LHC progress Week 30 summary 30th July 2012

Slides:



Advertisements
Similar presentations
Friday, h10: Stable beams at 1.38 TeV. 09h03: Beam dump.  One bunch dropped too much in intensity and gave BPMS interlock (dump protection). 10h36:
Advertisements

MD#2 News & Plan Tue – Wed (19. – 20.6.) DayTimeMDEiCMP Tue06: GeV  4 TeV: Ramp for chromaticity - missed A 08:00Ramp down 10: GeV: Large.
5/11/2012LHC 8:30 meeting Summary of Week 44 Coordination: Mike Lamont & Jan Uythoven.
LHC progress Sunday 3rd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Tuesday 24 th July - morning 10:15 Operator dump of fill 2873  Initial luminosity: 5.83e33 cm-2s-1  12 hours stable beams  151 pb-1 delivered  Initial.
Tuesday 7 th August - morning 07:10 Reinjection after loss of fill 2920 to UFO near ALICE  26 pb -1 in 1h16m; peak lumi 6.4e33 cm -2 s -1 08:10 dump at.
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Summary of week 40 Machine Coordinators: G. Arduini, M. Lamont
Last 24 hours RQ4.L1 Lost going into collision Test ramp Storm
Machine Coordinators: G. Arduini, J. Wenninger
Friday 15th June 01:11 Injection.
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Luminosity lifetime – fill 2932
Summary Friday h38: Ramp down and pre-cycle.
MD Report 24 June 2012 Machine coordinators: Barbara Holzer, Mike Lamont MD Coordinators: Ralph Assmann, Giulia Papotti, Frank Zimmermann MD#2 News & Plan.
Wed :55 Fill 2653 stable beams 1.40e11 ppb, cm-2s-1peak lumi, 11.6 pb-1 total lumi delivered. 09:31 Dumped by collimator interlock:
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
LHC summary week 32 Coordination: Mike Lamont & Jan Uythoven
Week 32 Started with luminosity production…
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Coordination: G. Arduini, E.B. Holzer
LHC Morning Meeting - G. Arduini
Weekend: Sat 11th – Mon 13th Reasonably smooth running Saturday:
Main aims: LHCb polarity switch, Luminosity production
Coordination: Gianluigi Arduini & Jan Uythoven
LHC Morning Meeting - G. Arduini
Summary of week 22 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
Summary of Week 16 G. Arduini, J. Wenninger
Lost at 12:05 to power converter (RTQX2.R1) problem
Note: squeeze in Atlas, CMS, LHCb and Alice on going
Mon 22/8 – Tue 23/8 00:07 stable beams #2040. Initial luminosities: 2.1x1033 cm-2s-1 18:00 Programmed dump. End of physics #2040. ~83 pb-1 in ~18 hours.
Coordination by E. B. Holzer & J. Wenninger Production
Summary week 29 VdM scans Luminosity production
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
Chromaticity can make a difference…
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Friday morning 10:30 Optics measurements and corrections.
Yesterday’s morning’s controls issues
Sunday
Wednesday 9:08 Fill 3214 dumped by OP after 5:26 hours in stable beams
Saturday 7th May Sat – Sun night
Summary Thursday h21: Stable beams fill #1303.
Sunday/Monday & :30 Stable beams. Fill #1851.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Aims for the week Recover from technical stop and precycle at 10A/s
Monday 24 October hours of 25ns MD
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Saturday 3rd November - morning
Thursday 26th July 13:21 Fill 2880 beam dumped
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Saturday :42 stable beams fill 3541
Polarity inversion 07:00 ALICE solenoid and dipole polarity switched to positive External Crossing angle polarity unchanged at injection/ramp & squeeze.
LHC Morning Meeting - G. Arduini
Sat 18/3 - Ramp to 4 TeV Again glitch on the safe beam flag for beam 2. Cause identified: noise on BCT2B giving values above the safe beam limit (2.4×1010.
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Summary Tuesday h23: Machine closed. Precycle started.
Wednesday 23/2 Thanks CRYO!!!.
Mon 2/4 08:00-13:00: Access for: Experiments Power converters BBQ
Coordination: Eva Barbara Holzer, Mike Lamont
Wednesday h18: 228b fill lost just before start of ramp.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Another Immortal Fill….
Saturday 15th May One bunch 1 e11 per beam 09:57: start ramp
Tuesday
Presentation transcript:

LHC progress Week 30 summary 30th July 2012 Coordination: Mike Lamont & Bernard Holzer

Overview 30-07-2012 LHC progress

Week 30 Fill End Stable Peak Int fb-1 Dump 2872 Mon 10:20 15h5m 5.58 166 OP 2873 Tues 10:15 12h0m 5.83 151 2875 Wed 09:10 15h24m 5.72 172 2880 Thu 13:21 9h17m 5.49 118 Triplet R1 – QPS SEU (tbc) 2882 Thu 21:50 30m 5.7 9 Trip of LHC dipole 2883 Fri 01:50 4m 2.6 0.3 Beam loss B1 2884 Fri 14:11 9h40m 5.42 119 2886 Sat 03:00 3h43m 5.65 61 Collimation communication 2887 Sat 10:30 4h47m 5.88 76 Network controller – point 5 collimators – access system 2888 Sun 08:30 15h48m 6.08 182 2891 Mon 00:23 6h9m 6.13 98 Spurious switch opening RQF.A12 2892 Ongoing 6.17 30-07-2012 LHC progress

