EMI 1 (Kebnekaise) Updates

Slides:



Advertisements
Similar presentations
Grid and CDB Janusz Martyniak, Imperial College London MICE CM37 Analysis, Software and Reconstruction.
Advertisements

EMI is partially funded by the European Commission under Grant Agreement RI Recent ARC developments in the EMI project Andrii Salnikov, Ievgen Sliusar.
Don Quijote Data Management for the ATLAS Automatic Production System Miguel Branco – CERN ATC
SEE-GRID-SCI SEE-GRID-SCI Operations Procedures and Tools Antun Balaz Institute of Physics Belgrade, Serbia The SEE-GRID-SCI.
EMI is partially funded by the European Commission under Grant Agreement RI Software stack consolidation Balázs Kónya, Lund University 3rd EMI all-hands,
EMI INFSO-RI EMI Structure, Plans, Deliverables Alberto Di Meglio (CERN) Project Director ATLAS Software & Computing Week Geneva, 21 July 2011.
Overview of user client usage: ARC Iván Márton Zsombor Nagy.
EMI 1 Release The EMI 1 (Kebnekaise) release features for the first time a complete and consolidated set of middleware components from ARC, dCache, gLite.
EMI is partially funded by the European Commission under Grant Agreement RI Argus Policies Tutorial Valery Tschopp - SWITCH EGI TF Prague.
Using the EMI testbed ARC middleware Marek Kočan University of P. J. Šafárik, Košice.
DPM Python tools Ivan Calvet IT/SDC-ID DPM Workshop 10 th October 2014.
EMI INFSO-RI Accounting John Gordon (STFC) APEL PT Leader.
Installation and Configuration of A-REX Iván Márton (NIIFI) Zsombor Nagy (NIIFI)
EMI INFSO-RI Argus Policies in Action Valery Tschopp (SWITCH) on behalf of the Argus PT.
INFSO-RI Enabling Grids for E-sciencE ARDA Experiment Dashboard Ricardo Rocha (ARDA – CERN) on behalf of the Dashboard Team.
SAM Sensors & Tests Judit Novak CERN IT/GD SAM Review I. 21. May 2007, CERN.
EMI INFSO-RI EMIR integration in BDII Maria Alandes Pradillo (CERN) Information System Product Team.
EMI INFSO-RI ARC tools for revision and nightly functional tests Jozef Cernak, Marek Kocan, Eva Cernakova (P. J. Safarik University in Kosice, Kosice,
Padova, 5 October StoRM Service view Riccardo Zappi INFN-CNAF Bologna.
EMI INFSO-RI EMI 1 (Kebnekaise) Highlights Status and Plans Cristina Aiftimiei (INFN) EMI Release Manager EGI – Technical Forum Lyon, September,
EGI Technical Forum Amsterdam, 16 September 2010 Sylvain Reynaud.
EMI is partially funded by the European Commission under Grant Agreement RI Security Token Service (STS) Transforming the Existing User Credentials.
Automatic testing and certification procedure for IGI products in the EMI era and beyond Sara Bertocco INFN Padova on behalf of IGI Release Team EGI Community.
EMI Inter-component and Large Scale Testing Infrastructure Danilo Dongiovanni INFN-CNAF.
EMI INFSO-RI EMI Documentation Emidio Giorgio (INFN Catania) NA2 Leader 2 nd All Hands Meeting May 31th, Lünd.
The GridPP DIRAC project DIRAC for non-LHC communities.
EMI is partially funded by the European Commission under Grant Agreement RI Development Roadmap of the EMI middleware Balázs Kónya, Lund University,
EGEE is a project funded by the European Union under contract IST LCG open issues Massimo Sgaravatto INFN Padova JRA1 IT-CZ cluster meeting,
