HPC on a collective journey in 1D-6D

Slides:



Advertisements
Similar presentations
Info Requirement Model OPERATIONSPLANNINGDESIGNCONSTRUCTION ESDACESDACESDACESDAC = MUST HAVE FOREWARD PASS BACKWARD PASS = NICE TO HAVE (If.
Advertisements

Info Requirement Model OPERATIONSPLANNINGDESIGNCONSTRUCTION ESDACESDACESDACESDAC = MUST HAVE FOREWARD PASS BACKWARD PASS = NICE TO HAVE (If.
Building Information Management (BIM)
Multimedia Specification Design and Production 2013 / Semester 1 / week 7 Lecturer: Dr. Nikos Gazepidis
PERFORMANCE FOR ALL The Project & the System. A HE project co-ordinated by University of Bristol, open to HE internationally. Developing the requirements.
Material Management. Materials should be ordered early –Minimize risk of price inflation, lack of materials –Just in time delivery minimizes space required.
The BIM Concept Drawings, building views, visualizations, calculations and quantity take-offs are automatically derived from the 3D model. BIM= Building.
© AJC /18 Extended Matching Sets Questions for Numeracy Assessments: A Case Study Alan J. Cann Department of Microbiology & Immunology University.
Brand Positioning for Academic Libraries Yoo-Seong Song University of Illinois at Urbana- Champaign.
Integrating Management Tools with the Project Management Process Working Group 3.
THE CHALLENGE TO PROVIDE EDUCATION TO THE CONSTRUCTION INDUSTRY IN A RAPIDLY CHANGING ENVIRONMENT 1 April 2010.
The impact of BIM: An Architect’s Perspective. About Stride Treglown Formed in th largest practice in the UK 76th largest practice in the world.
© 2010 Colt Telecom Group Limited. All rights reserved. Next Generation Data Centre Design Akber Jaffer 2.
Introduction to BIM BIM Curriculum 01.
Information Delivery Manuals: Building Information Modelling
Information Systems Security Computer System Life Cycle Security.
COINE Cultural Objects in Networked Environments.
Topic (1)Software Engineering (601321)1 Introduction Complex and large SW. SW crises Expensive HW. Custom SW. Batch execution.
Benjamin Welle Stanford University Grant Soremekun Phoenix Integration
TeamCluster Project Real time project management solutions Harry Hvostov April 27, 2002.
© 2012 xtUML.org Bill Chown – Mentor Graphics Model Driven Engineering.
© 2001 Change Function Ltd USER ACCEPTANCE TESTING Is user acceptance testing of technology and / or processes a task within the project? If ‘Yes’: Will.
CRESCENDO CRESCENDO Philippe HOMSI Paul WEBSTER
“Making the Right Business Case for PLM in Supply Chains” Mark Frohlich Associate Professor of Operations and Supply Chain Management
Presented To: Dr. Dina Rateb MOIS 549 Class Presented By: Karim Aguib.
Toulouse, September 2003 Page 1 JOURNEE ALTARICA Airbus ESACS  ISAAC.
Overview of Building Information Modeling What does it mean for Civil Engineering?
Real Time Collaboration and Sharing
1 SAS ‘04 Reducing Software Security Risk through an Integrated Approach David P. Gilliam and John D. Powell.
Virtual Building Solutions Better Buildings. Better Built. BIM Marketing.
June 2007Office of Federal Environmental Executive Symposium a data standard for use with construction specifications Bill Brodt Facilities Engineering.
© 2009 Bentley Systems, Incorporated Intermediate Status Dec 8, 2009 FM Handover Aquarium (COBie2)
Process of the analogue Construction Element Specification - today CE specification CE specification CE specification CE specification CE specification.
Fedora Commons Overview and Background Sandy Payette, Executive Director UK Fedora Training London January 22-23, 2009.
Get Data to Computation eudat.eu/b2stage B2STAGE How to shift large amounts of data Version 4 February 2016 This work is licensed under the.
Guidelines of Business Process Modeling Team: Alejandra Saavedra Andrea Rodriguez Ez Lawrence.
“Supply Chain Management Handbook” Supplier Selection and Capability Assessment Model IAQG Leader: Christian Buck – Safran Updated: June 2008.
4D Simulation Impacts on Construction Management
E.g. Bhurj Khalifa Tower Hotel, Abu Dhabi
2nd GEO Data Providers workshop (20-21 April 2017, Florence, Italy)
DESIGN TOOLS UPDATE.
BIM EXECUTION PLANNING PROCESS
Usage scenarios, User Interface & tools
AFIS MBSE Working Groups
EXTRA SLIDES.
AIM Operational Concept
UK Link Programme Update to PNUNC August 13th, 2013
Project Execution Planning for Building Information Modeling
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
2013 COBie Challenge for Facility Managers
Why we need an honest assessment culture and how to create one.
Digital Transformation AGC Glass Products in BIM and Building Façade
Copyright Scott Bloss, All rights reserved.
Lloyd Pickering, BIM Team Leader John Adams, Product Manager
There are many Aspects to Business Change - it’s not just the Technology Strategy Product Technology People Process Structure Culture.
Standards for success in city IT and construction projects
ENTERPRISE BUSINESS SYSTEMS
Sonata Accelerated Upgrade Assessment
MEP CoordinationMEP Coordination and Clash Detection is Extremely Significant for BIM-Know Why.
AFNeT Standardization Days 2018
BIM EXECUTION PLANNING PROCESS
NDA Draft Strategy.
Digital Transformation Asia 2018 – CALL FOR SPEAKERS
Mirko Rakigjija, PE (256) Dr. Michael E. Stovall, PE (256)
Your Facility Your Information
WIS Strategy – WIS 2.0 Submitted by: Matteo Dell’Acqua(CBS) (Doc 5b)
Cluster Knowledge Integration and Dissemination
There are many Aspects to Business Change - it’s not just the Technology Strategy Product Technology People Process Structure Culture.
Digital Construction Engineering in Class – A collaborative approach
Requirements and Objectives for holistic PLM
Presentation transcript:

