Hammer Project Celcom CA SSO Project

Slides:



Advertisements
Similar presentations
3G and B3G Deployment China Mobile Research Institute
Advertisements

Slide title In CAPITALS 50 pt Slide subtitle 32 pt Post Launch Tuning Cingular UMTS.
Layer 3 Messaging and Call Procedures
RNO Wind Part II.
AB 11 22 33 44 55 66 77 88 99 10  20  19  18  17  16  15  14  13  12  11  21  22  23  24  25  26  27  28.
RF OPTIMISATION IN GSM NETWORKS Regional Telecom Training Centre, Trivandrum :
Capacity and Load Sharing in Dual-Mode Mobile Networks
© Omnitele Ltd Analysis of Service Quality in 3G Mobile Networks Heidi Lagerström Supervisor: Professor Heikki Hämmäinen.
Self-Management for Unified Heterogeneous Radio Access Networks ISWCS 2015 Twelfth International Symposium on Wireless Communication Systems Brussels,
Slide title In CAPITALS 50 pt Slide subtitle 32 pt H igh S peed D ownlink P acket A ccess Naren Mohan
Slide title In CAPITALS 50 pt Slide subtitle 32 pt HANDOVER Overview.
Janne Myllylä T GPRS optimisation and Network visualization.
1 © NOKIA Streaming QoS/Musa Aldarawsheh, April 8 th 2005 Author: Musa Aldarawsheh Senior I&V Engineer/ Nokia Networks Supervisor: Prof. Sven-Gustav Häggman.
06/09/2005Master's Thesis Seminar - Jesse Kruus 1 Analyzing and Developing Base Load for WCDMA Base Station Automated Testing System Thesis written at.
too.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Dynamic and Persistent Scheduling for Voice over IP Traffic in the Long-Term Evolution Uplink Master’s.
Business Id © NetHawk All rights reserved. Confidential April 2005NetHawk NetHawk Quality of Service products Markus Ahokangas, MSc Product.
LTE Mobility. Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt POST LAUNCH TUNING.
Rev PA1 WCDMA RAN PM - Supplemental Information 3/3/20051 WCDMA RAN PM Supplemental Information.
Page: 1 Technology Planning IS-95 IS-2000 Hand-off Analysis Prepared by Dragan Nerandzic, Bell Mobility.
2G Vs 3G Drive TEST with tems
HSPA/HSDPA (Beyond 3G) PRESENTED BY- NEHA ANAND NUPUR ANAND ROLL NO-50 ROLL NO-55.
親愛的吉姆舅舅: 今天吃完晚餐後,奶奶說,在家 裡情況變好以前,您要我搬到城裡跟 您住。奶奶有沒有跟您說,爸爸已經 好久沒有工作,也好久沒有人請媽媽 做衣服了? 我們聽完都哭了,連爸爸也哭了, 但是媽媽說了一個故事讓我們又笑了。 她說:您們小的時候,她曾經被您追 得爬到樹上去,真的嗎? 雖然我個子小,但是我很強壯,
HUAWEI 3G CAPACITY OPTIMIZATION.
Yupana Experience & Solutions October /24/2015Confidential.
LTE L17A O&M courses and RBS 6000 / Baseband related courses
Hammer Project KV020 S-KPI CBO
Celcom Golden cluster Post Drive test peak result
Content Layer3 Message Analysis.
Executive Summary GFR has been successfully implemented on 22th April 2014 POC MATARAM: Perceived Drop Rate, SDCCH Drop Rate, SDCCH Success Rate , TBF.
Long Term Evolution (LTE) and System Architecture Evolution (SAE)
Way Forward on UE measurement definition and capability
Project hammer T00278 LTE DT Analysis Celcom CA Project
Project CA project T00087 oss KPI justification - Appendix CA Project
Hammer Project Celcom CA SSO Project
Project hammer d00346 Sub Cluster CA - SSO Celcom CA Project
Author: Mathias Nyman Supervisor: Prof. Sven-Gustav Häggman
Hotspot KPI Guideline YL.Y
4G_CA project_OSS Justification
Hammer Project KV020 S-KPI CBO
Single Site Acceptance Report for TIGO UMTS Project Phase II
Project hammer Cluster C00200 CA - SSO Celcom CA Project
Hammer Project KV020 S-KPI CBO
Hammer Project Celcom CA SSO Project
BS BEM 3.4 – 3.8 GHz Ericsson input PT1 XO, 7 jan 2013
Project hammer d00219 Sub Cluster CA - SSO Celcom CA Project
Celcom KV/OKV Hammer Project
UMTS Call Drop Analysis
Celcom LTE CA Project_OSS
PC_SBE_09 WCDMA OSS Analysis
4G_CA project_OSS Justification
Celcom LTE CA Project_OSS
LTE Mobility LTE Mobility.
PROJECT BAU MODERNIZATION
Project hammer PC_CA_SWE_07 CA Celcom CA Project
An Overview on LTE.
Project hammer PC_CA_ERE_06 LTE DT ANALYSIS Celcom CA Project
By Norton Setup CA TollFree (US/CA/AU/UK)
Hauwei hcs in dual band netwrok
Self-Management for Unified Heterogeneous Radio Access Networks ISWCS 2015 Twelfth International Symposium on Wireless Communication Systems Brussels,
Mobile Synchronization Trends 4G to 4.5G to 5G
Wireless Communications
Comparison Between HSPA Family
Research Accounting Office
Network-Health Report
Optimisation of Softer Handover in UMTS Network
X Documentation Batch No Date Pass/Fail Signature /10/05
GSM Radio Network Optimization. Absolute Radio Frequency Channel Number (ARFCN)  GSM 900 F U (n) = n MHz F D (n) = Fu(n) + 45 MHz Where: 1.
Supervised By Dr. / Adel Yehia Ezzat
Presentation transcript:

