Test and Evaluation Considerations

Slides:



Advertisements
Similar presentations
1 May 2009 ver. 5.5 Materiel Development Decision (MDD) MDA: Approves AoA Study Guidance Determines acquisition phase of entry Identifies initial review.
Advertisements

“Common Process for Developing Briefings for Major Decision Points” INSTRUCTIONS Provide Feedback via to: Lois Harper PEO C4I and Space
Chemical Biological Defense Acquisition Initiatives Forum (CBDAIF)
New 5000 Documents 14 May 2001 New 5000 Documents 14 May 2001 Defense Systems Management College Acquisition Policy Department.
Life Cycle Logistics.
1 Workshop Schedule Welcome and Workshop Overview International Acquisition & Exportability (IA&E) Fundamentals Break
Verification and Validation — An OSD Perspective — Fred Myers Deputy Director, Test Infrastructure Test Resource Management Center November 4, 2009.
1 3 Dec 2008 Changes from the May 2003 DoDI Policy Flowing from Numerous New/Revised sections of Public Law since 2003 (some with Multiple Requirements)
UNCLASSIFIED DISTRIBUTION STATEMENT A – Cleared for public release by OSR on Sep – SR case number 10-S-3203 Developmental Test & Evaluation Presented.
0 2 Nov 2010, V1.4 Steve Skotte, DAU Space Acquisition Performance Learning Director New Space Systems Acquisition Policy.
CCA LSS Support Slides1 Draft The Defense Acquisition Management Framework. Post Implementation Review (PIR) Capability Needs Satisfaction & Benefits.
Materiel Development Decision (MDD) Information Requirements
2.1 ACQUISITION STRATEGYSlide 1 Space System Segments.
ICOTE Meeting October, Chief Developmental Tester Project Status for ICOTE October 2014 Brendan Rhatigan – Lockheed Martin.
Business, Cost Estimating & Financial Management Considerations
Contracting (Product) Considerations
Lesson Objective Summarize the relationship between the Joint Capabilities Integration and Development System (JCIDS) and the Defense Acquisition System.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities July 12, 2016.
Supportability Design Considerations
Lesson Objective Summarize the relationship between the Joint Capabilities Integration and Development System (JCIDS) and the Defense Acquisition System.
System Engineering Considerations (See Chapters 3 and 9)
Life Cycle Logistics.
DT&E Strategy and the Developmental Evaluation Framework (DEF) Concept & Program Implementation 5 June 2014.
MNS - Mission need statement
Lesson Objectives Assess the major requirements management activities during the acquisition process from Milestone B to Initial Operational Capability.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities April 25, 2017.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities March 7, 2017.
MDD to Milestone A Requirements Management Activities
Joint Capabilities Integration and Development System (JCIDS) and the Defense Acquisition System (DAS) RQM-310, March 2017.
ISA 201 Intermediate Information Systems Acquisition
Lesson 9 Production and Deployment (P&D) Exercise Team #
Milestone A to Milestone B Requirements Management Activities
Materiel Solution Analysis (MSA) Phase
Milestone A to Milestone B Requirements Management Activities
Production Considerations
Milestone A to Milestone B Requirements Management Activities
Lesson 9 Production and Deployment (P&D) Exercise Team #
Joint Capabilities Integration and Development System (JCIDS) and the Defense Acquisition System (DAS) RQM-310, 24 April 2017.
ISA 201 Intermediate Information Systems Acquisition
New Space Systems Acquisition Policy
DAG CH 3 Figure 11: Weapon System Development Life Cycle
CPFF,CPIF,CPAF FPIF FFP,FPIF FFP CPFF FPIF,FPAF FFP FP (EPA)
ISA 201 Intermediate Information Systems Acquisition
Joint Capabilities Integration and Development System (JCIDS) and the Defense Acquisition System (DAS) RQM-310, April 2016.
Joint Capabilities Integration and Development System (JCIDS) and the Defense Acquisition System (DAS) RQM-310, December 2015.
Milestone B to Full Operational Capability (FOC) Requirements Management Activities RQM-310, December 2016.
DAG CH 3 Figure 17: Weapon System Development Life Cycle
DAG CH 3 Figure 23: Weapon System Development Life Cycle
MDD to Milestone A Requirements Management Activities
Materiel Development Decision (MDD) to Milestone A (MS A)
Information Required for Milestone and Decision Reviews
CBA ICD CDD CDD CPD MDA MDA MDA MDA MDA AoA RVA RVA RVA
DAG CH 3 Figure 13: Weapon System Development Life Cycle
DAG CH 3 Figure 19: Weapon System Development Life Cycle
Product Support Considerations
Adjustments required for program or funding changes Options
DAG CH 3 Figure 18: Weapon System Development Life Cycle
International Acquisition and Exportability (IA&E) Considerations
DAG CH 3 Figure 28: Weapon System Development Life Cycle
Product Support Strategy
AOFR: Assessment of Operational Field Readiness
DAG CH 3 Figure 15: Weapon System Development Life Cycle
8 Tech Processes Drive Acquisition
Perspectives on Transforming DT and OT Industry-Government Roundtable
DAG CH 3 Figure 21: Weapon System Development Life Cycle
DAG CH 3 Figure 27: Weapon System Development Life Cycle
DAG CH 3 Figure 22: Weapon System Development Life Cycle
DAG CH 3 Figure 25: Weapon System Development Life Cycle
Presentation transcript:

Test and Evaluation Considerations CPD B A C MDD FRP/FD Decision Dev RFP Release Decision IOC Materiel Solution Analysis FOC Technology Maturation & Risk Reduction Production & Deployment Engineering & Manufacturing Development LRIP Decision ILA/IOT&E Operations & Support ICD Draft CDD PDR CDR FOT&E EOA/ILA ILA/OA EOA Test and Evaluation Considerations T&E Activities Designate CDT, LDTO, & LOTA Review draft CDD for testability Determine T&E Strategy Identify test resources Designate test events for each MS and develop exit criteria Describe evaluation methodology Assess T&E impacts of CONOPS/OMS/MP/ use cases Establish T&E WIPT Identify TMRR AS T&E risks/opportunities Develop TEMP Identify EMD AS T&E risks/ opportunities Conduct prototype testing Conduct EOA or LUT Conduct early Reliability testing Provide projected and observed software maturity metrics Conduct T&E to support modeling & simulation Conduct BCA on use of MRTFB facilities Update TEMP Identify Production AS T&E risks/opportunities Conduct DT&E & OA on developmental articles Conduct coupon, subsystem, and major system LFT&E Conduct cybersecurity testing Plan/conduct QT Plan/conduct PQT Plan/conduct FAT Plan/conduct RGT Update models & simulations Evaluate the system using HWIL Conduct interoperability testing Conduct IOT&E on production representative system Complete FUSL LFT&E Plan and execute FOT&E (if required) Plan T&E for PIP or next increment Conduct FAT Conduct PQT OA of modifications testing Safety testing Reliability improvement testing Conduct QT Conduct FOT&E Documentation and Reviews Acquisition Strategy Draft CDD/CONOPS Initial TEMP, PPP, LCSP Cybersecurity T&E strategy Initial Reliability Growth T&E strategy ASR System (Performance) specification CDD/OMS/MP/Use Cases Updates to TEMP, PPP, LCSP Request FUSL LFT&E Waiver (if applicable PDR, IPA, ILA CPD System (Performance) and product specifications Interface Control Documents OAR & LFT&E Report CDR, TRR, IPA, ILA DOT&E IOT&E Report DOT&E LFT&E Report FOT&E Report (if required) OA of modifications testing reports Safety testing reports Reliability improvement testing reports PCA, OTRR OA of modifications test reports Safety test reports Reliability improvement test reports

AS: Acquisition Strategy ASR: Alternative Systems Review BCA: Business Case Analysis CDD: Capability development document CDR: Critical Design Review CDT: Chief Developmental Tester CPD: Capability Production Document CONOPs: Concept of Operations EOA: Early Operational Assessment FAT: First Article Testing FOC: Final Operational Capability FOT&E: Follow-on Test & Evaluation FUSL: Full up System Life-fire HWIL: Hardware –in-the-Loop OTRR: Operational Test Readiness Review PCA: Physical Configuration Audit PDR: Preliminary Design Review PPP: Program Protection Plan PQT: Production Qualification Testing QT: Qualification Testing RGT: Reliability Growth Testing SEP: System Engineering Plan TEMP: Test and Evaluation Master Plan T&E WIPT: Test & Evaluation Working Level Integrated Product Team TRR: Test Readiness Review ICD: Initial Capabilities Document ILA: Independent Logistics Assessment IPA: Independent Program Assessment IOC: Initial Operational Capability IOT&E: Initial operational test & evaluation LCSP: Life-Cycle Sustainment Plan LDTO: Lead Developmental Test Organization LOTA: Lead Operational Test Agency LRIP: Low-Rate Initial Production LUT: Limited User Tests MDD: Materiel Development Decision MRTFB: Major Range Test Facilities Board OA: Operational assessment OMS/MP: Operational Mode Summary/Mission Profile