HPC on a collective journey in 1D-6D BIM-UK “ramp” Configuration Management Complexity at various scales License Conditions Design Require-ments Facility Config Info Physical Config 6D 5D + Lifecycle information management 5D 4D + Quantities + Costs 4D 3D + time 3D Space geometry 2D Plan drawings P&IDs 1D Values 2014-12-02 Not Protectively Marked Boost Industrie 2014 – La transition numérique, une chance pour la filière nucléaire française

Progressive data handover Data centric & 3D as-built driven by the Operators … backwards to Design Progressive data handover Checking quality G.I.S. 2014-12-02 Not Protectively Marked Boost Industrie 2014 – La transition numérique, une chance pour la filière nucléaire française

{ 4D to Get ready Anticipate in virtual world Optimise the real work with partners, before impacts cost too much on site { Efficiency in real world: “Optimised build” Virtual phase: “Simulate the real work, from simple to complex” Site wide Inside buildings Rebar level (when complex) 2014-12-02 Not Protectively Marked Boost Industrie 2014 – La transition numérique, une chance pour la filière nucléaire française

Digital transition … rules to be applied by all Assess your actions As Provider Expected as User 2014-12-02 Not Protectively Marked Boost Industrie 2014 – La transition numérique, une chance pour la filière nucléaire française

Challenges = topics of interest Transition to object centric and data centric Method of work in place are currently too ”rendering” oriented Cultural change Object Centric, taking into account the various phases Design to decommission Reusability Increase use of 3D modelling, towards 1D-6D model Full lifecycle perspective (PLM) Formalisation of processes, formalising data behind rendering From end use perspective, all cycle Also for contractors, suppliers Downstream processes use of data Operation and Construction Level of structuration of information Structure; formal links; digital forms Deliver most structured info at each step; including as-built data Avoid regression in numeric info flow Interoperability of tools, avoiding obsolescence Working in data centric world (e.g. validation) Standards, Dictionary, Data modelling Data centric approach 2014-12-02 Not Protectively Marked Boost Industrie 2014 – La transition numérique, une chance pour la filière nucléaire française