2009 TESLA Technology Collaboration Meeting at Orsay

Slides:



Advertisements
Similar presentations
F L O R I D A H I G H S C H O O L A T H L E T I C A S S O C I A T I O N FHSAA Competitive Cheerleading Review and Update.
Advertisements

Sep. 30, 2008 IOC meeting at LINAC08 1 Linac 2010 Proposal Masanori Ikegami and Yong Ho Chin KEK JACoW 2008 Team Meeting KEK, Tsukuba, November 19, 2008.
Synchrotron Radiation What is it ? Rate of energy loss Longitudinal damping Transverse damping Quantum fluctuations Wigglers Rende Steerenberg (BE/OP)
Committees The Advisory Group’s Workshop Vital to effective, efficient, productive, organized action in a democratic society.
Accelerator Physics with Relativity By Mark, Jack and Frances (Designing the LHC in an hour and a half)
HIPPI 05, Abingdon, Introduction to HIPPI05 -Few words on the life of HIPPI -A new HIPPI Management… -HIPPI 05 organization -Mandate for the.
F Project X Overview Dave McGinnis October 12, 2007.
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
ILD workshop 119 participants (including last minute registrations which are not on the WEB) 2 days of contributions lively discussions, which had to be.
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
10/25/2007GlueX Collaboration Meeting1 October 25-27, 2007 Jefferson Lab This is approximately our 20’th such meeting.
High Energy Physics in Japan in 1970’s H.Sugawara, Kona,Hawaii,2010.
PIP-II: Why a new accelerator? Paul Derwent Fermilab Community Advisory Board 23 July 2015.
Boards of Review By Bob Colbert Little Econ District Phone:
Synchronization Issues in MEIC Andrew Hutton, Slava Derbenev and Yuhong Zhang MEIC Ion Complex Design Mini-Workshop Jan. 27 & 28, 2011.
Jan Low Energy 10 Hz Operation in DRFS (Fukuda) (Fukuda) 1 Low Energy 10Hz Operation in DRFS S. Fukuda KEK.
R. Miyamoto, MEBT Lattice Optimization, ESS AD Beam Physics Internal Review 1 MEBT Lattice Optimization Ryoichi Miyamoto (ESS) For Beam Physics Group,
Problems of charge compensation in a ring e+e- higgs factory Valery Telnov Budker INP, Novosibirsk 5 rd TLEP3 workshop, FNAL, July 25, 2013.
Establishment of QIT and WIT 5S Training of Trainers for Training Institutions Training material No. 24.
05/12/2011O. Napoly1 TESLA Technology Collaboration Beijing, 5-8 December 2011 O.Napoly, CEA-Saclay TTC Chairman Introduction and update since last meeting.
Technical Board Report TESLA Technology Collaboration Meeting, Dec. 5 – 8, 2011, IHEP, Beijing, China TESLA Technology Collaboration Meeting, Dec. 5-8,
Hans Weise, DESY TTC Meeting, Milano, February 28 – March 3, 2011 Technical Board Meeting TESLA Technology Collaboration Meeting Milano, February 28 th.
05/12/2011O. Napoly1 TESLA Technology Collaboration JLab, 5-8 November 2012 O.Napoly, CEA-Saclay TTC Chairman Collaboration Board Report.
1 Linac 2010 Yong Ho Chin (SPC Chair) JACoW Steering Committee Meeting at PAC09 May 7, 2009.
ACCSYS Design Reviews J. G. Weisend II Deputy Head of Accelerator Projects.
Status of ATF2 linear collider focus prototype emphasizing France-China joint contributions Philip Bambade Laboratoire de l’Accélérateur Linéaire Université.
19Jul06 Vancouver GDE meeting 1 S2 Task Force Status (String test definition) Tom Himel.
PSI, Zurich February 29 – March Session classification : Accelerator Concepts Tuesday, March 1, 2016 Introduction Vyacheslav Yakovlev Fermilab,
The workshop Conclusions of the 8th San Cristòbal de las Casas
Board Roles & Responsibilities
V. Paramonov, on behalf INR team.
Transforming the future of public health in Missouri
Longitudinal Dynamics of Charged Particle
WP5 Elliptical cavities
J. Sterling Morton High Schools
Charting Your ASSE Leadership Path
Physics Analysis Summaries towards a proposal
IUCN’s ‘One Programme’ approach:
Accelerator Research and Innovation for European Science and Society
ASME Student Professional Development Conferences Update
Energy calibration issues for FCC-ee I. Koop, BINP, Novosibirsk
Charge for the Technical Board Members of the Tesla Technology Collaboration (TTC)
WG1: RELIABLE, ECONOMIC AND EFFICIENT SMART GRID SYSTEM
PSB rf manipulations PSB cavities
Cavity resonance control
Kylee’s Career Path How to become an Editor.
as of today 123 registered participants
FSAE Annual Conference presented by Bennett Napier, CAE
Terms of Reference for the Near-Earth Object Threat Mitigation
Summer/Winter Programs
Collaboration Board Meeting Closing Hasan Padamsee
Setting up an ERIC 11 May 2012 Richard Derksen
Rick McGee, PhD and Bill Lowe, MD Faculty Affairs and NUCATS
Young Privacy Professional Leader Onboarding
W. T. Weng Brookhaven National Laboratory
A Superconducting Proton/Electron Linac
Accelerator Safety Workshop SLAC
Physics Design on Injector I
Empire Shared collection program update
Mary Ellen Randall IEEE Humanitarian Activities Committee
Region 8 Meeting Harvey Solomon, MD
TESLA Technology Collaboration Meeting at Milano
Adult Education Survey Anonymisation Point 6
STRUCTURE AND METHODS OF CO-OPERATION
Motions Internal for LMSC 1st Vice Chair (And supporting slides)
CDS-EL IRR Closeout 28 March 2019 J.G. Weisend II, Chairman.
Hans Weise, DESY February 5th, 2019
Gap Transient Suppression using Increased Bunch Density
* 07/16/96 How a Bill Becomes a Law *.
Some Thoughts on the JLEIC Ion Injector
Presentation transcript:

2009 TESLA Technology Collaboration Meeting at Orsay CB Report Yoshishige Yamazaki TTC Chair J-PARC, KEK & JAEA 18th June, 2009 LAL University of Orsay Orsay, France 1

TTC CB (1) 17th June, 2009 17:30 to 18:40 1. Approval of minutes of last CB meeting. The printed minutes are distributed to the attendee, being unanimously approved. 2. Proposal to invite the Executive Committee (EC) members, Marc Ross and Nobu Toge, to join the CB meeting as observers is approved unanimously (the head of the TB, Hans Weise, has been already invited, while one more EC member, Olivier Napoly, is a CB member). 3. Selection of the new deputy chair (D.Proch will retire).

Dieter Proch It is to have been really guiding TTC. Here, let’s thank him for his Great Contribution to TTC, SRF Technology, and SRF Community World-Wide.

TTC CB (1) 1. Approval of minutes of last CB meeting. The printed minutes are distributed to the attendee, being unanimously approved. Proposal to invite the Executive Committee (EC) members, Marc Ross and Nobu Toge, to join the CB meeting as observers is approvedunanimously (the head of the TB, Hans Weise, has been already invited, while one more EC member, Olivier Napoly, is a CB member). 3. Selection of the new deputy chair (D.Proch will retire). The Chair proposed John Mammosser, SNS, as new deputy chair of TTC. After a short discussion this proposal was accepted unanimously by the CB. John Mammosser was called in. He appreciated the offer and expressed his willingness to accept the position of TTC deputy chair.

TTC CB (2) 4. Proposal of forming a New Board, referred to as “Scientific Board (SB)” or “Advisory Board (AB)”. The proposal is as follows. The mission of SB comprising the three members is to support the chair and deputy chair by suggesting the scientific TTC activities for electron, proton and low-beta SRF accelerators, respectively. This is necessary because TTC wants to extend its mission to the low-beta and proton linac. The scientific careers of the SB members should be competitive and be recognized by the world-wide SRF scientific community. The discussion on this proposal is as follows. One more board may complicate the TTC organization. The above mission should be covered by strengthening the TB. Actually, the low-beta SRF expert already joined the TB from the last meeting, which involved many Indian institutes interested in the low-beta SCC. Although the TB should cover the low-beta and proton SRF, the chairmanship should be also strengthened to cope with this trend. The proposal was finally approved by CB. The candidates will be soon nominated by close discussion between the chair and deputy chair.

