Engineering Team Central Office Team Trimming & Splicing Team

Slides:



Advertisements
Similar presentations
Financial Planning 1 Introduction and Budgeting. Learning Objectives Understand the importance of linking planning and budgeting Understand the importance.
Advertisements

TITAN Group …….Managing Site Build up for the telecom sector TICS Telecom Projects Consultancy Pvt. Ltd.
BSA Health System, May 2009 Next Slide Previous Slide BSA HEALTH SYSTEM Infection Control during Construction, Renovation, Repairs, and Maintenance All.
1 Fortune Metal Inc. Cable Mining Program Asset Recovery Through Utilities Extraction Engineering Team Central Office Team Cable Removal Team Trimming.
Airline Planning Panel - Madrid May 2002 AVIATION OPERATIONAL MEASURES FOR FUEL AND EMISSIONS REDUCTION WORKSHOP Non-Revenue Flying Kevin M Morris.
Outside plant (OSP) cabling
Central Engineering Design (Electrical) Engineering Process Bertina Chan Weina Lin Hsiao-Yun Lu Sankarbharathy Ponnusamy Susu Wang.
ENERGY EFFICIENCY FOR END-USERS.  CSU Chancellors office coordinates the efforts to accomplish the goals established by Assembly Bill 32 for green house.
Cisco – Semester III Documentation. What is it most important component of a good network?  Documentation.
 Concurrent engineering requires the use of many people outside the engineering design office.  Marketing is a key element in how a part may be designed,
Word Lesson 10 Working with Templates and Styles Microsoft Office 2010 Advanced Cable / Morrison 1.
CONSTRUCTION BLUEPRINT READING
Operations Management
JIT and Lean Operations
March 2005 UMORS 1 UMORS Vander Kooi and Associates, Inc Ultimate Multiple Overhead Recovery System.
Chapter 10-1 PLANT ASSETS, NATURAL RESOURCES, AND INTANGIBLE ASSETS Accounting Principles, Eighth Edition CHAPTER 10.
Using Total Cost of Ownership To Make Decisions League of Innovation Conference March 13, 2013 Greg Nelson Vice President of Administrative Services.
RtReports in Action Barry Higgins Automation & Control Engineer.
SUBSURFACE Marker Ball Installation and Information Retention at INL David Inskeep/Shawn Williams 2014 EFCOG/DOE Electrical Safety Workshop NREL- Golden,
1 City Manager’s Proposed Budget for Fiscal Years 2010 and 2011 City of Palo Alto Finance Committee May 13, 2009 General Fund Capital Improvement Program.
Lansing Central School District Budget Update February 13, 2012 Dr. Stephen L. Grimm, Superintendent Ms. Mary June King, Business Administrator.
0 0 Six Sigma – Financial Overview. 1 1 Roles and Responsibilities of the Finance Support Team Policy Setting – Define Savings/Benefits – Provide tools.
 The purpose of this Lockout/Tagout Procedure is to have a positive method of confirming that a piece of equipment, machine, or device is not energized.
McGraw-Hill/Irwin © 2008 The McGraw-Hill Companies, Inc., All Rights Reserved. 1-1 McGraw-Hill/Irwin © 2008 The McGraw-Hill Companies, Inc., All Rights.
International Newspaper Group 2008 Gannett’s Green Campaign.
Marketing Introduction Concurrent engineering requires the use of many people outside the engineering design office. Marketing is a key element in how.
There are two (2) Tax Aggregate Reports to choose from: Current Tax Aggregate Report, or the Tax Aggregate by Tax Year. (Menus, Reports, Audit) Balancing.
Addictive Flow Jessica Escalona. What is Addictive Flow? ► We’re not just a recording studio. We’re a production company. ► Specialize with hip-hop and.
Digital recordkeeping strategy for mobile work processes Joel Smith HPRM System Administrator.
1 Verizon Florida, LLC Hurricane Season Preparation PSC Workshop – May 6, 2009.
Data Center Management Microsoft System Center. Objective: Drive Cost of Data Center Management 78% Maintenance 22% New Issue:Issue: 78% of IT budgets.
2014 Storm Preparedness Jeff Brewer – Manager of Engineering Tri-County Electric Cooperative, Inc.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D.,
® Forging new generations of engineers. Marketing.
HEALTHCARE SYSTEM Infection Control during Construction, Renovation, Repairs, and Maintenance All workers engaged in the construction, renovation, repair,
SINGLE WINDOW LOGISTICS SOLUTION Presentation From : NRV LOGISTICS PVT. LTD. ` SINGLE WINDOW SOLUTION.
The Importance of Accurate Documentation for Fiber Optic Networks Randy Anderson VP – Software Advance Fiber Optics.
Marketing in Engineering Design. Introduction Concurrent engineering requires the use of many people outside the engineering design office. Marketing.
Your Septic System Designing and its Maintenance.
Author name here for Edited books chapter 9 Facility Maintenance 9 chapter.
BUDGET PROCESS & REVENUE & EXPENSE INFORMATION For FISCAL YEAR 2011.
“Optimizing Collection System Program Performance
FINANCIAL PLANNING Beginning a business Startup Money source
EDENTON-CHOWAN SCHOOLS
Energy Savings Projects
UMCP Learning Objectives
Manager Environment, British Airways
Industrial Assessment Center Database
Implementing Effective Energy O&M Strategies on a Limited Budget
Chapter 5 The Accounting Cycle Completed
FINANCIAL PLANNING Beginning a business Startup Money source
Forging new generations of engineers
Company Overview Big Green Group® (“BGG”) is led by President and CEO Michael A. Dennis. BGG is headquartered in New Jersey and its business operations.
Marketing in Engineering Design
2018 ING Chicago.
12-2 Financial Records and Financial Statements
Financial Records and Financial Statements
Year End Essentials Presented by: Carol Kossoris, CPA, MBA
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
© 2015 Cengage Learning. All Rights Reserved.
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Capital Improvement Plans
Disaster Preparedness
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
EDENTON-CHOWAN SCHOOLS
WSD PROPOSED FINAL GENERAL FUND BUDGET
Agenda FYE June 30, 2020 Operating Budget
Agenda FYE June 30, 2020 Operating Budget
Presentation transcript:

