FIELDS Mission Assurance Manager University of California, Berkeley

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
Advertisements

GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Pat Lujan TEM.
GoetzFIELDS iPDR – I&T SPP/FIELDS Integration and Test Preliminary Design Review Keith Goetz University of Minnesota 1.
9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Project Plan Status Fred Best & Evan Richards 9 March 2004.
Selda HeavnerFIELDS iPDR – Antenna Electronics Board Solar Probe Plus FIELDS Instrument PDR Antenna Electronics Board Selda S. Heavner U.C. Berkeley
25-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : SMA Jorg Fischer, MAM Mars Atmosphere and Volatile.
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
C osmic R Ay T elescope for the E ffects of R adiation PERFORMANCE ASSURANCE BRIAN KLATT MISSION ASSURANCE MANAGER.
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) Instrument Preliminary Design Review Safety and Mission Assurance Jorg Fischer, PFP SMA Manager.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW Boom PER 30 June RBSP EFW Spin Plane Booms Greg Dalton Space Sciences.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
24-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : ATLO Support Dave Curtis Mars Atmosphere and Volatile.
24a - 1 NASA’s Goddard Space Flight Center Mission Assurance Ron Kolecki Senior Systems Assurance Manager August 16-17, 2005.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Overview and Status Keith Goetz University of Minnesota.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
SPP FIELDS DFB Quarterly June 16, 2015 Solar Probe Plus FIELDS Instrument Quarterly Q Digital Fields Board (DFB) 1.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept EFW INST+SOC PDR97 RBSP Electric Field and Waves Instrument (EFW) Product.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP-EFW SMA I-CDR RBSP EFW SMA Safety and Mission Assurance Instrument -
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 100 EFW DFB Systems Assurance Trent Taylor LASP.
June 16, 2015SPP/FIELDS SOC CDR: Integration & Test SPP/FIELDS Integration and Test SOC Critical Design Review Keith Goetz University of Minnesota
THEMIS Instrument PDRMission Assurance- 1 UCB, October 15-16, 2003 THEMIS Mission Assurance Preliminary Design Review Ron Jackson University of California.
1 MAVEN Documentation Training. Date September 12, 2011 Particles and Fields Package (PFP) MAVEN - FLT Traveler Book Documentation Training Safety and.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 1 STEREO Product Assurance Ron Jackson
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 100 EFW DFB Systems Assurance Trent Taylor LASP.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
FM4/FM5 IPSRSYS - 1 UCB, May 5, 2006 THEMIS INSTRUMENT SUITE FM4/FM5 PRE-SHIP REVIEW SYSTEM OVERVIEW Ellen Taylor University of California - Berkeley.
20-1 MAVEN iPSR Oct 30-31, 2012 Particles and Fields Package Pre-Ship Review October 30-31, PFDPU D. Gordon, W. Donakowski & PFDPU Team Mars.
MAVEN-SWEA Assembly, Integration & Test (AIT) Contents AIT: CESR Team Facilities Main subcontractors Applicable documents AIT documentation Cleanliness.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January Instrument Pre-Environmental Review Safety and Mission.
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) Instrument Preliminary Design Review Integration & Test David Curtis, PF Package Manager.
BonnellFIELDS iCDR – AEB Solar Probe Plus FIELDS Instrument CDR Antenna Electronics Board AEB J. Bonnell, D. Seitz UC Berkeley, SSL
Solar Probe Plus FIELDS V1234 Mechanical Pre-Ship Review May 26, 2017
SPP/FIELDS Quarterly UMN 27 September 2016
FIELDS Mission Assurance Manager University of California, Berkeley
FIELDS MEP Thermal Vacuum Cycling iPER
Solar Probe Plus – FIELDS SCM FM2 Instrument Pre-Ship Review
FIELDS MEP & V5 Pre-Ship Review Thermal Summary
Solar Probe Plus FIELDS V1234 Mechanical Pre-Ship Review May 26, 2017
Solar Probe Plus – FIELDS V1234 PA/Antenna Instrument Pre-Ship Review
Solar Probe Plus FIELDS MEP iPSR SOC Marc Pulupa April 10, 2017
Solar Probe Plus – FIELDS Main Electronics Package
EFW DFB Systems Assurance
EFW DFB Systems Assurance
Gayle K. Martin November 14, 2016
Solar Probe Plus FIELDS MEP i-PER Safety and Mission Assurance
FIELDS Mission Assurance Manager University of California, Berkeley
Solar Probe Plus FIELDS
Solar Probe Plus – FIELDS Main Electronics Package
EIDP Status. Solar Probe Plus FIELDS Main Electronics Package iPSR Management Apr 10, 2017.
THEMIS INSTRUMENT SUITE FM4/FM5 PRE-ENVIRONMENTAL REVIEW
FIELDS MEP & V5 Pre-Ship Review Thermal Summary
Solar Probe Plus FIELDS
Solar Probe Plus – FIELDS Main Electronics Package
THEMIS MISSION PRE-SHIP REVIEW
SPP FIELDS V1234 Thermal PSR
Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission
Solar Probe Plus – FIELDS Verification Instrument mini-PER (V5)
Solar Probe Plus – FIELDS V1234 PA/Antenna
THEMIS Mission Assurance
Solar Probe Plus FIELDS V5 Mechanical Pre-Ship Review April 10, 2017
THEMIS INSTRUMENT SUITE
FIELDS SCM Thermal iPER
FIELDS Keith Goetz Solar Probe Plus A NASA Mission to Touch the Sun
ISUAL Product Assurance
Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission
FIELDS Mission Assurance Manager University of California, Berkeley
0.0 Instrument Suite Name Presenter’s name
GLAST Large Area Telescope:
Integration and Test Organization Chart
Presentation transcript:

FIELDS Mission Assurance Manager University of California, Berkeley Solar Probe Plus FIELDS MEP Instrument Pre-Ship Review Safety and Mission Assurance Jorg Fischer FIELDS Mission Assurance Manager University of California, Berkeley jorg@ssl.berkeley.edu

iPSR Overview Safety & Mission Assurance SMA PER SUCCESS CRITERIA SMA ASSESSMENT Safety & Mission Assurance SMA  SAFETY: The status of safety data submissions, procedures, and verification activities indicate a proper maturity level at this point in the life-cycle. PAIP and Verification process is using the SMA requirements Matrix. SAFETY: All Hazardous Procedures have been identified, reviewed, and accepted by JHU APL. Descriptions of the FIELDS specific safety hazards are available in the backup slides. SAFETY: The identification of safety hazards for flight, range, ground hardware and operations is complete. A walk-through safety review of NPR 8715 with JHU APL was completed. ANOMALIES: The disposition and status of previous anomalies, deviations, and waivers have been assessed in their entirety and the identified risks are acceptable to proceeding. EEE parts and M&P: Approved or in process of approval ABPL, ABML, NCR Status list delivered to JHU APL NCRs/Waivers, EEE parts and M&P status to be presented.

FIELDS – NCR/PFRs NCR/PFR status list delivered (4/3/17) Delivered a complete list of all problem/failure reports generated against the equipment, including open or closed status NCR/PFR – Non-conformance/Problem Failure Reports: Total: 17, Closed by UCB SSL: 15 Fully approved, concurred by JHU APL: 14 In process at JHU APL for review and full approval: 1 (3/31/1/7) In process: 2 UCB/APL: 1 John Bonnell, DFB, UMN: 1, Keith Goetz, LNPS Subassembly NCs – Pre-power on – Q-Notes : All NC/Q-Notes are shared with JHU APL SMA. Part of the complete list of all problem/failure reports Total: 14, Closed: 14

FIELDS – Waivers WAIVERS/Deviations: Total: 14 Ref. FIELDS Waiver Summary Document: SPF_SMA_Instrument_Waivers Waivers are presented by the FIELDS SE, Keith Goetz The disposition and status of previous anomalies, deviations, and waivers for FIELDS have been assessed by JHU APL and UCB SSL SMA in their entirety and the identified risks are acceptable to proceeding.

FIELDS – M&P, EEE parts ABML delivered (4/3/17) MUA Total: 2, Closed MUA_2015-11 Spacecraft APTEK 6521 Outgassing – Approved MUA_2015-035 Niobium Molybdenum Outgassing All of the materials are Approved or Conditionally Approved with the exception Blanket Material – WIP. PAML: SPP-SMA-024B_v35_MPL_MIL_PAML_2017_03_31 ABPL delivered (4/3/17) EEE Parts: All ABPLs have been delivered. All EEE parts are approved by the PCB. The ABPL are in review at JHU APL.

