CYRIC beam Line (actual setup)

Slides:



Advertisements
Similar presentations
Electrical wiring for piezo movers piezo power supply strain gauges readout temperature probes 1 Frédéric BOGARD – LAL/IN2P3/CNRS – Jan 25, 2013 Electrical.
Advertisements

IEEE10/NSS R. Kass N A. Adair, W. Fernando, K.K. Gan, H.P. Kagan, R.D. Kass, H. Merritt, J. Moore, A. Nagarkar, S. Smith, M. Strang The Ohio State.
1 The World’s Leading Provider of Silicon Photonic Solutions BLAZAR 40 Gigabit QSFP Optical Active Cable Marek Tlalka VP of Marketing
Timeline on the laser setup Show a conceptual design on the metal box, 2 iterations Check design, i.e. all details fit the actual physical constraints,
Timeline on the laser setup Show a conceptual design on the metal box, 2 iterations Check design, i.e. all details fit the actual physical constraints,
Optoelectronic Multi-Chip Module Demonstrator System Jason D. Bakos Donald M. Chiarulli, Steven P. Levitan University of Pittsburgh, USA.
Timeline on the laser setup Show a conceptual design on the metal box, 2 iterations Check design, i.e. all details fit the actual physical constraints,
Irradiation Scanning System suitable for silicon & passive materials (with cooling) H Marin-Reyes R French P Hodgson K Parker P Dervan J A Wilson D. Parker.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.

Active Components Ron Logan Ramzi Sawires.
Conducting a Test Beam Experiment - Page 1 To begin with, elect an experimental spokesman, who can act as a coordinator. Survey the area to understand.
IEEE06/San Diego R. Kass N Bandwidth of Micro Twisted-Pair Cables and Spliced SIMM/GRIN Fibers and Radiation Hardness of PIN/VCSEL Arrays W. Fernando,
Ch4 Electronic Components Circuit/Schematic Symbols.
NETWORK CABLING Chapter 2
Status of the PiN diodes irradiation tests B. Abi( OSU), R. Boyd (OU), P. Skubic (OU), F. Rizatdinova (OSU), K.K. Gan (Ohio State U.)
DOIM Parallel Optical Link s: TX/RX S. Hou, R.S. Lu 19-Dec-2003, Lake Geneva.
Corner Raft Test Station Kirk Arndt, Ian Shipsey Purdue University LSST Camera Workshop SLAC Sept , 2008.
IEEE08/NSS R. Kass N Radiation-Hard/High-Speed Data Transmission Using Optical Links W. Fernando, K.K. Gan, A. Law, H.P. Kagan, R.D. Kass, J. Moore,
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
in non-hermetic 85/85 condition
Tray Factory Considerations Jean-Francois Genat UC LAPD Collaboration Meeting, June th 2010, Argonne. 1.
ECAL Monitoring System Ivan Korolko (ITEP Moscow) PRR, September 2004.
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
Electron Spectrometer Work Package Simon Jolly 19 th May 2014.
S.Hou, Academia Sinica Taiwan. 2Outline Optical links for ATLAS Laser-driver  fiber  PIN-driver LHC modules in service Rad-hard requirement for LHC/SLHC.
Optical Links CERN Versatile Link Project VL – Oxford involvement CERN VL+ for ATLAS/CMS phase II upgrade – Introduction and aims – Oxford workpackage:
RPC detection rate capability ≈ 1/ρ Float-Glass ( Ω-cm) RPC rate capability < Bakelite( Ω-cm) one. New kind of doped glass was developed.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
C. Issever, Oxford 1 Status of Radiation Proposal Focus on: Amendment to Proposal Radiation Protocols.
0 If you have set-up the equipment and are unable to access your service, call 1(888)ONE-ATT0/1(888) or for
JgimenoIWM-12/1/2004 Fiber Optic module 1 STUDIES AND DEVELOPMENT OF A FIRST FIBER OPTIC MODULE PROTOTYPE Javier Gimeno Vicente.
Free Space Optics Equipment Last Update Copyright 2011 Kenneth M. Chipps Ph.D. 1.
CBM Silicon Tracking System. Microstrip Detector Module Assembly and Test V.M. Pugatch Kiev Institute for Nuclear Research GSI (CBM experiment), Darmstadt.
New Small Wheel muon trigger optical module New Small Wheel muon trigger optical module S. Hou 2014/08/29 Academia Sinica.
Implementing a 10 Gb/s VCSEL Driven Transmitter for Short Range Applications Irfan N. Ali Michael C. Clowers David S. Fink Sean K. Garrison Jeff A. Magee.
Takeshi Matsuda LC TPC Collaboration March 5, 2008 TPC Endcap Materials.
11 June 2015 Thomas Bergauer (HEPHY Vienna) Belle II SVD beam Test SPS 2015 SPS users meeting.
15 February 2007Dirk Wiedner / LHCb1 Radiation Monitors for LHCb.
CMS pixel telescope at MTEST 1 A. Kumar, S. Kwan, A. Prosser, R. Rivera, M. Turqueti, L. Uplegger.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
LU and SEU testing at STAR and LBNL 88” cyclotron LU tests at STAR LU and SEU tests at the 88” cyclotron Test integration with IPHC Test plans IPHC – LBL.
1 Preparation to test the Versatile Link in a point to point configuration 1.Versatile Link WP 1.1: test the Versatile Link in a point to point (p2p) configuration.
Peter LICHARD CERN (NA62)1 NA62 Straw tracker electronics Study of different readout schemes Readout electronics frontend backend Plans.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
L4 BCC – 1 Sep 2011 F. Roncarolo, U. Raich L.Soby, J.Tan, C.Zamantzas, F. Lenardon, C.Vuitton, G-J.Focker.
Ageing tests of VCSELs in non-hermetic 85/85 condition Ageing tests of VCSELs in non-hermetic 85/85 condition S. Hou, 2014/08/26 Academia Sinica.
FGT Magnet C Assembly metric tons (59 US tons) -100mm thick steel plates -6.6m high x 3.1m wide x 1m deep (outer dimensions) -5m high x 2.25m wide.
MICRO-STRIP METAL DETECTOR FOR BEAM DIAGNOSTICS PRINCIPLE OF OPERATION Passing through metal strips a beam of charged particles or synchrotron radiation.
10/3/2003Andreas Jansson - Tevatron IPM review1 Tevatron IPM Proposed design.
Islamic Azad University, Bandar Gaz Ahmad Bahrami Subject article : Optical fiber Fall 89.
14-oct-2014 GEM detector configuration 1 12 stations: Z = 30 – 45 – 60 – 80 – 100 – 130 – 160 – 190 – 230 – 270 – 315 – 360 Stereo angles: 0 – 7.5 deg.
Radiation hardness of the 1550 nm edge emitting laser for the optical links of the CDF silicon tracker S. Hou 15-Jun-2004.
sTGC Router Optical Transceiver options
Pressure monitoring system for the CMS muon chambers
Next generation rad-hard links
A proposal to equip the high eta muon stations with High Rate GRPC
Overview & status of SEU Test Bench
BGV PIN Diodes & Trigger Updates
SVT front-end electronics
Hans Krüger, University of Bonn
Success is when preparation meets opportunity
LRXI Industrial KVM Extender
first light! new laser driver board (revD)
VCSEL drivers in ATLAS Optical links
MuCool Test Facility Instrumentation Update
SuperKEKb X-Ray Monitor
Installationsanleitung
SALTRO16 activities in Lund
LightBend™ 1xN Fiberoptic Switch
Presentation transcript:

