WPs concerned by L4 connection:

Slides:



Advertisements
Similar presentations
IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
Advertisements

BI Outlook for BI Day 2012 Based on latest (last Monday) feedback from EN/EL XXX As foreseen originally Partially ‘As foreseen originally‘ Postponed.
Status of the BI Work Package in the LIU-PSB frame Jocelyn TAN, BE-BI Thanks to the contributions of the WU holders: J. Belleman, P. Odier, F. Roncarolo,
LIU-IONS Linac3 meeting LIU Project – Planning and Installation Julie Coupard EN/MEF-OSS.
Status Report of the PSB Half-Sector and Stripping Foil Test in L4T
Technology Department 1 Stripping Foil and instrumentation R. Noulibos - W. Weterings – Pieter Van Trappen Technical meeting 21-mai-2014 L4 – PSB - Injection.
17 july 2008 Inner Triplets upgrade – 2013 Very first Schedule.
New injection region 1L1 Engineering Change Request PSB-L-EC-0001 EDMS Wim Weterings PLI Meeting Wednesday 14 th January 2015.
9 th AWAKE Technical Board 11 March Actions from Last Technical Board WP laser and MPP: decide until March 2015 which compressor design will be.
The Stripping Foil Test Stand in the Linac4 Transfer Line
THE LHC INJECTORS UPGRADE PROJECT - Organisation Malika Meddahi for Roland Garoby and the LIU Project Team.
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
Beam Instruments PSB + Transfer Lines B. Mikulec, J-F. Comblin.
ABT LIU Project Review 2015 BI.KSW: Magnet November 20 th 2015 L. Feliciano TE/ABT.
Status of the BI Work Package in the LIU-PSB frame Jocelyn TAN, BE-BI Thanks to the contributions of the WU holders: J. Belleman, P. Odier, F. Roncarolo,
Overview Consolidation projects for PS LIU-PS Main observable review Conclusion Acknowledgements S. Gilardoni R. Steerenberg G. Metral H. Damerau BI colleagues.
2. Linac Systems 3. Booster Systems 4. Installation commiss. 5. Building, Infrastruct. 2.1 Ion Source and LEBT, R. Scrivens, BE/ABP 2.2 Radio Frequency.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
L4 BCC – 1 Sep 2011 F. Roncarolo, U. Raich L.Soby, J.Tan, C.Zamantzas, F. Lenardon, C.Vuitton, G-J.Focker.
INJECTORS BLM SYSTEM: PROGRESS REPORT Christos Zamantzas on behalf of the BLM team. MSWG 28/08/2015.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
A new RF system for the PSB. LIU-PSB Working Group Meeting, 10th December 2015 M. Paoluzzi December 10 th Wide working group involved including.
LIU-PSB Overview K. Hanke for the LIU-PSB Working Group K. Hanke, LIU-2011, 25 Nov 2011.
LIU EL-FC ACTIVITIES Georgi Minchev Georgiev EN-EL-FC EDMS
Status of the BI Work Package in the LIU-PSB frame Jocelyn TAN, BE-BI Thanks to the contributions of the WU holders: J. Belleman, P. Odier, F. Roncarolo,
Reminder of upcoming milestones For all machines: Nov. 2012:Table of performance parameters Jan. 2013: Baseline activities defined Feb. 2013: Update APT/EVM.
BA6 newsRF power Cable list being worked out. BA6 newsLLRF Cable list done, pending check and confirmation.
PS-LIU status S. Gilardoni – BE/ABP H. Damerau – BE/RF LIU-PT 27 Aug
PSB HW Commissioning Meeting 8 February 2016 A. Akroh, B. Mikulec.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
ELENA installation progress F. Butin / ELENA collaboration.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Wim Weterings Remy Noulibos
Hardware Commissioning Review BDI Equipment
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
Status of the BI Work Package in the LIU-PSB frame
Linac4-PSB 160 MeV connection readiness review
LIU – EVM status and next steps
Update on the Critical Path of the PS Booster Schedule for the EYETS
J.-L. Sanchez Alvarez(PSB-EIC)
LINAC4 ADVISORY COMMITTEE
Equipment simplified model SMR UR safety
EYETS David Hay EN-OSS.
ELENA installation and commissioning status
LIU / HL-LHC Cost and Schedule Review
LIU – EVM status and next steps
Injectors BLM system: PS Ring installation at EYETS
LIU–PLI report LIU PSB meeting.
ELENA Beam Transfer Workpackage
EC Activities Status for the LIU
LIU-PSB Status and Outlook
BE-BI Software for LINAC4
LIU–PLI report LIU SPS meeting.
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Status of the BI Work Package in the LIU-PSB frame
PS Booster Hardware Tests & Cold Check-out planning 16th of March 2017
TE/EPC activities for LINAC 2, PSB, PS & TT2 during EYETS
ELENA electron cooler and SEM grids status
SPS Planning for the EYETS Meeting 8 (07/12/2016)
YETS PS + PS SWY + TT2 Facility Coordinator:
EN-HE L2 – PS – PSB – TT2 works during YETS
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
PS Booster Report from: David HAY, Cyrille BEDEL 12-Jan-2018
Vers PS YETS PS Booster David HAY & Cyrille BEDEL.
PSB magnetic cycle 160 MeV to 2 GeV
East Hall under construction
Status of the BI Work Package in the LIU-PSB frame
SPS Injection BIS - Draft requirements
Linac4 Connection Broken Line 07/08/19
LIU EL-FC ACTIVITIES Updated on 28/11/2017
Presentation transcript:

WPs concerned by L4 connection: ABT equipment – W. Weterings Power – S. Pittet Beam Instrumentation – J. Tan Injection dumps – D. Grenier Vacuum – J. Hansen Cabling – S. Bertolasi, G. Minchev, J. Pierlot Rack Space – D. Hay Interlocks – B. Puccio Transport – C. Bertone Survey – T. Dobers Magnets – A. Newborough Applications – J.L. Sanchez-Alvarez CO, timings – J. Betz LLRF, TFB – A. Findlay, A. Blas C&V – S. Moccia RP: R. Froeschl

WP Action Power S. Pittet: Start crash program to advance procurement of injection power supplies (in progress; status?) Re-baselining (OK) Interlocks B. Puccio: Submit the DICs for the interlock system B. Mikulec: Clarify the needs for WIC in the PSB Survey T. Dobers: Report on the progress and present a planning for the YETS to exchange the jacks for BHZ162 and BHZ11 (21.05.2015) Technical Coordination D. Hay: Rack-lay out for BRF2 and BAT (defined); now the room needs to be cleared out and prepared; follow-up needed D. Hay: Define the rack lay-out for the interlock system (21.05.2015) Integration B. Mikulec, B. Riffaud: Review the integration of the BI.SMV position measurement plates A. Kosmicki + D. Parchet: Provide integration of new racks including supporting structures, cooling and ventilation equipment and switchboards for BRF2 and BAT. J-M. Lacroix: Provide a solution for the conflicts in the BI.SMV10 region and the BI.BVT10 entering angles with M. Hourican and C. Bracco.

WP Action LLRF, TFB A. Blas: Report status of RF bypasses and TFB Electrical Systems G. Minchev: follow up cable identification and decabling during the YETS/EYETS CV S. Moccia: Review needs, give status report, re-baseline CO, timings J. Betz: Review all needs and give status report Applications J.L. Sanchez Alvarez: Provide inventory and specs for the applications; organise sw development Vacuum J. Hansen: Follow-up of progress for fabrication and test of vacuum chambers (in particular vacuum chambers for BHZ11 and BHZ161)

WP Action BI J. Tan: Investigate which projects are to be delayed in favour of having the SEM grid for injection matching ready in 2017. Start a crash program. J. Tan, F. Roncarolo: Investigate the possibility for a PPM device, in case the installation is done during YETS 2017/2018. A decision on spare grids has to be taken once cost of final design are clear. J. Tan: Make sure that the SRR and ECR to reserve space for SEM Grids for turn-by-turn measurements in ring 3 are submitted. J. Tan, C. Zamantzas: Make sure that the ECR for BLM for the PSB and transfer lines is submitted. The ECR should include FLAT ionization chambers and ionization chambers to replace ACEMs and fast diamond BLMs J. Tan, J. Belleman: Make sure that the DIC, SRR and ECR to reserve space for the wide band BPM in the BTP line are submitted. J. Tan, F. Roncarolo: Prepare a document for approval about the specifications for the H0/H- current monitor electronics. J. Tan, J. Borburgh: Check the need to order spares for the H0/H- current monitor to align with magnets spares. Update the BI budget baseline in case.

WP Action BI J. Tan/S. Burger/W. Weterings: Investigate if 2 extra spares for H- charge-exchange beam profile and foil inspection BTVs are needed. Check feasibility of removing an old unit & re-installing a new one if needed. Update the BI budget baseline in case. J. Tan, S. Burger: Submit the ECR for BI.BTV30. J. Tan/J. Belleman/L. Soby: Demonstrate 200 μm resolution for low intensity beam for the turn-by-turn measurement system. Demonstrate reliable operation with new firmware/software. Electronics to be ready for deployment in EYETS 16-17. BI, RP J. Tan, R. Froeschl: Optimize the scheduled work in the radiation laboratory for the BCTs-BR.TMD currently installed in PSB section 8L1.