data everywhere - open and closed.
Internet of Things. Creating Our Future Together.
1 Address: UIC Safety Database (SDB) System and Results.
Alberto Paradisi- Vice-President - CPqD in IoT Week Belgrado - Innovation day Brazil Session: IoT Panorama and Collaboration.
Manufacturing. Mobile workforce management Asset management Intelligent track and trace Condition-based maintenance Remote monitoring Learn how to ramp.
INDUSTRY 4.0: FROM THINGS TO OUTCOMES
Today´s Challenges of the Rail Infrastructure Industry
Emerging Trends in Nuclear Information Management
Future Rail and Road developments
Public Conference December
Transforming Asset Management in the Digital Economy
TOPIC: THE VALUE OF BIOMEDICAL ENGINEERS AND TECHNICIANS IN HOSPITAL PRESANTED BY: KWIZERA ABRAHAM STUDENT IN: BMET /FINALIST STU INSTITUTION: IPRC KIGALI.
IoT in Manufacturing SEPT 2017.
PRESENTATION Development of a wireless sensor system for the vehicles to resolve different problems. Presented by : Apoorva (T.Leader) Gaurav Mayank Neeraj.
id: WEbsite: Welcome to Vigil Safety Technologies id:
PanAust: Launching New Mining Projects Quickly and Efficiently with SAP® Business Suite powered by SAP HANA® Company PanAust Limited Headquarters Brisbane,
THE POTENTIAL FOR BIG DATA AND OCCURRENCE REPORTING FOR BETTER SAFETY MANAGEMENT Jen ABLITT, Head of Safety Strategy and Performance Sector.
Providing Big Data to facilitate Collaboration in a Safety Railway Environment Jens-Peter Brauner, VP Mobility Division, Siemens Ltd. Hong Kong 27th International.
Accident investigation: what’s the point?
Application and content management framework for railway operators
JSC “UKRAINIAN RAILWAY” (UZ) DEVELOPMENT STRATEGY FOR
SMART BUILDING WITH INDOOR NAVIGATION SYSTEM -using iot
Avocado Security Solutions, Avocado Open Architecture Convergence platform (OAC) Consolidation Centralized viewing & Management Security Asset Management.
Improving the WiFi Customer Experience
Increasing Asset Lifecycle through the application of Innovative Technology
IOT & Railway rolling stock
Advanced IoT Mobile App Development Company
Yarden Avishai, Justin Heeren, Asaf Kanari, Melody Qiao Team 16
Bluetooth Based Smart Sensor Network
Across the entire value chain
Yarden Avishai, Justin Heeren, Asaf Kanari, Melody Qiao Team 16
بسمه تعالی کارگاه ارزشیابی پیشرفت تحصیلی
We support TVET as a mandatory criterion in infrastructure tenders
Internet of Things Company
Customer Outreach & Water Infrastructure
Security for Safety: Enabling Digitalization of Railway Systems
Perfect Telecom Services Managed Services &
Powering education for next-generation leaders
Rail Safety Summit 1st November 2018 Ian Prosser CBE
Business Needs Digital Transformation
S4/HANA - Leonardo and IoT Equipment Rental Business Transformation
Agenda The current Windows XP and Windows XP Desktop situation
Capitalize on Your Business’s Technology
Cloud Management as a Service
Modular Edge-connected data centers
Even Smarter Underground Asset Management
Presentation transcript:

“Safety precautions for urgent maintenance works or repair works on the railway infrastructure during train operations by using modern IoT / wireless solutions in the field” 27th International Railway Safety Council 2017 Hong Kong, October 22-27, 2017 By: Alex W.M. Ruiter BSc.

Amsterdam City Amsterdam Rail Map Location: Amsterdam The Netherlands

A’dam Central Station Architect: P.J.H. Cuypers October 1889

MTinfo 3000 MTinfo 3000 is the secure IoT platform for rail infrastructure and railway stations in The Netherlands

Facts Availability of IoT platform MTinfo 3000 205 central operated points 12 miles railway tracks 10 miles railway catenary 200 track sections Downtime cost impact ca. $ 65,000 / hour Some figures 205 central operated points 18 km track 16 km catenary 200 track section Downtime € 60,000.= / hour

Client’s Targets Our Client reduced the maintenance time slots during night shifts from 5,5 hrs.  4 hrs. Maintain safety Maintain field productions Some figures 205 central operated points 18 km track 16 km catenary 200 track section Downtime € 60,000.= / hour

Our Challenges Guarantee safe working environment towards our mechanics / rail workers in the field Achieve production according Client’s targets Limit disturbance train operations Some figures 205 central operated points 18 km track 16 km catenary 200 track section Downtime € 60,000.= / hour

Cables vs Wireless “Robust” “Fast” “Wireless” “Focus” “Cables causing headache” “too expensive” “too many failures”

Our solutions “POSS” “Railway Condition Monitoring” “ZKL 3000 RC” “SIL 4 remote shunting device”

POSS® implementation

Rail switches equipped with POSS monitoring (205 nos) IoT implementation Wireless sensors Current clamp Rail switches equipped with POSS monitoring (205 nos)

Report repairs / maintenance Asset Management POSS monitoring 2 weeks in advance Improve algorithms Report repairs / maintenance Planned work

Asset Management Continuous monitoring Improve algorithms Report repairs / maintenance Execution maintenance works

Asset Management Continuous monitoring Improve algorithms Report repairs / maintenance Execution maintenance works

Asset Management Continuous monitoring Improve algorithms Report repairs / maintenance Execution maintenance works

Installation ZKL3000 RC (22 nos) IoT implementation Installation ZKL3000 RC (22 nos)

Maintenance Works Some figures 205 central operated points 18 km track 16 km catenary 200 track section Downtime € 60,000.= / hour

Maintenance Works Some figures 205 central operated points 18 km track 16 km catenary 200 track section Downtime € 60,000.= / hour

Achievements Zero worker fatalities Zero collisions 0% risk of safety mistakes 30% reduction of point failures 5720 less times in Operational track Gained 500 hours extra availability Ca. $ 30 mio savings Some figures 205 central operated points 18 km track 16 km catenary 200 track section Downtime € 60,000.= / hour Client satisfaction

Digital technology IoT / wireless has the future ! Digital vs Mechanical Digital technology IoT / wireless has the future !

Thank you very much for your kind attention. Internet Of Railways “on the right track” Thank you very much for your kind attention.