FIELDS – Verifications, GIDEP Verifications, Inspections, Overview JHU APL, UCB SSL QA/SMA – on site, as needed Verifications per SMA Matrix performed with JHU APL SAM MIPs performed by JHU APL – no issues GIDEP and Alerts status – up to date Closed loop process in place, up-to-date, no issues SPP_GIDEP_ALERTS Total: 325 of 324 items closed for FIELDS 1 open, item 258, NASA Advisory : NA-GSFC-2016-01 (Dielectric Rupture Due to Protons in Components Incorporating High-Z Elements. It requires project radiation assessment) – JHU APL/GSFC review is in progress. Facilities/Training Facilities are ready for S/C integration and have been reviewed by JHU APL SMA. UCB SSL personnel completed JHU APL training for Magnetic Cleanliness, Cleanroom Protocol, and ESD Training.

SMA is ready to support the shipment of the instrument. iPSR FIELDS – SMA Shipping will be supported by QA personnel Review/Approved Shipping Documents ME review of shipping containers Monitor formal shipping events QA present for all critical shipping operations – moves, lifts. SMA is ready to support the shipment of the instrument.

iPSR FIELDS – SMA BACKUP SLIDES

FIELDS – SAFETY Hazard Descriptions: Acceleration: The Antennas deploy at a rate of approximately 18 degrees per second. A deployment takes approximately 6 seconds. While stowed on the spacecraft, non-flight restraints will prevent accidental deployment. The energy stored in each spring in the stowed configuration is 840 lb-in (95 J), but the hard stop of the antenna prevents the spring from unwinding all the way. The deployed mass is 248 grams. Pressure: Only Nitrogen doers. All personnel handling Ni is trained and certified by UCB EH&S. Training cert records are available for review, through SMA Temperature: All operators for solder operations are trained by NASA JPL and certified by FIELDS SMA. Hazardous Materials: UCB and JHU APL have appropriate hazardous materials storage and SDS available for polymeric materials and alcohol and follow required safety procedures.

FIELDS – Waivers Waivers/Deviations generated before Integration: CCR_008 – SPF_CCR_008_SCM_Thermal_Cycling. Affected Items: FIELDS SCM sensor Requirement: SPP Environmental Design and Test Requirements Document (7434-9039), Section 5.1.2 requires thermal vacuum cycling testing on SCM sensor component. Description of Change: The thermal cycling test in vacuum for SCM is a difficult test to perform. The sensor electronics is designed to be thermally isolated from the mag boom itself, from the sensor’s mounting hardware and from vacuum chamber thermal control plates. With such weak thermal coupling, we expect cycling in vacuum to take an unreasonably long time. Testing in air will speed the process markedly (e.g. 6h per cycle as opposed to 24+h per cycle). Deviation: Modify the requirement to allow thermal cycling in air as a substitute for thermal vacuum cycling. It would be expected to run more cycles and at more extreme temperatures. As follows: SCM 12 cycles in air from -60C (TBC) to +80C (heater set point is -50C) Rationale/Justification for Change (include names of peer reviewers): Cycling this sensor in vacuum would be very difficult. Cycling this sensor in air is straightforward and gives acceptable results. Risk Assessment: FIELDS believes that thermal cycling in air would actually be more effective at revealing workmanship problems in a limited duration test. The SCM sensor includes a number of EEE parts – all fully encapsulated in the 3d-Plus preamplifier structure. As such, testing in air with reasonable dwell times at temperature extremes will give good workmanship results. Waivers are presented by the Systems Engineer, Keith Goetz

FIELDS – NCR/PFRs PL Subassembly NCRs generated before Integration: NCR_001 – DCB SN001 3-D Plus SDL Workmanship, The root cause is incorrect soldering by the supplier of these types of modules (which require special attention during the assembly process). Use As-Is for FM spare and Build DCB FM2 Closed, (Vendor Workmanship) NCR_002 – LASP NCR 142400, DFB FM1, Electrostatic Discharge appears to have damaged two of the inputs on the SIDECAR ASIC, The assembly is at risk for ESD when being probed. Test operator error. DFB FM1 use for FM spare, build DFB FM2 Closed, (Vendor Operator Error) NCR_003 - AEB 01 and 02, J32 Digital Input Overvoltage, Improperly designed ground support equipment. was generated. GSE modified to conform to AEB input voltage. Aeroflex applications engineer confirmed and MRB agreed that our test setup did not damage the transceiver IC Closed, (Design Change) NCR_004 – LASP DFB SN1, SN02 NCR 145444A_146400A_145702A Rework. (1) U61, a Honeywell, 512K X 8 SRAM non-FM part installed, replaced with FM part. Reworked (2) before testing bent leads on U42 - assembly has not yet been powered up. Reworked (3) poor Common Mode Rejection between V1_AC and V2_AC, mismatch in parasitic capacitance at U55, Reworked. Closed, (EEE parts replacement and Design Change). NCR_005- LASP DFB SN1, 146340RevA Workmanship - U61 was mistakenly soldered on the assembly using the wrong orientation, Reorked. Closed, (Vendor Workmanship) NCR_006 – DCB FM1, DCB/AEB HSK Anomaly. Design - The issue is caused by inputs that exceed recommended (not absolute) operating conditions for op-amp input voltage. ECN_020 issued, Rework performed. Closed, (Design Change). NCR_007,008 VOID NCR_009 – DCB FM2, DCB FM2 missing R47. Resistor not installed. Process. Rework performed. Closed, (Design Change)

