SWCam PDR detector thoughts

Slides:



Advertisements
Similar presentations
Probability models- the Normal especially.
Advertisements

TMA-65 Workup Robin Lafever 30 April Detector geometry.
Spectral Resolution and Spectrometers
Spectral Resolution and Spectrometers A Brief Guide to Understanding and Obtaining the Proper Resolution of the 785 Raman System.
 When we count we use exact numbers  If we count people we have exactly 4 people  There is no uncertainty about this number of people.  Measurements.
Measurements: Accuracy, Precision, & Error
THE TIME IS NOW! THE TIME IS NOW!. Top 10 Reasons to Attend the Upcoming Worship Seminar Top 10 Reasons to Attend the Upcoming Worship Seminar 10. You’ll.
External Time Line October Job Openings for Economists August and September too November JOE too December 1 (sometimes earlier): first deadlines for materials(December.
NGAO Instrumentation Overview September 2008 Updated Sean Adkins.
Beam Position Monitors MICE CM Harbin January, 2009.
Direction-detection spectrometer concepts the CCAT Matt Bradford + others 24 October 2006, in progress.
Writing the Research Report The purpose of the written report is to present the results of your research, but more importantly to provide a persuasive.
Radio flux density monitoring: recent MERLIN results Andy Biggs (Joint Institute for VLBI in Europe)
2Al + 3Br 2  2Al Br g 46.0g ?g 1.How much aluminum bromide can be formed from aluminum? 2.How much aluminum bromide can be formed from bromine?
Depth from Diffusion Supported by ONR Changyin ZhouShree NayarOliver Cossairt Columbia University.
A. Monfardini, IAP 26/06/ Kinetic Inductance Detectors for CoRE-like applications Potentially involving (from the technical point-of-view): - Grenoble.
Vu Pham Refereeing and Discussant Guidelines Susan Godlonton AGRODEP AIEN III Workshop Dakar, Senegal 4 th June, 2014.
1 FRIDA Engineering Status 17/05/07 Engineering Status May 17, 2007 F.J. Fuentes InFraRed Imager and Dissector for Adaptive Optics.
A. Monfardini, IAP 30/07/ NIKA (Néel IRAM KID Array) First light at the 30-m IRAM dish NIKA collaboration: - Institut Néel - Grenoble - AIG - Cardiff.
Status of the Beamline Simulation A.Somov Jefferson Lab Collaboration Meeting, May 11, 2010.
Neel IRAM KIDs Array - Cryostat - Filters - Cold electronics - Measurement methods and assumptions for Sensitivity calculation - Antenna-coupled 42 pixels.
USCEL Third Run EMI Round Robin Roland Gubisch Intertek.
WFIRST IFU -- Preliminary “existence proof” Qian Gong & Dave Content GSFC optics branch, Code 551.
N I K A Grenoble (Néel, IRAM, LPSC, LAOG) Cardiff SRON Roma-Trento Néel IRAM KIDs Array Grenoble (Néel, IRAM, LPSC, LAOG) Cardiff SRON Roma-Trento.
PACS SVR: 22/23 June 2006 MPE - Ge:Ga Detector Array1/16 Ch. Hartinger / L. Barl Ge:Ga Detector Arrays.
PrimEx collaboration meeting Energy calibration of the Hall B bremsstrahlung tagging system using magnetic pair spectrometer S. Stepanyan (JLAB)
The study of Reber et al. (2006):Reber et al. (2006): © POSbase 2008Contributor People often misjudge their own performance (Kruger, 1999). There are different.
Using S’mores as a Model To Understand Limiting Reactants.
Solar orbiter_______________________________________________.
THE WEEKLY DETECTOR Taormina, Italia June, 2005 € 0.00 The Nerds are Back In Town !! This Week’s Forecast Clear Skies Seeing 0.4” Some Ash Warm.
What the data can tell us: Evidence, Inference, Action! 1 Early Childhood Outcomes Center.
Status DETECTORS: -Baseline for 2mm: -Baseline for 2mm: NICA 5a (144 pixels, IRAM, 30nm sputtering); average sensitivity: 6mK/Hz 0.5 (1Hz) corresponding.