Hammer Project Celcom CA SSO Project 2017-05-10 Celcom LTE FDD CA project pC_CA_ERE_08 oss KPI Trending - Appendix © Ericsson AB 2016

Hammer Project Celcom CA SSO Project 2017-05-10 3G OSS KPI Trending © Ericsson AB 2016

pC_CA_ERE_08 3G oss kpi justification CA Project SSO 2017-06-05 pC_CA_ERE_08 3G oss kpi justification # Description Target Value Technology Baseline KPI Result PASS/FAIL comments 3G 2017-01-02 to 2017-01-08 2017-05-24 to 2017-05-30 A.19.4.19.1 Cell Availability Maintain/Improved 99.29 99.69 Pass A.19.4.19.2 CSSR_AMR 99.57 99.82 A.19.4.19.3 CSSR_PS 99.65 99.74 A.19.4.19.4 AMR Call Drop Ratio 0.26 0.13 A.19.4.19.5 PS Service Drop Ratio 0.48 0.42 A.19.4.19.6 SHO Success Rate (AMR Service) 99.72 99.71 Fail Refer to OSS Justification A.19.4.19.7 SHO Success Rate (PS Service) 99.88 99.93 A.19.4.19.8 HS-DSCH Service Cell Change Success Rate 99.98 A.19.4.19.9 HSDPA RAB Setup Success Rate 99.05 98.88 A.19.4.19.10 HSUPA RAB Setup Success Rate 99.87 99.85 A.19.4.19.11 HSDPA Retainability 0.50 0.37 A.19.4.19.12 HSUPA Retainability 0.47 0.35 A.19.4.19.13 CS Inter-RAT Handover Success Ratio 99.83 A.19.4.19.14 CS Inter-Frequency HHO Success Rate 94.69 98.29 *Refer to OSS Justification A.19.4.19.15 PS Inter-Frequency HHO Success Rate 83.69 96.64 A.19.4.19.16 RTWP -102.22 -102.05 A.19.4.19.17 PRACH propagation delay(KM) 0.62 0.61 A.19.4.19.18 CS Traffic(Erl) 26381.81 23551.21 A.19.4.19.19 CS RAB attempt 1287071.00 1275993.00 PS RAB attempt 106036619.00 108227445.00 A.19.4.19.20 PS traffic(MB) 20494077.27 25026909.35 © Ericsson AB 2017

CA Project SSO 2017-06-05 CSSR Baseline Result © Ericsson AB 2017

CA Project SSO 2017-06-05 DCR Baseline Result © Ericsson AB 2017

CA Project SSO 2017-06-05 TRAFFIC Baseline Result © Ericsson AB 2017

Hammer Project Celcom CA SSO Project 2017-05-10 4G OSS KPI Trending © Ericsson AB 2016

Celcom LTE CA Project_OSS 2017-06-20 CSSR Trending © Ericsson AB 2016

Celcom LTE CA Project_OSS 2017-06-20 Drop Call Rate Trending © Ericsson AB 2016

Celcom LTE CA Project_OSS 2017-06-20 LTE Data Traffic Trending © Ericsson AB 2016

Hammer Project Celcom CA SSO Project 2017-05-10 © Ericsson AB 2016