FIELDS – PFRs PL Subassembly NCRs generated before Integration: NCR_010 – DCB FM2 RFS V1 Input Over-voltage. Test operator error. Replaced two AD8001S devices, U10 and U14, that were exposed to the 0.3V over voltage. Rework performed. Closed, (Operator Error) NCR_011 – SCM NCR_012 – DCB FM2, DCB Disconnected +6VA rail. Absolute maximum input voltage on U134 is exceeded when the +6VA power rail turns on before other power rails. Design Error, Reworked Closed, (Design Change) NCR_013 –DCB FM2 Washer to GND during installation. Keepout zone. Operator and Design Error. Reworked. Closed, (Operator and Design error). NCR_014 – AEB1, GSE Short Circuit of 5V AEB1 Regulator. GSE inter-connect. Reworked. Closed, (GSE). NCR_015 – TDS FM1, TDS FPGA Daughter Board Alignment Pins. Layout/Design Error. Reworked. Closed, (Design Error). NCR_016 – TDS FM1, TDS Shows Corrupt Data. Layout/Design Error. As it happened, the TDS had another problem (reported in SPF_NCR_015) in which the daughter board could not be fully mated. This problem was due to a PWB layout problem that would not allow the proper mounting of the standard alignment hardware used on the connectors of the FPGA daughter board. The resolution of this problem was to remove all such alignment hardware from the TDS motherboard. This included the offending washer described above. So the problem almost corrected itself. Reworked. Closed, (Design Error). NCR_017 – MEP FM1, MEP Harness 110. Two wires in harnessing connecting AEB1 to TDS were inadvertently crossed. This connected theV5 signal output to ground. Analysis suggests that the only part affected by the short circuit is the OP-15 op-amp in the V5 preamplifier. At the time the problem was discovered, the V5 unit in use was an engineering model. Reworked. Closed, (Operator Error).

FIELDS – PFRs PL Subassembly NCRs generated before Integration: NCR_018 – LNPS FM1 – Need data form UMN (4/2/17) . OPEN, ( Error) NCR_019 – SPF-ANT-MEC 250, 374, 318, The laser welds on the Whip Clamps were done in a manner that resulted in embrittlement of the welded material, in short, welding technique and materials were the root cause. We performed a mechanical repair solution. authorized by the MRB, at the niobium-molybdenum joint. Each stub assembly will be disassembled and each whip lead will have the weld and wire carefully removed and then each whip lead will be machined in order to have the 0-80tap that will receive the screw, which in turn will hold the solder lug in. Re-Test was successfully performed OPEN 4/2/17 in signature process UCB Closed by UCB, (Design Change) NCR_020 –DFB FM2, Abnormal E-Field Signal Variation TVAC OPEN 4/2/17 WIP at UCB SSL, John Bonnell

FIELDS – JHU APL Training JHU APL Training Completed as of 4/3/17 ESD Training Cleanroom Protocol Magnetic Cleanliness Robert Abiad Greg Dalton Dave Curtis Bill Donakowski Jose Fermin Jorg Fischer Davin Larson Roberto Livi David Glaser Tony Mercer Miles Robinson Christopher Scholz Gayle Martin Amanda Slagle Chris Scholz Phyllis Whittlesey Daniele Meilhan  Brent Mochizuki Marc Pulupa Tim Quinn Chris Tiu

FIELDS – SMA VERIFICATION SMA MATRIX Requirements Verification File: SPF-SMA-01B_7434-9096RevB_Matrix_Verification