ALICE SSD 20 May Yalta G-J Nooren ALICE SSD status.
PLATO Focal Plane Assemblies (FPA) Roser Urquí Centro de Astrobiología (CSIC-INTA)
How have you been respectful this week?.  How you treat others  Being thoughtful about others feelings  Looking out for people, property and the.
Work Package 2 – Overview of instrumentation, data gathering and calibration issues Calibration of the Galileo 94GHz radar – two years of data Nicolas.
MAKO A 350/850  m camera designed for operation at the Caltech Submillimeter Observatory Christopher McKenney.
May 31, 2010Bill Wisniewski1 Mechanical Integration Issues.
A discussion on the Readout Schedule leading to PDR Ganesan Rajagopalan Cornell University.
Instrument Control Systems Seminar, 20 October 2014 Instrument Development Process Hans Dekker.
The reading is 7.38 mm. The reading is 7.72 mm.
SWCam Project Status October 3, 2012 Gordon Stacey 1.
Internal CDR meeting December 20th, 2005
Measurement: Accuracy, Precision, & Error
Internal Standard method (experiment lab-4)
4x8 Mosaic Camera Development
Sampling distribution
IR Detector - Test cryostat : Machining
Detectors sub-system for QUBIC
NIKA Oct 2009 Run: Calibration & Sensitivity
VELO Metrology CERN Metrology Lab (EST/MF)
CDR Project Summary and Issues
Instrument Preliminary Design Review (I-PDR) September 28th, 2005
An IFU slicer spectrometer for SNAP
Status DETECTORS: We have a first baseline array (144 pixels) at 2mm. Average sensitivity: 6mK/Hz0.5 (1Hz) Without de-correlation. In 2009 it was roughly.
3 Bu 24 Rt 4 Mm 6 Rk Ratio – 3:4:6 or 1:1.33:2
CAPM Testing & Implementing Porftolio Theory
Scheduling Toolkit Observation Scheduling Boyd Waters, NRAO
Mythbuster Format Great for commonly accepted or popular solutions that don’t really work.
GOES -12 Imager April 4, 2002 GOES-12 Imager - pre-launch info - radiances - products Timothy J. Schmit et al.
29 November 2012 AGENDA: DO NOW: read page 27 in your student guide
مديريت موثر جلسات Running a Meeting that Works
Hall C Users Meeting 31 January 2009
SNAP NIR Detector Packaging Development: Universal SiC Package
Chapter 3 The Idea Of Causation on Social Research
SESSION 8: AIMS AND OBJECTIVES
Somers High School New Schedule
PANDA Cryostat and Yoke
WJEC Past Paper Questions (with Answers).
MAORY Status of the project
Presentation transcript:

SWCam PDR detector thoughts GJS / CDD 2014 Apr 9

Needed for PDR demo of sufficiently low NEPoptical at 350 mm Assume this is sufficient demo for 450 mm also. credible evidence of meeting requirements on total number and yield (>80% of detectors have required performance) 850 um: very credible paper design Likely to have a lab test before PDR, but I don’t think we would hold up PDR for NEP, if the paper design really is credible. 2 mm: credible paper design Will ask around to get a sense of where optical measurements are likely to be by then. complete (but preliminary) design of focal plane packaging that is credible Lab test of any new required technologies (e.g., cabling). credible cost and schedule estimate complete (but preliminary) design that demonstrates that all this can be accommodated in cryostat, read out, archived, and calibrated.

2 mm TiN: Al: empirical: Response looks normal at 1.2 mm. theoretical: n >~ kTC/h = 21 GHz (TC/1 K) (Missing a prefactor of order unity.) Al: empirical: NIKA instrument uses Al LEKIDs at 2.1 mm.

PDR Timing MAKO2 run should conclude in mid September. It would be nice to have a little time to do some further lab measurements afterward. PDR no earlier than November?