Status of GEM DHCAL Andy White RD51 Collaboration Meeting CERN

Slides:



Advertisements
Similar presentations
Development of high rate RPCs Lei Xia Argonne National Laboratory.
Advertisements

Bulk Micromegas Our Micromegas detectors are fabricated using the Bulk technology The fabrication consists in the lamination of a steel woven mesh and.
Digital Hadron Calorimetry using Gas Electron Multipliers Andy White University of Texas at Arlington.
First results from GEM-based Calorimeter prototype for the Linear Collider A.White 4/28/03 (for J.Yu, J.Li, M.Sosebee, S.Habib, V.Kaushik)
GEM DHCAL Simulation Studies J. Yu* Univ. of Texas at Arlington ALCW, July 15, 2003 Cornell University (*on behalf of the UTA team; S. Habib, V. Kaushik,
The first testing of the CERC and PCB Version II with cosmic rays Catherine Fry Imperial College London CALICE Meeting, CERN 28 th – 29 th June 2004 Prototype.
July 2003American Linear Collider Workshop Cornell U. Development of GEM-based Digital Hadron Calorimetry Andy White U.Texas at Arlington (for J.Yu, J.Li,
Andy White U.Texas at Arlington (for J.Yu, C.Han, J.Li, D.Jenkins, J.Smith, K.Parmer, A.Nozawa, V.Kaushik) 10/18/04 IEEE/NSS Digital Hadron Calorimetry.
Sept. 24, Status of GEM DHCAL Jae Yu For GEM-TGEM/DHCAL Group Sept. 24, 2010 CALICE Collaboration Meeting Univ. Hassan II, Casablanca Introduction.
GEM Digital Hadron Calorimetry
1 Status of GEM DHCAL Andy White For GEM-TGEM/DHCAL Group March 21, 2011 ALCPG11 Workshop Univ. of Oregon Introduction 30cmx30cm 2D readout with KPiX chip.
Development of a DHCAL with Resistive Plate Chambers ECFA/DESY Workshop at NIKHEF, Amsterdam, Netherlands April 1 - 4, 2003 José Repond Argonne National.
Andy White University of Texas at Arlington For GEM DHCAL Group ESTB Workshop SLAC 2012 Introduction KPiX Readout FTBF Beam Test Setup Beam Test Analysis.
José Repond Argonne National Laboratory Status of the DHCAL Project SiD Collaboration Week January 12 – 14, 2015 SLAC.
Hadron Calorimeter Summary Andy White SiD Workshop, SLAC October 2006.
SiD Concept – R&D Needs Andy White U. Texas at Arlington SiD Concept Meeting LCWS06 Bangalore, India March 11, 2006.
Andy White U.Texas at Arlington (for J.Yu, J.Li, M.Sosebee, S.Habib, V.Kaushik) 01/07/04 SLAC/ALCPG Development of Digital Hadron Calorimetry for the Linear.
M. Chefdeville LAPP, Annecy, France. Introduction  Motivations for a Digital hadronic calorimeter Count hits instead of measuring energy deposits Reduce.
DHCAL Overview José Repond Argonne National Laboratory CALICE Collaboration Meeting DESY, Hamburg, Germany March 20 – 22, 2013.
The DHCAL Data Analysis José Repond CALICE Meeting, Prague, September 10 – 12, 2007.
Development of the Readout ASIC for Muon Chambers E. Atkin, I. Bulbalkov, A. Voronin, V. Ivanov, P. Ivanov, E. Malankin, D. Normanov, V. Samsonov, V. Shumikhin,
UTA GEM DHCAL Simulation Jae Yu * UTA DoE Site Visit Nov. 13, 2003 (*On behalf of the UTA team; A. Brandt, K. De, S. Habib, V. Kaushik, J. Li, M. Sosebee,
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
Towards a 1m 3 Glass RPC HCAL prototype with multi-threshold readout M. Vander Donckt for the CALICE - SDHCAL group.
May 31, 2007CALICE DHCAL J. Yu 1 Gas DHCAL R&D May 31, 2007 WWS CAL R&D Review, DESY Jae Yu University of Texas at Arlington For CALICE DHCAL Groups Introduction.
1 The CALICE experiment at MTBF (FNAL) summary of a fruitful test beam experiment Erika Garutti (DESY) On behalf of CALICE.
ILC Calorimetry Test Beam Status Lei Xia ANL HEP.
Noise and Cosmics in the DHCAL José Repond Argonne National Laboratory CALICE Collaboration Meeting University Hassan II Casablanca, Morocco September.
Lei Xia ANL – HEP. Physics prototype: proof of principle Linearity CALICE SiW ECAL.
June 1, 2007GEM DHCAL Status Report J. Yu 1 UTA GEM DHCAL Update June 1, 2007 LCWS2007, DESY Jae Yu University of Texas at Arlington For GEM/DHCAL Group.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
Update on GEM-based Calorimetry for the Linear Collider A.White 1/11/03 (for J.Yu, J.Li, M.Sosebee, S.Habib, V.Kaushik)
DHCAL Overview José Repond Argonne National Laboratory CALICE Collaboration Meeting Argonne National Laboratory March 19 – 21, 2014.
Application of Large Scale GEM for Digital Hadron Calorimetry Jae Yu For GEM DHCAL Group June 11, 2011 TIPP 2011 The Goals 30cmx30cm 2D readout with KPiX.
Digital Hadron Calorimetry for the International Linear Collider Using Gas Electron Multiplier Technology Andy White University of Texas at Arlington (for.
Status of GEM DHCAL Jae Yu For GEM DHCAL Group April 25, 2012 KILC Workshop, KNU Introduction KPiX V9 and DCAL Integration FTBF Beam Test Setup Beam Test.
Future R&D of the RPC based Digital Hadron Calorimeter (DHCAL) Lei Xia ANL_HEP.
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
Future DHCAL Activities José Repond Argonne National Laboratory CALICE Meeting, CERN, May 19 – 21, 2011.
SDHCAL. outline  SDHCAL concept, validation and construction  Test Beam and technological prototype performance  Perspectives and Conclusion  SDHCAL.
Andy White University of Texas at Arlington For GEM DHCAL Group CALOR 2012 Introduction KPiX V9 and DCAL Integration FTBF Beam Test Setup Beam Test Analysis.
Trigger & Tracking detector for CMS
Vincent Boudry LLR, École polytechnique LCTW'09 Orsay 2-5 November 2009 Calorimetry Hot spots.
CALICE, Shinshu, March Update on Micromegas TB analysis Linear Collider group, LAPP, Annecy CALICE collaboration meeting 5-7 March 2012, Shinshu,
Concept for LOKI detector system. Rear Detector 2 Spider Cob (central detector) Octant (Out detector) Maybe subdivided in two parts.
Roman Pöschl LAL Orsay Testbeam plans 2012/13 CALICE Collaboration Meeting Heidelberg September 2011.
DHCAL Progress Report José Repond Argonne National Laboratory SiD Meeting, SLAC, October 26, 2006.
Large THGEM sampling elements for DHCAL status report
Thick-GEM sampling element for DHCAL: First beam tests & more
Test Beam Request for the Semi-Digital Hadronic Calorimeter
Development of GEM DHCAL
The European DHCAL status
CEPC 数字强子量能器读出电子学预研进展
A Digital Hadron Calorimeter Resistive Plate Chambers
SiD Calorimeter R&D Collaboration
Construction and Testing of a Digital Hadron Calorimeter Prototype
On behalf of the GEMs for CMS Collaboration
(My personal) CALICE Report
Digital Calorimetry using GEM technology Andy White for UTA group
The DHCAL: an overview José Repond Argonne National Laboratory
Gaseous Beam Position Detectors, with Low Cost and Low Material Budget
GEM-based Digital Hadron Calorimetry for SiD
   Calorimetry et al.    SUMMARY 12 contributions Tile HCAL
Development of Gas Electron Multiplier Detectors for Muon Tomography
Technical Board – DCAL Software
GEM-based Digital Hadron Calorimetry for SiD
Rick Salcido Northern Illinois University For CALICE Collaboration
GEM DHCAL Status and Plans
AIMS 1- Build SDHCAL prototype of 1m3 as close as possible to the one
(On Behalf of CMS Muon Group)
Presentation transcript:

Status of GEM DHCAL Andy White RD51 Collaboration Meeting CERN For GEM-TGEM/DHCAL Group April 14 , 2011 RD51 Collaboration Meeting CERN Introduction 30cmx30cm 2D readout with KPiX chip GEM-DCAL Integration TGEM Progress Large GEM Foil Certification Large Chamber Mechanical Design GEM DHCAL Plans Summary April 14, 2011 GEM DHCAL

Why GEM? Flexible configurations: allows small anode pads for high granularity Robust: survives ~1012 particles/mm2 with no performance degradations Based on electron collection, ~few ns rise time Short recovery time  can handle high rates Uses simple gas (Ar/CO2) – no long-term issues Runs at relatively low HV ( ~400V across a foil) Stable operations April 14, 2011 GEM DHCAL

GEM-based Digital Calorimeter Concept Use Double GEM layers -2100V ∆V ~400V 0V { ~6.5mm April 14, 2011 GEM DHCAL

Gas outlet Top side Data cable HV power LV power Analog signal Fe55 Source Signal Gas outlet Top side Data cable HV power LV power Analog signal April 14, 2011 GEM DHCAL

GEM-DHCAL/KPiX boards with Interface and FPGA boards April 14, 2011 GEM DHCAL

KPiX/GEM/DHCAL KPiX chip One channel of 1024 Dynamic gain select 13 bit A/D DHCAL anode pad Storage until end of train. Pipeline depth presently is 4 Leakage current subtraction Event trigger calibration April 14, 2011 GEM DHCAL

KPiX/GEM/DHCAL Work with SLAC colleagues on KPiX7,9 debugging/operation * Many thanks to M. Breidenbach, D. Freytag, R. Herbst April 14, 2011 GEM DHCAL

GEM+kPiX7 Fe55 and Ru106 Spectra Good conformation to characteristic Minimum Ionizing Landau fit April 14, 2011 GEM DHCAL

