CENF – Civil Engineering Extension B887 CERN: An accelerator complex unique in the world -Prevessin site complex- -EHN1 Extension Area- EHN1 Extension.
Industry information day INDUSTRY INFORMATION DAY Assembly & Installation Laurent Schmieder Buildings Infrastructure and Power Supplies Project.
PEP-II Ramp Down to a Minimum Maintenance State J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007.
MICE: Hall Infrastructure Chris Nelson CEng CM16 8 th Oct 2006.
Jo Beth Folger FAC - CF Breakout – Sector April 8, Sector 20 Project Overview Sector 20 Site Plan Description Schedule.
Bob Law FAC Oct 24, Sector 20 Project Overview Sector 20 Site Plan Description Organizational Chart Schedule Cost.
1 FUTURE EXPLOITATION OF THE EAST AREA Infrastructure and Equipment - Civil Engineering issues. Jonathan Carr – GS / SE.
HLTC 15 th April 2014 EDMS: Y. Muttoni EN-MEF-INT with the contribution of P. Fessia.
Luisa Ulrici and Luca Bruno, on behalf of DGS/RP
Cristiana Colloca GS/SEM – ATOP – MARCH 2009 Infrastructure Consolidation of Accelerators Injectors (civil engineering) Cristiana Colloca GS/SEM – ATOP.
PH-DT Infrastructure Investments M.Capeans SPOB meeting CERN, 20/3/14.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
SR1 ongoing workH.Pernegger21/2/02 Ongoing work in SR1 and preparations for detector macro assembly Heinz Pernegger.
Machine Advisory Committee Review APS Upgrade Installation Plan and Schedule John Noonan November 15, 2006.
LS1 Injectors K. Foraz on behalf of N. Gilbert, S. Mataguez, D. Hay & D. McFarlane LSC 24 th May /05/2013LSC – EN-MEF-OSS1.
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
LHC Insertions Upgrade Working Group (LIUWG) Space available in tunnel Y. Muttoni.
Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling.
Budget specification EHN1 Extension: Infrastructure (WG2) Mats Wilhelmsson 17 September 2015.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Consolidation Project Vincent Doré IT Technical.
Update on the Laser Beam Line
Radioactive Magnet Facility B /09/2014 TE-MSC-LMF Luis Mora Vallejo Rosario Principe TE-MSC Technical meeting, 4 th September 2014.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
Cooling & Ventilation feed-back M. Nonis – EN/CV.
LS1preparation & planning status A L Perrot on the behalf of EN/MEF R2E project meeting 11 th May 2012 EN.
Functional/Budget specification EHN1 Extension: Infrastructure (WG2) Mats Wilhelmsson EN/MEF 4 November 2015.
CENF – Civil Engineering Extension B887 Status – 18 September 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
Engineering Department EN 1 IT3853-EN Design, Supply of Ventilation Units and Smoke Extraction Systems for Building 192 Bidder’s conference – 29 th April.
Extraction and beamline progress B.Goddard TE/ABT.
Integration and Installation Status for Collaboration Meeting Ans Pardons, 29/9/2015.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/21.
Vault Reconfiguration IT DMM January 23 rd 2002 Tony Cass —
EHN1 – EN/EL Progress update J. Devine G. Gross 11/02/16.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
HIE-ISOLDE Project 3 rd beam line + HELIOS June 16th 2015 (updated on June 18th) Y. Kadi, S. Maridor.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
R2E relocation & shielding activities: status report Anne Laure Perrot EN/MEF- LE On behalf of the R2E coordination team LS1 Committee – meeting #48, 27.
HIE-ISOLDE Workshop: The Technical Aspects Target Area Infrastructure Ventilation 29 November 2013 Andrea Polato* - CERN EN-CV-PJ * The research project.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/02/04.
Update on the PSB Cooling and Ventilation Systems
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
SMB Department LS2 period main activities Luigi Scibile (SMB-SE) on behalf of SMB
Linac4-PSB 160 MeV connection readiness review
Cabling for LHCb Upgrade
CLIC Civil Engineering Update
SR1 extension follow up Extract and update of “Minutes of the keep-up meeting for SR1” sent on 27/02/ results from the visits and new requirements.
Equipment simplified model SMR UR safety
EHN1 Extension planning
ELENA installation and commissioning status
UK Financial Plan & Risks
Proposed New CMS Conference Room on first floor of SHL
Budget specification EHN1 Extension: Infrastructure (WG2)
CE Status: Activities executed until 03/08 and ongoing
Special LS1 day on 12 June 2012, EDMS:
LHC Civil Engineering Activities for YETS – LS2
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
RWTCS Steering Commitee
B245 Modifications & Cabling Update
B. 163 facility upgrade: work space options in B. 163 and B. 103 F
Radioactive Waste and Material Storage in the Frame of LS2
East Hall under construction
East Hall under construction
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 20/02/2019.
East Hall under construction
LINAC 3 Meeting ICL machines Injectors
Polarized 3He target installation
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

RWTCS Steering Commitee Technical work packages STATUS & UPDATES Organisation, Planning & Budget vs. Baseline C. Colloca November 2017

