EYETS 2016/2017 Activities SPS Access system Maintenance and Evolutions 07.09.2016 Access system EYETS 2016/2017 EDMS: 1551728.

Slides:



Advertisements
Similar presentations
Commissioning the access system M. Gruwé Machine checkout workshop November 8 th 2007.
Advertisements

SPS Access Project PL, EMP Chamonix XV, EDMS: SPS Access Safety System Patrick Lienard, Elena Manola-Poggioli on behalf of the SPS Access.
RAMSES & ARCON Radiation Monitoring for the Environment and Safety Basics and Overview M. Widorski, DGS/RP EDMS
Tomasz Ladzinski GS/ASE. LASS Annual Maintenance & Tests General Principles Each winter shutdown preventive maintenance of EIS takes place. It is followed.

Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Tomasz Ladzinski, Didier Vaxelaire. Current Access Configuration 18/06/2015T.Ladzinski GS/ASE2.
LHC ACCESS SYSTEM 1Authors: P, Ninin, S. Grau & LHC access team EDMS: Access System during the LHC Injection tests P. Ninin, S. Grau - TS/CSE Workshop.
LHC Access System August 2006 LHC Access System – Status and Planning August 2006 Elena Manola-Poggioli Eva Sanchez-Corral TS-CSE on behalf of the LHC.
LHC ACCESS SYSTEM 1 Authors: P. Ninin, L. Scibile, T. LadzinskiEDMS: Access Control and Safety System for the LHC Experiments P. Ninin L. Scibile.
LHC ACCESS SYSTEM 1 Authors: P, Ninin, L. Scibile T, Ladzinski EDMS: The LHC Access System Where do we stand ? P. Ninin, T. Ladzinski, L. Scibile,
Access system M. Gruwé (AB/OP) Thanks to TS/ASE group Extended LTC meeting March 3 rd 2008.
TS Workshop, Archamps 4 May 2004 SAFETY AND ACCESS CONTROL Where do we stand ? P. Ninin & the Access project team TS/CSE,
LHC ACCESS SYSTEM 1 EDMS: January 2008 Global Tests of the LHC Access system Outcome P. Ninin, T. Petterson, S Grau, T. Ladzinski 18 th January.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
Controls, Safety and Engineering Databases 18 Jan 2006PS & SPS Days Access Safety Systems Modifications & tests in 2006 Presented by Rui Nunes TS-CSE-AAS.
GIF completion status Adrian Fabich, EN-MEF-LE on behalf of the GIF project team GIF users meeting, 14 th January 2015.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
Access system LHC-SPS M. Gruwé and J. Ridewood OP days March 18 th 2008.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Electrial Safety LS2 days November 2016 AP
Magnet activities in SPS during EYETS
LIU and TE/VSC activities LIU-SPS aC coating & flange impedance reduction Paul Cruikshank LIU & TE/VSC activities, 23/6/2016 Paul Cruikshank.
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
YETS & LS2 Works EN-EL / Power distribution
SPS Personnel Protection System Renovation Project
ABT-EC EYETS Activities 2nd reports
Framework Schedule from EYETS 2016 to LS2
BE-ICS activities for LIU Project
SPS Crab Cavity Test Stand: Safety review summary
SPS LS1 Planning meeting (N019) 04/09/13
SPS Winter stop Planning meeting (N06) 05/01/2011
PSB Lock Out Test, Follow-Up AP. Bernardes-/EN-STI, K
EYETS Works EN-EL [ FC excluded ]
IT-4189 Supply and installation of a cryogenic distribution system
YETS & LS2 Works EN-El on LHC / Power distribution
BE-ICS Activities during the LS2 Period (15 min)
TE-MSC activities in SPS during LS2
CENF – Personnel Protection System Preliminary Study
Safety Documentation EHN1
CENF – Personnel Protection System Preliminary Study
Injector De-cabling Project
Safety in Construction and Upgrade Phases
Beam Loss and Radiation Working Group: Conclusions
EN-EL-FC Activity Jeremy Blanc, EN-EL-FC.
Saturday :12 Stable beams fill 3351 Initial luminosity
LAAWG Status Report – 15th May 2007
BE-ICS activities for LIU Project
Buffer Zones - Status Report
Installations, modifications, consolidation in 2005:
EN-HE SPS works during EYETS
SPS EN-CV Planning LS (initial draft)
SPS Planning for the EYETS Meeting 8 (07/12/2016)
SPS LS1 Planning meeting (No.34) 16/04/14
the CERN Electrical network protection system
SPS CC: Final plan for interlocking of crab cavities in SPS
SPS East Extraction bump inhibit during COLDEX operation
SPS activities during LS2 TE-EPC (Power Converter Group)
Summary of ECRs for the YETS Booster, PS, ISOLDE and associated transfer lines (LIU + Consolidation) T. Birtwistle (EN-MEF-DC)
LHCb & EYETS
Load Balancing: List Scheduling
YETS & LS2 Works EN-EL / Power distribution
James Ridewood BE-OP-SPS
Overview & baseline of LS2 and roadmap for CRG
TE-MSC activities in SPS during YETS
BE-ICS work for SPS Safety Systems
Assumption for a given sector
Technical Stop #4 29th August - 2nd September 2011
Load Balancing: List Scheduling
Access Control for CERN Experimental Areas
Presentation transcript:

EYETS 2016/2017 Activities SPS Access system Maintenance and Evolutions 07.09.2016 Access system EYETS 2016/2017 EDMS: 1551728

Access control maintenance Perform preventive maintenance of all elements & access points (turnstiles, material doors, access keys, doors, search box, power supply…). ½ day per access point. 1 day per sites tunnel. Transparent for access. Tests individual site ½ day per site. No access. To be scheduled in collaboration with coordination team. Tests inter-machine doors : PS/SPS & SPS LHC. PS/SPS TT10: To be defined (YDPZ01.100611=TT10). SPS/LHC: 19/01 TI8 (YDPZ01.8270=TI8) & 22/01 TI2 (YDPZ01.22809=TI2). Tests Global Access system. 1 day for Chain 1, 2, 3, 4, 5. Tests DSO. 1 day for Chain 1, 2, 3, 4, 5. “All EIS beam shall be available”. Transfer ACCESS MODE & ACCESS CONTROL. CCC OP SPS to CSA (changing the local configuration, ½ day for all site). No access. CSA to CCC OP SPS (changing the local configuration, ½ day for all site). No access. To be scheduled in collaboration with coordination team. 07.09.2016 Access system EYETS 2016/2017

Access control maintenance & Safety evolutions BA80 create an interlock with the ventilation system. ECR N°------ En cour de rédaction: EN_CV Cabling. Load PLC prog. Upgrade Scada WINCC. Test: 1 day. No access. To be scheduled in collaboration with EN-CV and coordination team. ECA4, ECA5, BA6, BA7 create an interlock with radiation monitor. ECR N° https://edms.cern.ch/document/1716612/1/TAB3 Cabling each site. Load PLC program for each site. Testing each site. 1 day (chain 1 & 2 & 4), No access. To be scheduled in collaboration with HSE-RP and coordination team. 07.09.2016 Access system EYETS 2016/2017