Tassielli G.F. INFN Lecce & Università del Salento

Slides:



Advertisements
Similar presentations
MDC-II LVL-1 Trigger Khaled Teilab for the MDC Trigger Team.
Advertisements

Off-axis Simulations Peter Litchfield, Minnesota  What has been simulated?  Will the experiment work?  Can we choose a technology based on simulations?
D. Peterson, “Status of the Cornell/Purdue Program” TPC R&D Mini Workshop, Orsay 12-January Status of the Cornell/Purdue Program: first events with.
Ionization. Measuring Ions A beam of charged particles will ionize gas. –Particle energy E –Chamber area A An applied field will cause ions and electrons.
Jun 27, 2005S. Kahn -- Ckov1 Simulation 1 Ckov1 Simulation and Performance Steve Kahn June 27, 2005 MICE Collaboration PID Meeting.
Update on the RICH Beamtest The RICH Group M. Artuso, S. Blusk, C. Boulahouache, J. Butt, O. Dorjkhaidav, A. Kanan, N. Menaa, R. Mountain, H. Muramatsu,
T1008 status W.Baldini for the Ferrara and Padova SuperB-IFR Group.
A cluster counting drift chamber for central tracking at ILC Roberto Perrino INFN Lecce INSTR08 Novosibirsk Mar 1, 2008.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
Feb 10, 2005 S. Kahn -- Pid Detectors in G4MicePage 1 Pid Detector Implementation in G4Mice Steve Kahn Brookhaven National Lab 10 Feb 2005.
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
Malte Hildebrandt, PSIMEG - Review Meeting / 1   e  Drift Chambers Charge Division Test Chamber Testsetup for Cosmics Chamber Construction.
Plan for 2009 CALICE beam test with ScECAL + AHCAL + TCMT Jan-28 th CALICE TB Satoru Uozumi (Kobe)
GEM Trackers for Super BigBite Spectrometer (SBS) in Hall JLab The Super Big Bite Spectrometer (SBS) is one of the major new equipment in hall A in.
Preliminary results of a detailed study on the discharge probability for a triple-GEM detector at PSI G. Bencivenni, A. Cardini, P. de Simone, F. Murtas.
2/4/2001Ludovico Pontecorvo INFN Roma1 Plans for the H8 system test: 2001/2002 Goals for the 2001/2002 Test beam Beam layout Chamber Supports 2001 Schedule.
Detailed description of the algorithm used for the simulation of the cluster counting For the studies of CluCou we have used standard programs like MAGBOLTZ,
1 A CLUster COUnting Drift Chamber for ILC …and… can we adapt this chamber to SuperB ? F.Grancagnolo, INFN – Lecce, Italy.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Preliminary results on Copper filters, with FLIC test chamber F. Pietropaolo, A. Zani, M. Meli CENF General Meeting – 22/10/2015.
M. Bonesini – CM 291 PID detectors summary M. Bonesini Sezione INFN Milano Bicocca.
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
CGEM-IT project and beam test program G. Felici for the FE-LNF-TO team Partially supported by the Italian Ministry of Foreign Affairs under the Program.
Idea for next data taking at FNAL Dec-14 th 2008 ScECAL S. Uozumi (Kobe)
Low Momentum dE/dx Testbeam H.P. 7/24/98. Goals for Spectrometer are based on tracking and PID –Multiparticle correlation –production of particle species.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
M. Bonesini - CM 22 RAL October 081 TOF0 status M. Bonesini Sezione INFN Milano Bicocca.
RD51 GEM Telescope: results from June 2010 test beam and work in progress Matteo Alfonsi on behalf of CERN GDD group and Siena/PISA INFN group.
The chamber readout scheme consists of three parallel wire planes: the first facing the drift region, with horizontal wires (Induction I plane); the other.
Development of a Single Ion Detector for Radiation Track Structure Studies F. Vasi, M. Casiraghi, R. Schulte, V. Bashkirov.
Siena, May A.Tonazzo –Performance of ATLAS MDT chambers /1 Performance of BIL tracking chambers for the ATLAS muon spectrometer A.Baroncelli,
Presentazione delle richieste immediate per l’upgrade di MEG (gruppo di Roma) Cecilia Voena Mar 15 th, 2013.
TRIUMF laboratory studies Christopher Hearty University of British Columbia/IPP 27-Sep-2010.
Status of TRIUMF Prototype Studies Christopher Hearty University of British Columbia/IPP May 31, 2010.
Upgrade of the MEG liquid xenon calorimeter with VUV-light sensitive large area SiPMs Kei Ieki for the MEG-II collaboration 1 II.
G.F. Tassielli - SuperB Workshop XI LNF1/11 02/12/2009 Status report on CLUster COUnting activities G. F. Tassielli on behalf of CLUCOU group SuperB Workshop.
A. Calcaterra, R. de Sangro, G. Felici, G. Finocchiaro, P. Patteri, M. Piccolo INFN LNF XIII SuperB General Meeting DCH-I parallel session Elba, 30 May.
Trigger & Tracking detector for CMS
TOTEM CSC construction and Quality Control Status report A.Krivshich Petersburg Nuclear Physics Institute March 07, 2006 CERN.
ICARUS T600: low energy electrons
Analysis of LumiCal data from the 2010 testbeam
L. Benussi On Behalf of LNF crew
Progress of GEM R&D in Lanzhou Univerity
High Energy Physics experiments.
DCH FEE STATUS Level 1 Triggered Data Flow FEE Implementation &
Status of BESIII and upgrade of BESIII
Atlas: Upgrade Phase I Massimo Della Pietra.
Marcin Chrząszcz Cracow University of Technology Itamar Levy
Saikat Biswas, A. Abuhoza, U. Frankenfeld, C. Garabatos,
Tests of a MM octant prototype towards a Micromegas TPC Polarimeter
Analysis and paper on chamber and telescope performance
Tracking results from Au+Au test Beam
T1 status (a selection from EDR presentations)
The interaction region for FIRST (status report)
The Beam Test at Fermilab:
STT Status Update Peter Wintz (FZ Jülich) for the STT group
MAGIX Detectors Overview
SuperB LNF meeting March 21st 2012 Marcello Piccolo
IDEA Detector Simulation Status
Update on Cluster Counting Technique
大強度
HARPO, a Micromegas+GEM TPC for gamma polarimetry above 1 MeV
The CosMic Telescope Construction of a self-triggering prototype telescope at GHz funded at the Università del Salento (Lecce) – 2 years project (end 2013)‏
ScECAL+AHCAL+TCMT Combined Beam FNAL
Perugia – IX SuperB General Meeting G. Finocchiaro INFN-LNF
MEG実験アップグレードに向けたSiPMを用いた ポジトロン時間測定器の研究開発
Univerity of rome “Tor Vergata”
Alexandre Camsonne January 13th 2015
Cluster Counting Drift Chamber as high precision tracker for ILC experiments G.F. Tassielli(1,2) (1) Dipartimento di Fisica dell’Universita’ del Salento,
Status of MUCH Electronics
Presentation transcript:

Tassielli G.F. INFN Lecce & Università del Salento DCH Test Beam for Cluster Counting studies Status and Very preliminary results Tassielli G.F. INFN Lecce & Università del Salento 10/10/17 FCC meeting

Test beam The test beam was performed at PSI in πM1 area on Sep. 13th-27th :with a drift chamber prototype to test the cluster counting/timing technique ~ 120 channel, wired with the same technique used for the construction of the MEG-II drift chamber and that could be used for the IDEA Drift Chamber; same FE electronics (different PCB layout) and same cables of MEG-II It represents a test of the MEG-II DCH integration; 10/10/17 FCC meeting

Test beam We readout of 19 channels with 2 DRS4 evaluation board and 3 1GHz bandwidth oscilloscopes at 2.5 GSs. We have an external tracking system made of a pair of silicon detectors (Modupix). A set of two pairs of scintillators for PID with TOF -> clean π/µ samples to test PID with cluster counting 10/10/17 FCC meeting

10/10/17 FCC meeting

10/10/17 FCC meeting

Data Samples HV scan (1425 to 1500 V) Data were taken in a few different conditions with 90:10 gas mixture: HV scan (1425 to 1500 V) scan of wire angle w.r.t. the beam (40° to 90°) scan of particle momentum (115 to 400 MeV/c) ~ 5 - 10 Hz DAQ rate (limited by the communication with the devices) More than 150k events were collected The data analysis is not yet started, we just start to look at some preliminary quantity just to check the consistency of the data, as an example with the help of Nilou, we performed some preliminary plots for the Cell gain: 10/10/17 FCC meeting

Data Samples (Gain trend for Cell 4 on Lay 4:) 10/10/17 FCC meeting

Summary A large statistics of tracks was taken at πM1, under different conditions, to test the cluster timing and counting techniques Data quality seems to be good: few mVRMS noise, no strange pick-up, no striking indication of ground loops, cluster structures clearly visible, etc. Data analysis will start soon 10/10/17 FCC meeting