SuperB R&D Meeting David Hitlin February 14, 2008

Slides:



Advertisements
Similar presentations
Proposal for a new design of LumiCal R. Ingbir, P. Ruzicka, V. Vrba October 07 Malá Skála.
Advertisements

REVIEW OF CRYSTAL CALORIMETERS V.B.Golubev, Budker Institute of Nuclear Physics, Novosibirsk, Russia.
Recent news about SiPM based applications R&D in DESY Nicola D’Ascenzo University of Hamburg - DESY.
Fast simulator for Super-Belle Christoph Schwanda HEPHY, Austrian Academy of Sciences BNM 2008, 3rd Int. Workshop on B Factories and New Measurements Atami,
B.G. Cheon (Hanyang), H.J.Kim (KNU), E. Won (KU), S.S. Myoung S.K. Kim(SNU), Y.J. Kwon (Yonsei)
Charged Particle Tracker for a RHIC/EIC joint detector Detector layouts based on EIC and NLC Physics drivers Silicon detector technologies Simulations.
David Hitlin US/Canadian SuperB Meeting Sept. 3, EMC R&D for SuperB David Hitlin US/Canada Super B Meeting September 3, 2008.
Thoughts on Mu2e Electromagnetic Calorimeter Craig Dukes Mu2e Meeting June 3, 2008.
PPARC forum on developments in scintillator technology R M Brown - RAL 1 Scintillating Crystals for Particle Physics Outline  Performance considerations.
EXL/crystal simulations B. Genolini Simulation of NUSTAR crystals with Litrani Presentation of Litrani: simulation of.
The Design of Barrel Electromagnetic Calorimeter (BEMC) October Lu Jun-guang.
Study of response uniformity of LHCb ECAL Mikhail Prokudin, ITEP.
T.C. Jude D.I. Glazier, D.P. Watts The University of Edinburgh Strangeness Photoproduction At Threshold Energies.
Heavy Scintillating Crystal Fibers for calorimetry
Shower Containment and the Size of a Test Calorimeter Adam Para, September 6, 2006.
Valery Dormenev Institute for Nuclear Problems, Minsk
The Tungsten-Scintillating Fiber Accordion Electromagnetic Calorimeter for the sPHENIX Detector Craig Woody, for the PHENIX Collaboration Physics Department,
Start Counter Collaboration Meeting September 2004 W. Boeglin FIU.
T. Sugitate / Hiroshima / PHX031 / Nov.01 The Photon Spectrometer for RHIC and beyond PbWO 4 Crystal Density 8.29 g/cm 3 Radiation length 0.89 cm Moliere.
PID for super Belle (design consideration) K. Inami (Nagoya-u) - Barrel (TOP counter) - Possible configuration - Geometry - Endcap (Aerogel RICH) - Photo.
Apollo Go, NCU Taiwan BES III Luminosity Monitor Apollo Go National Central University, Taiwan September 16, 2002.
The Case for the Dual Readout Calorimetry for SiD Adam Para, December 4, 2007.
Results from particle beam tests of the ATLAS liquid argon endcap calorimeters Beam test setup Signal reconstruction Response to electrons  Electromagnetic.
LHC The Large Hadron Collider (LHC) is an accelerator with 27 km circumference. Being built on the France- Switzerland border west of Geneva. It will start.
The LHCb Electromagnetic Calorimeter Ivan Belyaev, ITEP/Moscow.
EMC simulation: effects of geometry options on energy resolution PID + EMC joint meeting LAL 27/11/2009 C. Cecchi - S. Germani* Università di PerugiaI.
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
CGEM-IT project and beam test program G. Felici for the FE-LNF-TO team Partially supported by the Italian Ministry of Foreign Affairs under the Program.
Concept of NA62 IRC based on PWO scintillation crystals A.Fedorov, M. Korjik, A. Lobko Institute for Nuclear Problems, Minsk, Belarus A. Kourilin JINR,
Calorimeters Design Issues and Simulation Needs C.Woody Physics Department Brookhaven National Lab EIC Simulation Workshop Oct 9, 2012.
PbWO 4 crystals Calorimeter Liping Gan University of North Carolina Wilmington.
David Hitlin Frascati SuperB Workshop March 16/17, 2006 An EMC for Super B  With the likely time structure of SuperB, backgrounds and radiation damage.
International Workshop on Linear Collider, Jeju, Korea, Ren-yuan Zhu, Caltech Aug. 27, Comments on Linear Collider Calorimetry Case for Precision.
Brett Fadem of Muhlenberg College for the PHENIX Collaboration.
PID detector and EMC for HIEPAF 邵明,唐泽波 核探测与核电子学国家重点实验室 中国科学技术大学近代物理系.
David Hitlin EMC R&D Meeting April 1, Responsibilities ItemResponsible institution/person LYSO crystal development, order optimization Forward EC.
PhD thesis: Simulation & Reconstruction for the PANDA Barrel DIRC Official name: Open charm analysis tools Supervisor: Prof. Klaus Peters Maria Patsyuk.
Ilhan TAPAN* and Fatma KOCAK
from Saint Gobain studies
Roberto Calabrese Ferrara University and INFN
The MiniBooNE Little Muon Counter Detector
Mu2e crystals qualification
The Electromagnetic Calorimetry of the PANDA Detector at FAIR
Update: EMC R&D David Hitlin SuperB R&D Meeting September 25, 2008.
Forward Tagger Simulations
Claudia Cecchi University of Perugia and INFN
superB Detector Workshop I University of Perugia and INFN
Workshop Goals for the Detector Groups
Summary/Conclusions of the SuperB PID Sessions.
SuperB EMC Computing Foreseen activities and software/computing needs
LSO Cal Geant4 Simulation
SVT Issues for the TDR What decisions must be taken before the TDR can be written? What is the mechanism for reaching those decisions How can missing information.
Jin Huang Los Alamos National Lab
CLAS12 Forward Detector Element PCAL
Scintillator HCAL: LOI issues
F.Forti, INFN and University, Pisa Paris, May
5th Super B Workshop Detector R&D Program – Plenary Session, May 9, 2007 – David W.G.S. Leith.
Comments on Dual Readout Calorimeter
Comments on Linear Collider Calorimetry Case for Precision ECAL?
Linear Collider Simulation Tools
LSO/LYSO Crystals for Future High Energy Physics Experiments
An alternative forward endcap calorimeter design
Tadashi Nomura (Kyoto U), KRare05 at Frascati, Italy
Mickey Chiu University of Illinois at Urbana-Champaign
Calorimeter Backgrounds
Dual readout calorimeter for CepC
Conceptual design and R&D Progress of STCF ECAL
Linear Collider Simulation Tools
General Introduction to IFR
The Effect of Filtering
Presentation transcript:

