HV distribution and discussion

Slides:



Advertisements
Similar presentations
Status of the Clermont-Ferrand R&D works Tilecal upgrade meeting at CERN (11 February 2015) François Vazeille on behalf of Clermont-Fd team ● Active Dividers:
Advertisements

September D.I.S.H Director Information Share Hub Verification 2014 Katie Embree-Cleveland September 11, 2014.
Observations and next works from the recent tests of the insertion tools of Mini-Drawers at CERN Roméo Bonnefoy and François Vazeille Tilecal Operation.
1 WP 10- High Voltage ’06 March 23 rd HV Trip studies  See previous meetings for the foreseen tests on LBC44  Started late by Clermont people when Clermont.
Scintillation counter installation on EBC cryostat scintillators gap scintillators location of MBTS scintillators MBTS counters will be plugged into fiber.
Object-Oriented Enterprise Application Development Course Introduction.
Chapter 3.7 Formulas & Functions
Algebra 1 Ch Slope.
Active Dividers Tilecal upgrade meeting at Stockholm (3-5 June 2013) François Vazeille on behalf of Roméo Bonnefoy, Michel Crouau (Now retired) Dominique.
Upgrade developments in Clermont-Ferrand Romeo Bonnefoy and François Vazeille Tilecal upgrade meeting (CERN, 13 June 2014) ● Handling tools ● Deported.
Using GradeQuick Douglas County School System Technology Department.
Welcome to the wonders of Power Point.
Behind the Scenes – Scoping a Solution Chris Maertz, CTO.
Online Access to Student Information System. OASIS Timeline August 2009 – teachers and staff are trained and login information is shared with parents.
Activity System Credit Purpose of this document –To help us coach new consultants w/ 1 simple document –To help us utilize all reach-out methods; groups,
INTRODUCTIONS A TIME FOR SHARING Hello and Welcome back !
High Voltage System outside Drawers Tilecal upgrade meeting at Stockholm (3-5 June 2013) François Vazeille on behalf of Roméo Bonnefoy, Christian Fayard,
TE-MPE-EP, RD, 30-Nov DQLPR - are there any R2E issues? R. Denz, TE-MPE-EP.
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
Algebra – Solving Systems of Linear Inequalities Objective: Students will solve systems of linear inequalities by graphing.
Calorimeter Digitisation Prototype (Material from A Straessner, C Bohm et al) L1Calo Collaboration Meeting Cambridge 23-Mar-2011 Norman Gee.
How do you partition a circle into equal shares?.
R2E Workshop Preparations RadWG Meeting March 25 th.
Within ATLAS both TILECal and LAr are planning upgrades to the readout systems - current systems will reach limits on radiation exposure aging of components.
Information about Multi-conductor cables of the Remote HV option Wednesday Tile upgrade meeting 10 February 2016 François Vazeille (LPC Clermont-Ferrand)
On detector electronics: High voltage part Tilecal session in ATLAS upgrade week (Tuesday 10 November 2009) François Vazeille  What are the constraints.
Clermont-Ferrand requests for the Test Beam Vidyo meeting, 29 July 2015 François Vazeille -Remote HV System -Front End electronics Hypothesis: Some Mini-Drawers.
Status of the Remote HV Tile Upgrade session during the AUW Wednesday, 20 April 2016 François Vazeille on behalf of the Clermont-Ferrand team  Same set-up.
Overview of Government Regulations in  Please feel free to ask a question at any time via chat  Please include your name and what practice you.
Discussion on the integrator specifications with comparison of the 3 options Debriefing meeting at LPC, 28 April 2016 François Vazeille  Summary of the.
Answers to Barcelona questions about Mini-Drawers and comments Tilecal upgrade meeting CERN (24 June 2013) François Vazeille on behalf of Roméo Bonnefoy,
J-LAB Weekly SOL PRAcTICE
Last upgrade R&D results on the LPC works
"Drawer Mechanics - MiniDrawer"
TC activities.
Upgrade activities at Clermont-Ferrand
TALLINN UNIVERSITY Politics and Governance BA, RIPGB16
of the High Voltage part of the on-detector electronics
General aspects: Optical links :
TileCal issues and Combined Performance
TALLINN UNIVERSITY Orientation Day
Tile Upgrade Workshop (CERN- February and 9)
TileCal upgrade EVO meeting Demonstrator tesks
Concept of Drawers Thoughts on Drawers and mini-Drawers: Small story
CMS November Upgrade Week
Mini-drawers, FE-ASIC , Integrator
Tilecal week (8 February 2012)
R&D on the sliding comparison of standard and mini-drawers
Status of upgrade works at Clermont-Ferrand
LHCb electronics, 13th October 2016
LS2 LHC forward experiments
Electrical and electronic systems projects
Tilecal session in ATLAS upgrade week (Tuesday 10 November 2009)
HCS 219 RANK Lessons in Excellence-- hcs219rank.com.
Input Your Time Online New Timecard Reporting System
Solving Quadratic Equations
Key Dates for GEARS Spring 2018 All Faculty Selected Faculty
Warm-Up Day 6 Solve each of the quadratic functions by graphing and algebraic reasoning: 1. x2 – 3 = 0 2. x2 +5x – 8= 0.
CURRENT EVENTS ARE DUE TODAY!!!
CURRENT EVENTS ARE DUE TODAY!!!
Optional Practical Training (OPT)
Graduate Assistant Hiring
Writing an outline.
Simplify 8y3 12y2.
First Year review.
BLM planning 03/02/2014.
CATCH ME CARDS  Use these if you’ve run out of Catch Me cards and need more. These can be printed locally on most standard printers. All content is customizable,
SP Main FPGA & DT transition card design status
Student Accounts Receivable
THE STUDIO FAQ What is The Studio?
Presentation transcript:

HV distribution and discussion Tile week upgrade session 2013 February 1st François Vazeille See my talk given at the Tile Upgrade Week of September 2012 and the wiki page written by Gary Drake 1

HV Regulation on Drawers HV Regulation in USA15 Option 0: Full re-use of Tilecal HV Option 3: Re-use of HV cards Option 1: New design with COTs Option 4: New design with COTs Option 2: New design with RAD-HARDs Option 5: Commercial system Option 0: cancelled because of the same reasons as other electronics suited to LHC and not HL-LHC (radiations). Option 2: cancelled because of the cost. Option 5: cancelled because of the cost.  3 solutions are kept: What could be the obstacles ? Option 1: the equation HV/Radiation for some components + Manpower and cost Options 3 and 4: the routing of HV cables. Option 4: Manpower and cost 2

 Some information We cannot consider that the options 1 and 4 (new design) are the same because of the radiation constraints that will induce a different scheme.  Is there space for routing cables (Options 3 and 4) ? What are the needs when using Mini-drawers and 1.2 cm diameter cables? 1 Train of 4 Mini-drawers: 4 cables  1.2 x 1.2 = 1.44 cm2 (square to simplify). 1 Tilecal partition: 256 cables  369 cm2 Whole Tilecal: 1024 cables  1474 cm2 - Numbers submitted to Sergei Malyukov Hello Francois, at LS1 we plan cabling works, so can pull the cables, as many as you would need. I believe that later at LS2 one can install new cables for Tilecal, sough not sure that it still be me who will organize it. When you have detailed info on cables to be installed at LS1, please send them to me, including date when you would need cables on place. Regards, Sergei. Then several mails withy Dominique and myself  Easier for LB than for EB, but nothing is forbidden 3