Fortune Metal Inc. Cable Mining Program Asset Recovery Through Utilities Extraction Engineering Team Central Office Team Trimming & Splicing Team Cable Removal Team

Engineering Team Our Engineers will sweep through your network to identify and prioritize cables for extraction Once cables are identified, our team will prepare work order packages, consisting of full size prints and manhole details The package is now handed off to our central office team to audit cables

Central Office Teams Our central office teams are responsible for auditing both the MDF and CXF. If the audit reveals any working services, a list will be provided for redesign Once cables have been cleared of any existing working services, all modules are removed and the package is now handed off to our trimming crew

Trimming Crews The trimming crew will recheck the MDF and CXF and walk each cable run and locate all manholes. The outside crew will move through the manhole system trimming and removing splices. In addition, they will also identify and can repair any air pressure leaks. After the trimming is completed, the package is then handed off to the extraction crew

Trimming Crews (cont.) No cable is cut without first completing our 5 step method: (1) Check for cable tag and duct location (2) Verify sheath tone from central office (3) Establish talk pair with splicer in the central office (4) Short and ground additional cable pairs within the splice (5) Probe each group with a T-Bug checking for battery Once this process is complete, the cable can be trimmed and clearly identified for the extraction

Extraction Team The lead person on the extraction crew will walk the cable run and located all manholes. The crew moves from manhole to manhole removing cables utilizing an MCV. During the extraction process, mule tape and or subduct can be pulled through the conduit. Once all cable and material has been removed, the extracted footage is recorded and all material is transported to a Fortune facility

Extraction Team (cont.) Extraction process utilizing an MCV:

Benefits Of The Program Asset Recovery ($$) for extracted cable and central office equipment Reduced Tax Burden Updated Engineering Records with manhole details Reduction in future construction costs Available duct space Maintenance expense savings through the reduction of air pressure alarms

Program Summary Over the past six years, we have removed over 16 million feet of cable. We have also removed cable and equipment from over 300 central offices across the country During this time, Fortune has paid telecommunication companies approx $50 million in scrap value for the material removed. In most cases, the value of the material recovered exceeds the cost of the removal process, resulting in a revenue generating program Our team has the ability to provide services for all, or part, of your outside plant asset recovery program