SuperB R&D Meeting David Hitlin February 14, 2008 EMC R&D for SuperB SuperB R&D Meeting David Hitlin February 14, 2008

David Hitlin SuperB R&D Meeting February 14, 2008 EMC R&D for SuperB With the likely time structure of SuperB, backgrounds and radiation damage to the EMC should be reduced from those at a 1036 conventional collider In the barrel region, rates and radiation dose should be tolerable The barrel EMC should be usable at SuperB In the endcap region, at least, there will be multi-Bhabhas within the decay/integration time of the CsI(Tl) as well as showers from off-energy electrons that (hopefully) hit the inner shielding The forward CsI(Tl) endcap crystals must be replaced with crystals having a faster scintillation light decay time that are more radiation hard There are good physics motivations to increase solid angle coverage with a rear endcap David Hitlin SuperB R&D Meeting February 14, 2008

Participating institutions (so far) Bergen Caltech Edinburgh McGill Perugia QMC (U of London) The effort aims at the R&D and design worked needed for the TDR There are a lot of interesting opportunities, for the front and rear endcaps, in the R&D phase and for the beam test David Hitlin SuperB R&D Meeting February 14, 2008

David Hitlin SuperB R&D Meeting February 14, 2008 EMC R&D for SuperB Forward endcap We need A crystal with a smaller Molière radius A crystal that is more radiation hard A crystal with a faster decay time Why not, you ask, use PbWO4? Because we need a crystal that produces more light than a lead brick We have an excellent candidate in LSO or LYSO, which is under active study by Ren-Yuan Zhu at Caltech (parallel session David Hitlin SuperB R&D Meeting February 14, 2008

Scintillating Crystals for HEP NaI(Tl) CsI(Tl) CsI BaF2 BGO PbWO4 LSO(Ce) GSO(Ce) Density (g/cm3) 3.67 4.51 4.89 7.13 8.3 7.40 6.71 Melting Point (ºC) 651 621 1280 1050 1123 2050 1950 Radiation Length (cm) 2.59 1.85 2.06 1.12 0.9 1.14 1.37 Molière Radius (cm) 4.8 3.5 3.4 2.3 2.0 2.37 Interaction Length (cm) 41.4 37.0 29.9 21.8 18 21 22 Refractive Index a 1.79 1.95 1.50 2.15 2.2 1.82 Hygroscopicity Yes Slight No Luminescence b (nm) (at peak) 410 560 420 310 300 220 480 440 Decay Time b (ns) 230 1300 35 6 630 50 10 42 60 Light Yield b,c (%) 100 45 5.6 2.7 13 0.1 0.6 75 30 d(LY)/dT b (%/ ºC) ~0 0.3 -0.6 -2 -1.6 -1.9 -0.3 -0.1 Experiment Crystal Ball CLEO BABAR Belle BES III KTeV, E787 TAPS (L*) (GEM) L3 BELLE PANDA? CMS ALICE (BTeV) SuperB? - David Hitlin SuperB R&D Meeting February 14, 2008

