NA CONSOLIDATION & SAFETY SYSTEMS

Slides:



Advertisements
Similar presentations
Study report on the TDC2/TCC2 Cabling and Low Voltage activities Ivan Moya Martinez– EN/EL/CF – WP 31st Meeting
Advertisements

CURRENT STATUS OF CV INSTALLATIONS, WORKS DURING LS1 AND PROBLEMS ENCOUNTERED DURING START-UP NORTH AREA Bill Bannister / Jani Lehtinen EATM – 7 th October.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
East Area, M2, K12 Lau Gatignon / EN-MEF, EATM
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
 Overview of the run 2009 for CV  Major improvements in Water treatment - Demineralised water production - Cooling control  Major concerns for.
Lau and Niels, NA62 TD meeting, 17 March Complete the crane consolidation in TCC8 Reinstall front-end after alignment checks Consolidation of T10.
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
Essential Consolidation Items for LIU-PSB Collection from LIU-PSB WP holders.
Serge Pittet (Work-Package holder) Konstantinos Papastergiou (Work-unit: Sirius converters) CERN Technology Department | Electrical Power Converters 12.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/21.
TE-CRG Activities D. Delikaris, TE-CRG.
Technical Review EHN1 Extension Cooling Systems and Pipework Jérôme Rodary / EN-CV.
1. Road to the EDR 2 Requirements Safety system Transfer line concept Plant concept design Requirements Evaporator concept and performance Transfer line.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Status of Gas Barrack(SPS) and Exhaust JAILLET David EN/EA/CT.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/14.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/02/04.
Electrial Safety LS2 days November 2016 AP
TE-CRG Activities A. Perin, on behalf on the Cryogenics Group.
Update on the PSB Cooling and Ventilation Systems
LIU and TE/VSC activities LIU-SPS aC coating & flange impedance reduction Paul Cruikshank LIU & TE/VSC activities, 23/6/2016 Paul Cruikshank.
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
EN-CV activities for LHC during LS2
NA CONSOLIDATION & SAFETY SYSTEMS
Linac4-PSB 160 MeV connection readiness review
East Area Renovation Project Team meeting # 2 – EDMS News
Framework Schedule from EYETS 2016 to LS2
PSB Lock Out Test, Follow-Up AP. Bernardes-/EN-STI, K
IT-4189 Supply and installation of a cryogenic distribution system
BE-ICS Activities during the LS2 Period (15 min)
ODH Risk Assessment underground gallery B887-EHN1
Francois and Lau EATM 17 July 2012
EHN1 Extension North Side wall (Removal of Existing services & platforms) Michael Jeckel & Bastien Rae.
AD consolidation activities in LS2
Budget specification EHN1 Extension: Infrastructure (WG2)
NA CONSOLIDATION & SAFETY SYSTEMS
Safety for the FCC Conceptual Design Report
EC Activities Status for the LIU
n_TOF “Draft” plans for YETS and LS2
Keeping LHC cold during LS periods Preliminary proposal
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
SPS EN-CV Planning LS (initial draft)
SPS Planning for the EYETS Meeting 8 (07/12/2016)
CV maintenance works during YETS
HL Consolidation Day Analysis of needs from BE-ICS
TE-MSC activities in SPS during YETS
Status with crucial LSS5 kicker transmission line cables
Status of the cryogenic system for B180
East Hall under construction
GIS Portal Racks Project
Experimental Areas – LS2 planning
Implementation of RP training ranks in SPS and NA_target
North Area Safety Review 2019
North Area Safety Review 2019
Summary of the presentation:
Aziz AMAMOU EACM – 21th May 2019
East Hall under construction
Comments on the North Experimental Area Consolidation Request Form
Presentation transcript:

NA CONSOLIDATION & SAFETY SYSTEMS Y. Kadi, F. Gautheron, E. Solodko, M. Wilhelmsson 90th EA Technical Meeting, 17 October 2017

North Area Consolidation & Safety Systems Status Discussions with groups still ongoing: BE-ICS, EN-EA, EN-CV, EN-HE, SMB, TE-CRG, TE-MSC, HSE, HSE-RP, EN-STI, EN-EL, TE-EPC, TE-MPE, TE-VSC, BE-BI, BE-CO, IT-CS Plans for LS2/LS3 much clearer Urgent actions for LS2 covered in NA-CONS but not all approved Budget/Manpower requests being collected Implementing failure statistics for NA Survey launched EMP Energy Saving Y. Kadi, 17-10-2017 North Area Consolidation & Safety Systems

Failure Stats: preliminary analysis Y. Kadi, 17-10-2017 North Area Consolidation & Safety Systems

Flammable Gas Detection & ODH New distribution of flammable gas detectors and ODH in EHN1 (D. Jaillet 83rd EATM) Pending installation for the Saleve side (2017-2018). Cabling to be performed. DIC received by EN-EL (J.C. Guillaume) from M. Averna. EN-EL has declared to be available for this task. Flammable gas detectors renovation in EHN2 Activity shifted to LS2 - Drafted DIC sent to EN-EL, but to be finalized. J.C Guillaume email’s: “pour l’instant le câblage est prévu dans la zone nord après les campagnes de câblage de l’anneau (SPS) fin 2020”. A request for a risk assessment should be addressed to HSE for flammable gas and ODH risks in to confirm the needs: EHN2 (dept. EP). Check if the actual location / number/ sensibility of gas detectors around the experiment is still fitting with the needs. bldg. 908 (gas barrack – dept. EN, risk assessment to reduce number of relief valves. Flammable gas detectors renovation in ECN3 Hydrogen detection in the cavern (mixing area) and barrack (bldg. 918) Y. Kadi, 17-10-2017 North Area Consolidation & Safety Systems