TTC CB (3) 5. Discussion about the next TTC meetings: 5.1. Should we continue with 2 meetings per year? Considering the fast progress in SCC technology, it is still ideal to have the meeting held every 6 months approximately. However, the reality is that we could hold it nearly every 8 months or so, in order to avoid other meetings. 5.2. Should we continue with the rotation: EU-US-EU-Asia-EU? We have still more institutes committed in EU than US and Asia. So, we should continue this rotation for the time being. 5. 3. How to avoid overlap with other meetings? This has been always a big issue to solve, depending upon the specific situation. No general rule is possible. 6. Discussion about the next TTC meeting: location and time The next turn is North-American institute. FNAL volunteered to host the next meeting. However, 6 months later from now is December. Chicago’s winter is not a good season for travelers; heavy snow showers delaying/canceling flights quite frequently. So, the next meeting could be hold during March or April. The deputy chair investigated the schedule of other meetings to make a final decision for the dating, closely contacting with the meeting host. 7. Everybody agreed to tighten connection to the low beta and proton accelerator community. How to do it is an issue to need more discussion, but just try for the time being.

Questions or Comments ? Here

The Biggest Issue to solve for proton SC Linac (Chair’s personal view) The phase/amplitude accuracy (typically one degree and one percent) of each cavity in the proton linac is much higher than electron linac, since even the 1-GeV proton is not completely relativistic. The errors excite the synchrotron oscillation and/or mismatching longitudinally. The space charge force together gives rise to the halo formation, resulting in the beam loss. Also, the control of Dp/p is vital for ring injection both in deviation and distribution. At the ESS meeting held in Ancona, a long time ago, where the ESS began to think about the SC linac seriously, I proposed that one cavity per one klystron is a must under the influence of Lorentz detuning and microphonic one, whatever expensive it is. SNS cleverly took this scheme (perhaps independenly, since anybody thinks so). Since this scheme is too expensive for future multi-GeV linac, we have to develop reliable piezo-tuning technology, or cavity stiffening, or some innovative idea to realize multi-caivty per klystron scheme (J-PARC has been developing two cavities per one klystron system, making use of the cavity stiffening).

The Biggest Issue to solve for low-b, high-intensity SC Linac (Chair’s personal view) In order to mitigate the space charge force, we need frequent focusing both longitudinally and transversely, at the low-b section. This is one of the reasons why SNS and J-PARC chose high-frequency RF system. Therefore, the biggest challenge in the low-b structure is how to efficiently shield or prevent the magnetic field of the focusing magnets from influencing the superconductivity. In other words, how close can we place the focusing magnets to the superconducting caivities is a challenge. Of course, the reliable production of the complicated SC structure is a big challenge as you know well.

LINAC10 Conference to be held in Tuskuba In contrast to a big IPAC, the LINAC is like this meeting, having all sessions plenary and enabling the detailed, real discussion. Conference web site has been setup at http://linac10.j-parc.jp/

Outing to Nikko in LINAC10 The world famous Toshogu Shrine Kegon waterfall Nikko is one of Japan’s most popular destinations of tourists. It is famous of Toshogu shrine and the beautiful natural scenery. Lake Chuzenji

Outing to Nikko (cont.) Existing highways Nikko New highway Tsukuba ~70 km Tokyo A new highway opened last winter connecting two existing highways. With the new highway, we can gofrom Tsukuba to Nikko without going through Tokyo area. It shortens the travel time to ~1.5 hour, and reduces the risk of delay in schedule due to traffic jam.

for their Excellent Meeting Organization and Hospitality At the end, Let’s Thank Bernard and his Staffs for their Excellent Meeting Organization and Hospitality

Let’s Meet at Chicago Sometime And Let’s Meet at Chicago Sometime between this Winter and Next Spring