Photo-Luminescence-weighted Q.E. LSO / LYSO David Hitlin SuperB R&D Meeting February 14, 2008

David Hitlin SuperB R&D Meeting February 14, 2008 Forward endcap layout .36 m3 2520 crystals The CDR segmentation algorithm needs to be optimized We are discussing several designs and are close to an answer David Hitlin SuperB R&D Meeting February 14, 2008

LSO/LYSO is in mass production Saint-Gobain LYSO CTI: LSO CPI: LYSO David Hitlin SuperB R&D Meeting February 14, 2008

Sichuan Institute of Piezoelectric and Acousto-optic Technology (SIPAT) David Hitlin SuperB R&D Meeting February 14, 2008

David Hitlin SuperB R&D Meeting February 14, 2008 LYSO crystal R&D Crystals are expensive ($50/cc) at present, but we believe that the price can be brought down to ~$15/cc More work remains to be done on improving the crystal growth process Characterize trace impurities – improve radiation hardness Improve uniformity of cerium and yttrium doping in the Czochralski process Optimize crystal yield of a given size in a particular boule diameter Reduce phosphorescence ……… Further develop new supplier relationship David Hitlin SuperB R&D Meeting February 14, 2008

David Hitlin SuperB R&D Meeting February 14, 2008

5x5 Projective LYSO array with CsI(Tl) surround A 7x7 array is best, but it can be approximated by a 5x5 array surrounded by CsI(Tl) to catch the outer few percent of shower 16 spare BABAR CsI(Tl) crystals may be available CMS APD readout module 2 @ 5mmx5mm APD (10x10mm APDs are now available) David Hitlin SuperB R&D Meeting February 14, 2008

Beam test budget estimate (M&S) Item Unit cost ($) Cost (K$) LYSO Crystal @ $50/cc (for the test only) x24 6250 150 CMS type dual APD module 2 x Hamamatsu S6664-55 (x(24+16)) 250 10 Preamplifier/Shaper (x24+16) 200 8 DAQ system Source carriage 2 Beam test mounting structure 20 Total M&S (w 25% contingency) David Hitlin SuperB R&D Meeting February 14, 2008

Monte Carlo studies The Perugia group is developing a GEANT4 simulation to optimize the crystal dimensions, the wrapping, the mounting structure, etc. Initial studies have been presented Optimization is underway Stefano Germani David Hitlin SuperB R&D Meeting February 14, 2008

Dead Material comparison BABAR-like geometry (B.Aubert et al. Nucl.Instrum.Meth.A479:1-116,2002) : Each Crystal wrapped with 2 x 165 µm Tyvek 25 µm Al 13 µm Mylar Each module wrapped with 300 µm Carbon fiber CMS-like geometry (CMS EDR IV ) : Crystal inside Carbon Fiber matrix Inner wall thickness 400 µm Outer wall thickness 300 µm Crystal Carbon fiber clearance 100 µm Module Gap 100 µm Mylar C Fiber Al Tyvek Air Crystal Crystal 3x3 Module 3x3 Module Carbon Fiber Air Stefano Germani David Hitlin SuperB R&D Meeting February 14, 2008

Fit Function parameter P1 Edep mean and mpv Edep mean : Fit independent Most Probable Value: Fit Function parameter P1 Xtal - Xtal C-Fiber thickness: Inside Module : 400 µm Across Module: 600 µm Very small difference!!! Stefano Germani David Hitlin SuperB R&D Meeting February 14, 2008

Edep vs Projectivity Edep mpv Edep sigma Edep dist Preliminary Stefano Germani David Hitlin SuperB R&D Meeting February 14, 2008

Rear endcap acceptance studies Many of the main physics objectives of SuperB involve missing energy signatures Use of the recoil technique Excellent reconstruction efficiency for hadronic B decays, especially those involving D*s Excellent particle ID Hermeticity Improving backward calorimeter coverage can pay large dividends in signal/background Study using Btn benchmark BKGD/Signal with smearing Backward polar angle coverage (radians) M. Mazur David Hitlin SuperB R&D Meeting February 14, 2008

Rear endcap layout+real barrel extension David Hitlin SuperB R&D Meeting February 14, 2008

KLOE calorimeter technology David Hitlin SuperB R&D Meeting February 14, 2008

Readout technology is an issue David Hitlin SuperB R&D Meeting February 14, 2008

David Hitlin SuperB R&D Meeting February 14, 2008 Conclusions We have organized the nucleus of a group to do the R&D needed for the SuperB TDR: to design (and eventually) build an upgraded EMC for SuperB We have focused initial effort around a LYSO beam test of a projective array of size adequate to understand in detail shower response and containment Very little effort thus far on the rear endcap calorimeter There are EMC R&D meetings approximately every two weeks on Wednesday at 8:30AM PST/5:30PM ECT There are a lot of interesting issues still to be addressed, and lots of opportunities to contribute More details will be presented in the parallel sessions David Hitlin SuperB R&D Meeting February 14, 2008