Luminosity 30-07-2012 LHC progress

30-07-2012 LHC progress

30-07-2012 LHC progress

Brightness LHC progress 30-07-2012

Timeouts Monday 11:15 Access for fire brigade ... electrical problem in water cooling pump 18:40 restart Tuesday ADT gain calibration at 450 GeV Wednesday AM Morning: switch LHCb polarity and test ramp 14:00 access - various 16:00 restart, precycle ... trip of RQ10.R8 (converter fault) Restart 20:25 Thursday Access for cryogenics valve at D4L5 on the DSL line for the main circuits of S45 (in shadow of triplet recovery) Injection optimization by Chiara and Wolfgang Friday 15:30 h=9 low emittance beam test 16:00 beam dump due to open access door 20:00 controls problem in PS 21:00 back to standard physics fill Saturday 10:06 beam dump: loss of network communication, access needed to reset switch 15:20 injection for physics Sunday Test ramps for chromaticity 30-07-2012 LHC progress

Instabilities, beam loss etc. 30-07-2012 LHC progress

2883 – early Friday morning Tune Shift 100 Hz 100 Hz Activity kicks off on beam 1 – end of squeeze Sustained beam loss both beams – finally dumping on collimator temperature interlock QH B1 low – on or near 100 Hz LHC progress 30-07-2012

Associated beam size increase Federico Roncarolo LHC progress 30-07-2012

2859 – end squeeze Stepping back a little over a week… 30-07-2012 LHC progress

2860 – collision beam process Instability B1H – losses on B2 Faster (~ 25 s) 30-07-2012 LHC progress

2862 – collision beam process Similar… Instability B2H & B1H Haven’t seen this since 30-07-2012 LHC progress

2866 – B2H end squeeze 100 Hz 30-07-2012 LHC progress

2867 – B2H end squeeze 100 Hz Now taking a lot of care not to put the tune on 0.3068 (3450 Hz) 30-07-2012 LHC progress

Tunes@ injection&ramp 0.28 = 3149 Hz Up to now take a lot of care to keep horizontal tunes on this value (QFB) Yesterday moved QHB2 to 0.282 at injection & ramp… Sample size = 2: Reduced losses at end ramp (perhaps) Not reflected in BSRT fast scan… 30-07-2012 LHC progress

2891 – end ramp 30-07-2012 LHC progress

BSRT beam 1 30-07-2012 LHC progress

BSRT Beam 2 30-07-2012 LHC progress

Beam sizes before/after TS B2 H and V seems to have changed, even though the BSRT meas. are biased by a larger noise Federico Roncarolo LHC progress 30-07-2012

50 Hz Not instrumentation – not there without beam – seen in all 3 BBQ Horizontal plane – both beams Limited number of sources – narrow line, no sidebands Probably dipole field, don’t see it on the tune… 30-07-2012 LHC progress

RB.A34 ALICE SOLENOID Plus a few others 30-07-2012 LHC progress

Summary Ramp, squeeze and collide looking smoother As always if there are losses, it’s B2 Usual lifetime dip at the moment of collisions B2 down to 1 hour, 5-6% beam loss – tunes? Emittances from luminosity look a little large B2 between 450 GeV and collisions? Chromaticity measurement to be analyzed 30-07-2012 LHC progress

Q’H B1 30-07-2012 LHC progress

Changes Longitudinal blow-up Transverse feedback Programmed bunch length increased from 1.2 to 1.3 ns Transverse feedback Gain calibration B2H gain reduced during squeeze by 25% Injection and ramp B2H tune to 0.282 LHCb polarity Injection sequence modification for Alice 30-07-2012 LHC progress

OF NOTE 30-07-2012 LHC progress

Summary of the ADT Gain renormalization The calibration constants which were used in the system until today date from 2010. As the tetrodes in the power amplifiers are ageing and being replaced, and the Beam Position Readings change with the beam intensity settings variations have occurred since. Since the last technical stop in June 2012 all power systems are populated with new tubes and back to nominal power gain. From the measurements we have programmed new calibration factors today: HB1 old 9213 new 10000 VB1 old 8804 new 9199 HB2 old 11466 new 7942 VB2 old 6197 new 5167 The effective gain of the Horizontal Beam 2 system was therefore lowered by 31% and it should be now consistent again with the "normalized gain" knob. Wolfgang Hofle, Daniel Valuch LHC progress 30-07-2012

RF phase noise – CCC diagnostic Plus accompanying tutorial Thanks to Fabian Follin, Michael Jaussi, Themistoklis Mastoridis 30-07-2012 LHC progress

32 bunch h=9 test Attempt dogged by unrelated problems But previous emittances of 1 micron with 1.2e11 ppb on flat top of SPS could not be re-established Indications that problem also effects nominal 50 ns beam PS/TT10 matching a suspect (Karel) Might also been there already at injection in PS Could explain decreased brightness 30-07-2012 LHC progress

Incoming Gianluigi & Barbara VIP this afternoon – dump beams ~14:30.. Octupoles… h=9 30-07-2012 LHC progress

30-07-2012 LHC progress

In our midst… We have a multi-talented, intelligent, good natured, humble, hard working physicist. Over the years he has made a profound contribution to the success of the LHC and many other projects. He has nurtured a generation of students, fellows and young physicists with good humour and empathy. As a founding member of the LHC coordination team he’s been in the thick of over the last few years and it’s been a real pleasure working with him.. 30-07-2012 LHC progress

This man is… 30-07-2012 LHC progress

30-07-2012 LHC progress