INFRASTRUCTURE WORK WORK PACKAGES WORK PACKAGE OWNER WORK PACKAGE TEAM Civil engineering & building work C. Colloca SMB/SE L. Maricalva, R. Ortega SMB/SE Electricity J. Gomez SMB/SE F. Vincent SMB/SE HVAC G. Rouge SMB/SE Cranes & handling/lifting equipment H. Lourenco EN/HE S. Fumey EN/HE IT networks L. Borakiewicz IT/CS Access control R. Nunes BE/ICS N. Rama BE/ICS Fire detection D. Raffourt BE/ICS November 2017

FINISHED WORK (JUNE - NOV 17) - Crane support extension ISR4 - Cranes feeding & anticollision system - New metallic doors (bldg. 184) - ISR8L plateform - Underground galleries waterproofing (ISR2-3-5-6-7-8) - Ceiling, corbels, walls painting (ISR5-6) - Electricity (ISR5-6) - Fire detection (ISR5-6) - Local urgent slab repairs November 2017

On going/starting WORK - Fire doors (ISR3, ISR4, ISR5, ISR6, ISR7) - External barrack installation - New meeting room & changing rooms (bldg. 184) - New sanitary block (bldg. 184) - Electricity (ISR4, bldg. 184) - Resin samples (ISR3, ISR5) - Floor sealing holes (ISR5, ISR7L) November 2017

On going/starting STUDIES - HVAC : IT preparation - Infrastructure supports for HVAC : study - Replacement of metallic stairs (ISR2, ISR4, ISR8) : DO preparation - BLDG 573, 574, 225: budget & planning on going November 2017

CONDITIONAL PERIODS OF AVAILABILITY o n - g o i n g S2 2022 S2 2018 S1 2017 S1 2022 S2 2016 S1 2021 S2 2015 S1 2020 ISR 2 ISR 3L ISR 6L ISR 3R ISR 5R ISR 5L ISR 6R ISR 7R ISR 7L Storage of LS2 rad. Waste. Move of - tritiated water to B.573 - Magnets >8t to ISR 5. - Comb. RW to B.225 Treatment by cont.enclosure by S1 2019. Elimination of cables and combustible RW. Move of residual combustible RW to B.225 Storage of not-stackable RW (pallets). No floor access (shielded areas for highly rad. waste). Elimination of LEP RF Cavities, Pb vacuum chambers and asbestos RW. Dismantling of old shielded area. Floor available in ¼ octant HSE-RP B.573 refurb. by S2 2017 Containment enclosure by S2 2018 B.225 refurb. by S1 2018 Evaporation in B.573 by end of S2 2017 B.225 refurb. with sprinkler by S1 2018 (to be discussed). Keep storage racks in place. Floor waterpr. compatible with the existing sh. area. Floor waterproofing before sh. area extension Asbestos facility avail. By S1 2018 Civil eng. work and HVAC possible before S2 2022. Partial waterprof. in S1 2018. Elec., fire det., access ctrl, waterproof. & painting in S1 & S2 2022 (per ½ sector) Waterpr. partially possible after ISR6 sh. extension. Elec., IT & painting ongoing. HVAC in 2018 All other work in 2017 Civil eng. work and HVAC possible before S2 2018. Elec., fire det., access ctrl, waterproof. & painting in S2 2018 Civil eng. work possible in 2017. HVAC 2018. Elec., fire det., access ctrl, waterpr.& painting ? POSSIBILITY WITH RACKS IN PLACE TO BE VERIFIED Floor waterpr. and all remaining work possible in 2017 HVAC in 2018 Civil eng. work possible in 2017. HVAC 2018. Elec., fire det., access ctrl, waterproof. & painting in S1 2020. INFRASTR. November 2017

PLANNING 1/2 November 2017

PLANNING 2/2 November 2017

(FOR TUNNEL WORK ONLY – NO SECURITY) SPENDING PROFILE EXPENDITURES (FOR TUNNEL WORK ONLY – NO SECURITY) 2017 2018 2019 2020 2021 2022 2023 GLOBAL BUDGET* (kCHF) 1’270 1’370 1’750 200 240 400 40 TOTAL 5’270 COMMITTED : 1’600 kCHF SPENT : 1’270kCHF *Without ‘Access control’, ‘Human resources’ November 2017

UPGRADE/CHANGE OF DESTINATION BLDG. 573, 522 AND 574 UPGRADE/CHANGE OF DESTINATION BLDG. 225 BLDG. 573 BLDG. 574 GLOBAL BUDGET* (kCHF) 280 325 215 *These estimates take into account: Building work Electricity HVAC IT Fire detection They do not take into account fire compartments, sprinklers or smoking extraction systems (risk analysis on going for bldg 225) Planning on going Current estimated duration : 2 years from the IPP approval (if the new bldg. close to bldg. 184 is ‘postponed’) November 2017

Duration : 2 years from the start of design HSE/RP CONTROL BLDG Budget : 800 kCHF Duration : 2 years from the start of design Constraints : one of ISR4 access condemned + parking reduction November 2017

THANK YOU FOR THE ATTENTION! November 2017