Fire Detection & Beam Imminent Warning Risk to be assessed by HSE, status report required Detection technology to be deployed Fire doors? Segmentation along beam lines? ….not necessary same needs than SPS Issues already known: Absence of smoke evacuation in the NA beam tunnels Obsolete sprinklers Surface buildings: Evacuation alarm to be renovated 30 km of PVC pipe (air sampling network) must be removed Where? ECN3, BA82, EHN2, TDC2, TCC2, BA80 When? RUN3 & LS3 Y. Kadi,17-10-2017 North Area Consolidation & Safety Systems

Cryogenics Installations Items already treated (maintenance or consolidation): All compressors and cold boxes are OK UNICOS migration already performed for all the cryo controls NA62 consolidation (LN2 transfer line for liquid krypton, valves) done To be consolidated: 6 centrifugal pumps for experimental SC magnets (6x150 kCHF) Urgent: 3.3kV cells for control and compressors (bldg. 895) -> EN-EL by end of 2020 => NA62 included Stop renting and purchase large LN2 storages (2x20000 l + 1x50000 l) -> 440 kCHF (from a 2014 cost estimate): long term savings… Y. Kadi, 17-10-2017 North Area Consolidation & Safety Systems

North Area Consolidation & Safety Systems Magnets - TE-MSC Current situation: 426 beam line magnets in total Spares magnets are available for almost all the families Activities to be done for 2017: zero-field probe replacement, exchange of manifolds, ELETTA refurbishing, renovation of electrical interconnections Possible safety audit: Inspection not needed: TE-MSC aware of all the issues related to safety and reliability Known issues: electrical safety conformity, water leaks, shimming of the coils, replacement of polyurethane pads for the magnets supports Energy Balance program upgrade: The program should be validated by physicists Only ~116 solid yoke magnets can be replaced by laminated ones Some of these magnets are of the same families as for the EA Future actions: TE-MSC to provide to EN-DSO past history of leaks/incidents TE-MSC to prepare work unit description EN-DSO to update risk assessment and issue recommendations Magnet interlock standardization required Energy saving study progressing Y. Kadi, 17-10-2017 North Area Consolidation & Safety Systems

Civil Engineering - SMB-SE Issues which can potentially be included in the consolidation program : Infiltration of ground water in the tunnels Motorized doors renovation False floors Drainage networks Roofs In case of upgrade, all the works will be contemplated in the context of the equipment groups/users future requirements; Items that should be included in possible safety diagnostic: Systems for smoke evacuation (sky domes more appropriate than extraction) Presence of asbestos Future actions: EN-EA to contact TSOs and users of all NA buildings SMB-SE to fill in the work unit description documents False floor becoming safety concern => urgent action (LS2) ? Y. Kadi, 17-10-2017 North Area Consolidation & Safety Systems

Cooling & Ventilation - EN-CV EN-CV group is well advanced in terms of identification of consolidation activities. Three work unit description documents were received a month ago. The activities for 2017/2018: TDC2/TCC2 ventilation: 5/8 power cubicles already done. Renew remaining 3 power cubicles during YETS 2017/2018 Chilled water renovation all along the years except during LS2 BA80 and BA82: soft start of the pumps Activities planned for LS2: Chilled water pipe renovation Renovation of the cooling towers power control system (building 893) Replace backing of the cooling towers Activities post-LS2: Renovation of the ventilation system of all surface buildings (BAs) Work on the compressed air system during the YETS and EYETS Renovation of the Ventilation system of the gas building Continue the soft start of the pumps Future actions: EN-CV to provide remaining work unit description documents Ventilation study for ODH in underground galleries Indexation of the ventillation in TCC8 Y. Kadi, 17-10-2017 North Area Consolidation & Safety Systems

Handling & Transport - EN-HE The activities for 2017/2018: Currently no activities are to be done for this year Replacement of lifts alarm (not with NA-CONS budget) Activities to be done during LS2: B. 889 (BA 80) crane revamping + remote operations B. 888 (EHN2) cranes PR-0539 & PR-0545 revamping or electrical renovation B. 886 (TCC2) cranes PR-0537 & PR-0544 revamping or replacement Activities post-LS2: B. 889 (BA 80) lift B. 912 (PP851) lift BAA85 lift Future actions: EN-HE to provide work unit description documents Y. Kadi, 17-10-2017 North Area Consolidation & Safety Systems

Secondary Beam Lines - EN-EA Urgent Safety requirements Buffer zone and RP monitor in BA80 SUSI for EHN2 Closing of galleries in EHN1 and ODH Key cabinet in EHN1 Dry vacuum pumps for TCC2 Gas safety (safety valves, check valves, purging systems) Collimator renovation 9 collimators in total this year (program will continue) Beam line items renovations Fellows and TTE for NA-CONS Study PJAS for Cesar Bend 7 Gas rack for XCET Note that gas renovation measures are reported separately Complete review incl. spares Critical items have been identified Y. Kadi, 17-10-2017 North Area Consolidation & Safety Systems