Co-ordination & Harmonisation of Advanced e-Infrastructures for Research and Education Data Sharing Research Infrastructures Grant Agreement n
EMI is partially funded by the European Commission under Grant Agreement RI Argus Policies Tutorial Valery Tschopp (SWITCH) – Argus Product Team.
RI EGI-TF 2010, Tutorial Managing an EGEE/EGI Virtual Organisation (VO) with EDGES bridged Desktop Resources Tutorial Robert Lovas, MTA SZTAKI.
EMI INFSO-RI /04/2011What's new in EMI 1: Kebnekaise What’s new in EMI 1 Kathryn Cassidy (TCD)‏ EMI NA2.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI GLUE 2: Deployment and Validation Stephen Burke egi.eu EGI OMB March 26 th.
John Gordon EMI TF and EGI CF March 2012 Accounting Workshop.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EGI Services for Distributed e-Infrastructure Access Tiziana Ferrari on behalf.
EMI is partially funded by the European Commission under Grant Agreement RI Future Proof Storage with DPM Oliver Keeble (on behalf of the CERN IT-GT-DMS.
Security Area Christoph Witzig (SWITCH) on behalf of John White (HIP)
Implementation of GLUE 2.0 support in the EMI Data Area Elisabetta Ronchieri on behalf of JRA1’s GLUE 2.0 Working Group INFN-CNAF 13 April 2011, EGI User.
EGEE is a project funded by the European Union under contract IST Padova report Massimo Sgaravatto On behalf of the INFN Padova JRA1 Group.
CREAM Status and plans Massimo Sgaravatto – INFN Padova
EMI INFSO-RI EMI 1 (Kebnekaise) Updates C. Aiftimiei (INFN) EMI Release Manager.
Grid Technology CERN IT Department CH-1211 Geneva 23 Switzerland t DBCF GT Middleware Update GDB, 9 th February 2011 Slides by Maria Alandes.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EGI solution for high throughput data analysis Peter Solagna EGI.eu Operations.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Feedback to sites from the VO auger Jiří Chudoba (Institute of Physics and.
EMI is partially funded by the European Commission under Grant Agreement RI EMI Status And Plans Laurence Field, CERN Towards an Integrated Information.
Argus EMI Authorization Integration
Sviluppo middleware sostenibile Il caso di EMI
StoRM: current status and developments
Delegation methods in EMI
EMI 1 (Kebnekaise) Updates
How to connect your DG to EDGeS? Zoltán Farkas, MTA SZTAKI
Security aspects of the CREAM-CE
GDB 8th March 2006 Flavia Donno IT/GD, CERN
CREAM Status and Plans Massimo Sgaravatto – INFN Padova
EMI Interoperability Activities
Massimo Sgaravatto INFN Padova On behalf of the CREAM product team
Moving from CREAM CE to ARC CE
Ipv6 nella Griglia Vincenzo Ciaschini (INFN) CCR/INFNGrid 2011
EMI 1 (Kebnekaise) release preparation status
European Middleware Initiative (EMI)
GLUE 2 Support in gLite Data Management
EMI: dal Produttore al Consumatore
Site BDII Installation&Configuration
John Gordon (STFC) APEL PT Leader
Francesco Giacomini – INFN JRA1 All-Hands Nikhef, February 2008
UMD update 11 Joao Pina (EGI/LIP).
UMD 2 / EMI 2 Decommissioning Status
UMD 2 Decommissioning Status
Introduction slides Peter Solagna – EGI.eu
The LHCb Computing Data Challenge DC06
Presentation transcript:

EMI 1 (Kebnekaise) Updates 01.08.2011 2018/9/12 EMI 1 (Kebnekaise) Updates 01.08.2011 C. Aiftimiei (INFN) EMI Release Manager

Outline 2018/9/12 EMI 1 Update 4 & 5 Future Updates 2

EMI 1 (Kebnekaise) Update 4 2018/9/12 EMI 1 Update 4: 21.07.2011 BDII core v. 1.0.1 – Emergency Update WMS v. 3.3.1-1 – Emergency Update ARGUS v. 1.3.1 – Revision Update Trustmanager v. 3.0.5 – Revision Update CREAM v. 1.13.2, CEMon v. 1.13.2 gridsite v. 1.7.15 – Revision Update 3

EMI 1 (Kebnekaise) Update 5 2018/9/12 EMI 1 Update 5: 04.08.2011 ARC CE, ARC Clients, ARC Core, ARC gridftp server, ARC Infosys - Revision Release BDII core, BDII site, BDII top – Revision Release VOMS Java API 4 ARC CE

EMI 1 (Kebnekaise) Update 5 - details 2018/9/12 ARC CE v. 1.0.1 – Revision Update: Bug 2388 - Logrotate and gridftp and A-REX Bug 2403 - arc.conf.template refers to arc server but is in package nordugrid-arc-client Bug 2411 - Only SLURM 2.2.1 supported, not newer version Bug 2427 - gm-kick is called by scan-SLURM-job but it is not installed in {$basedir} Bug 2445 - A-REX crashes when using WS-interface 5

EMI 1 (Kebnekaise) Update 5 - details 2018/9/12 ARC Clients v. 1.0.1 – Revision update Bug 1887 - arcstat -a very inefficient Bug 2420 - arcproxy manpage errors Bug 2425 - Timeout for user uploadable files is too long Bug 2430 - ARC shouldn't request a gsiftp URL when it isn't configured to use one Bug 2431 - ARC should release the TURL after transfer failure Bug 2434 - No man page – nordugridmap Bug 2453 - arcclean reporting failure at server site Bug 2456 - seg fault from gridftpd when submitting job Bug 2458 - arcls fails to list files on dcache gridftp server 6

EMI 1 (Kebnekaise) Update 5 - details 2018/9/12 ARC Core v. 1.0.1 – Revision Update Bug 2449 - ARC 11.05 parsing voms attributes Bug 2452 - ARClib's DownloadDirectory aborts with: globus_list_rest: Assertion `head != 0' failed. Bug 2370 - multiple arched processes are spawned Bug 2441 - Unable to configure ARC to build with external LCMAPS headers Bug 2407 - No check for Python.h is made in ./configure, but the python bindings are built ARC gridftp server v. 1.0.1 – Revision Update: Bug 2388 - Logrotate and gridftp and A-REX ARC Infosys v. 1.0.1 – Revision Update Bug 2429 - ldapsearch should escape parentheses Bug 2435 - No man page - arc-infoindex-relay & arc-infoindex-server 7

EMI 1 (Kebnekaise) Update 5 - details 2018/9/12 VOMS Java API v. 2.0.6 – Revision Release https://ggus.eu/tech/ticket_show.php?ticket=72093 8

EMI 1 (Kebnekaise) Future Updates 2018/9/12 Next Update – 1.Sept.2011 FTS – first release in EMI HYDRA – first release in EMI GLExec: https://gus.fzk.de/dmsu/dmsu_ticket.php?ticket=70718 BDII core: https://ggus.eu/tech/ticket_show.php?ticket=71156 bug #84368: glue-schema: Incorrect definition for some ForeignKeys https://ggus.org/tech/ticket_show.php?ticket=71455 https://ggus.eu/tech/ticket_show.php?ticket=71578 BDII site: https://ggus.eu/tech/ticket_show.php?ticket=72527 9

EMI 1 (Kebnekaise) Future Updates (2) 2018/9/12 BDII top: https://ggus.org/tech/ticket_show.php?ticket=72561 https://ggus.org/tech/ticket_show.php?ticket=70443 bug #84230: bdii-config-top: BDII_HOST variable is set to SITE_BDII_HOST STORM SE: Bug #123 - Storage Space data Initialization https://ggus.eu/tech/ticket_show.php?ticket=72464 https://ggus.eu/tech/ticket_show.php?ticket=72683 Bug #135 - Cron file points to wrong logrotate file 10

EMI 1 (Kebnekaise) Future Updates (3) 2018/9/12 WMS: https://ggus.eu/ws/ticket_info.php?ticket=70999 bug #69841: cancel requests can bounce between JC and LM https://ggus.eu/tech/ticket_show.php?ticket=71364 bug #82776: typo in WMS jobwrapper 11

Use Insert Header & Footer to set this field 2018/9/12 Thank you EMI is partially funded by the European Commission under Grant Agreement INFSO-RI-261611 Use Insert Header & Footer to set this field Use Insert Header & Footer to set this field 12