Charge Weighted Lego for Fe55 Inactive area (HV not applied) HV=1960 V, Self Trigger Th=1.8 V= 14fC

Gain vs HV Typical operating point: Gain ~6000 April 14, 2011 GEM DHCAL

Pressure Dependence of Gain April 14, 2011 GEM DHCAL

Cosmic Ray Data with External Trigger – kPiX7 Noise spectrum April 14, 2011 GEM DHCAL

2D Cosmic Ray Hits – kPiX7 2 x 3 cm2 trigger counter Three noisy channels removed ~4.5% kPiX duty factor April 14, 2011 GEM DHCAL

CERN TGEM Test-beam detector 64 pads electrode with KPiX behind 10x10 cm2 THGEM Weizmann - UTA - Aveiro - Coimbra U.S. Israel Bi-National Science Foundation PIONS MUONS April 14, 2011 GEM DHCAL THGEM - A. Breskin et al

CERN TGEM Test-beam detector one-sided THGEM 10.3 mm mesh resistive layer anode pads “Well” TGEM configuration - Further tests Summer 2011 April 14, 2011 GEM DHCAL

GEM+DCAL (used for RPC-DHCAL) *Many thanks to ANL colleagues! J. Repond, L. Xia, G. Drake, J. Schleroth, J. Smith (UTA student at ANL) and H. Weerts. Noise Scan with Threshold at 0 DAC counts We found that noise rate is very low for the range of threshold 0 – 40ADC, once the 8 noisy channels are suppressed. No significant changes of noise rate increases seen after the suppression. CMS France Geneva Airport ~All channels alive Swizerland ATLAS 8 noisy channels suppressed April 14, 2011 GEM DHCAL

GEM+DCAL, Collimated Fe55 Source in 4 locations Threshold: 0 DAC, noisy channels suppressed CMS Swizerland ATLAS April 14, 2011 GEM DHCAL

GEM+DCAL, Elevated Fe55 Source Threshold: 0 DAC, noisy channels suppressed April 14, 2011 GEM DHCAL

DCAL Threshold Scan, External Trigger 1 DAC count ~ 0.3fC

Cosmic Ray Seen with GEM-DCAL Coincidence area Noisy channels

Just for fun, Fe55 Source + X-ray image April 14, 2011 GEM DHCAL

33cmx100cm GEM Foil Design Designed to work with DCAL boards Active area 940x306 mm2 Number of HV sectors = 31 to minimize loss in case of damage HV sector dimension= 9.9x950 mm2 Nov. 16, 2010 GEM DHCAL, J. Yu

33cmx100cm DHCAL Unit Chamber Construction Base steel plate, t=2 mm Readout Board 320x500 mm2 320 mm 1000 mm Readout boards are part of the gas volume!! How do we mate these together with minimal dead area? 1mm pad board 2mm FE board 1mm assister strong back 2mm steel strong-back + thin cathode layer 3mm 1mm 1cm thick support from G10 spacers We might be able to avoid this dead zone by gluing the two boards directly together!! April 14, 2011 GEM DHCAL

Onward to 100cmx100cm GEM Planes!! CERN GDD Workshop delivered the first 5 of 33cmx100cm GEM foils in 2010  Qualification completed!! Each of the GEM 100cmx100cm planes will consist of three 33cmx100cm unit chambers Design for Large Area GEM detector frames March 21, 2011 GEM DHCAL, J. Yu

GEM DHCAL Plans Phase I (Through late 2011)  Completion of 30cm x 30cm characterization and DCAL chip integration Perform beam tests @ FTBF with 30cm x 30cm double GEM chambers, one with KPiX9 and two with DCAL Completion of 33cmx100cm large foil evaluation TGEM chamber beam tests at CERN Phase II (late 2011 – early 2013): 33cm x 100cm unit chamber development and characterization Begin construction of 2 unit 100cmx33cm chambers, one with kPiX and one with DCAL Bench test with sources and cosmic rays and beam tests Phase III (Early 2013 – mid 2014): 100cmx100cm plane construction Construct 6 unit chambers with DCAL for two 100cmx100cm planes Characterize 100cmx100cm planes with cosmic rays and beams Phase IV (Mid 2014 – late 2015): 100cm x 100cm plane GEM DHCAL performances in the CALICE stack Complete construction of five 100cm x 100cm planes inserted into existing CALICE calorimeter stack and run with either Si/W or Sci/W ECALs, and RPC or other technology planes in the remaining HCAL April 14, 2011 GEM DHCAL

Summary 30cmx30cm GEM prototype chambers kPiX readout: Established good 2D working condition with v7 now working on v9 (512 channel) integration DCAL integration started well  developing understanding  more work! Getting ready for beam test at FTBF in May 2011 TGEM with KPiX v7 had a beam test at CERN Another with V9 planned this summer at CERN 33cmx100cm unit chamber construction proceeding First 5 foils of 33cmx100cm delivered and qualification completed Spacers to be ordered Mechanical design being worked out for constructing 33cmx100cm unit chambers and 1mx1m planes for DHCAL testing Funding uncertainty makes it difficult to plan for long term April 14, 2011 GEM DHCAL