CYRIC beam Line (actual setup) Router D-Link 612 Beam dump Faraday cup: Control has current readout setup (show on screen) Network (AS private): stand-alone Cat5 cable from outside C-32 to control room USB USB RJ45 panel RJ45 panel CYRIC setup Control Room USB Cat5 Stage Driver USB Cat5 USB Cat5 RS232 USB swith stage VCSEL Sample Beam monitor stage has ZnS, FC ZnS

Beam Monitor DAQ running on 717pu401, win7-64 with updated NI2014: 20150703 Beam Monitor DAQ running on 717pu401, win7-64 with updated NI2014: D:\suen-ds\Radhard\INER_CYRIC_2015\BeamMon_XY_Strip_FC \sampling strip\Non-BeamMonitor for TIA program_Ver FuXiong_LV2013 \BeamMon_XY_Strip_63+63(0.5mm)_CYRIC.vi (_CYRIC.vi is the copy of .vi modified at CYRIC for commnets) comments corrected for CYRIC strip map of flex cable, fit table are in (as the .vi version)

20150703 Motorized Stage control running on as-w7en, win7-64 with updated NI2014: D:\suen-ds\Radhard\INER_CYRIC_2015\Auto_Stage \20150603 2-Stage_hou-v2.vi 12800 is the fastest to move the log show history

Components to be irradiated CYRIC beam test Components to be irradiated Electronic components mounted on 100x100 mm2 Bakelite board (2mm thick ) material seen by a pass-through proton: Laser diode in TO-46 can, φ=6.6 mm: plastic holder, 50um glass, 500um GaAs, 2 mm Ceramic base, 100 um Cu can CMOS driver chips: 500 um Si chip in 4x4mm2 plastic package, on 1 mm PCB

Sample test, DAQ VCSEL Sample DAQ interfac GPIBUSB GM pin, cable Octopus – MT table cable to sample DAQ interface, NI USB 6009 opt-meter VCSEL Sample TOSA samples bare-die samples 6 mA power FTM-200 optical meter ST-LC fiber 6 mA LM317 boards , USB 5V

CYRIC beam Line (plan) Faraday cup: Beam dump connected Router D-Link 612 Was guessing that beam current to be setup privately Faraday cup: Beam dump connected to “Kiethley 6514”, recording current Network: stand-alone Cat5 cable from outside C-32 to control room USB RJ45 panel RJ45 panel Control Room Stage Driver RS232 USB USB Cat5 stage VCSEL Sample Beam monitor Kiethley 6514

Beam Line setup @INER Control Room Proton beam stage stage Beam monitor Sample Proton beam VCSEL Sample Beam monitor USB Faraday Cup stage stage Stage Driver 6514 GPIBUSB USB Cat5 Stage Driver RS232 USB @INER USB Cat5 6514 Beam Monitor 12V DC, USB Faraday Cup Kiethley 6514 GPIB-USB Control Room Cat5 USB Router D-Link 612 Stqge tables Driver box, RS232-USB sample stands YiDa Cat5-USB USB hub D-Link 612 RJ45 cables ASUS notebooks

Beam Line components @INER Beam monitor gas chambers, two sets, dimension 65x65 mm2 air gap sealed in layers of PCB. material seen by a pass-through proton: Set 1: two layers of 1mm thick PCB, with Cu strip (37 um thick) Set 2: three laysers of 1 mm thich PCB Faraday Cup @INER Laser Sample Beam monitor