Coal Line Longitudinal

Slides:



Advertisements
Similar presentations
Managing Hardware and Software Assets
Advertisements

Intelligent Pressure and DMA Management
Total Productive Maintenance

and Trend for Smart Grid
1 Union Pacific Railroad David Wickersham Chief Engineer, Western Region February 24, 2014.
Andy Rowland Head of Propositions BT Global Services January 2010 IRSE Seminar - Fibre Acoustic Monitoring.
GCAA Management Workshop Paul C. Atkins, 2/18/09 Paul C. Atkins, 2/18/09.
California Integrated Waste Management Board Agreement with Air Resources Board for Surveillance Assistance Special Waste Committee Meeting May 10, 2006.
1 Engine Protector Safe Rider Vehicle Technologies (Pty) Ltd PO Box 11376, Rynfield South Africa Tel./ fax Cell:
October 2008 International Rail Safety Conference 2008 Denver, Colorado, USA.
 This link is about how measuring stress has changed over the years to the present day.  These strain gauges are use to measure the amount of stress.
 Wireless, Web-Based Monitoring System  Alarm/Event Notifications by Text Message and or  VPN Connection for Fast Response to Alarms and Events.
Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Data Center & IT Monitoring Use Cases Regional Seminar Series Carolyn.
CNG STATION & GARAGE MODIFICATION CODES & STANDARDS Graham Barker Business Development Manager.
HEAVY AXLE LOADS ON SHORT LINES AND REGIONAL RAILROADS Georgia Railroad Association 5 th Annual Transportation Conference 5 th Annual Transportation Conference.
Copyright © Oracle Corporation, All rights reserved. Oracle Sales and Service Key Product Highlights Releases
VIKING Workshop – Hamburg, DE, March 2007 Best Practices in Monitoring Deployment, Hamburg, Germany Innovation in Monitoring VIKING Workshop “Best.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Current Job Components Information Technology Department Network Systems Administration Telecommunications Database Design and Administration.
Asset & Security Management Chapter 9. IT Asset Management (ITAM) Is the process of tracking information about technology assets through the entire asset.
What we can resolve and Our experience in the field of industrial solutions.
A smart signalling system for Indian railways Smart signalling system – user’s view Full capacity realisation Flexibility of movements Easy to operate.
Objectives: Identify problems that can occur if hardware is not properly maintained Identify routine maintenance that should be performed by users Identify.
University of Palestine software engineering department Testing of Software Systems Testing throughout the software life cycle instructor: Tasneem.
1 PTC 101 A primer for PTC PTC 101 A primer for PTC.
Workforce Scheduling Release 5.0 for Windows Implementation Overview OWS Development Team.
Presented by Macroeconomic Policy Division June 2015 Addis Ababa, Ethiopia Economic Forecasts.
TMALL 0141 Presentation v 1.0 Asset Management Bo Olsson Bucharest October 7th, 2015.
The European Gateway to TANKSAT The Ultimate Service for LPG Tank Telemetry MCS Europe Group Solutions.
Maintainance and Reliability Pertemuan 26 Mata kuliah: J Manajemen Operasional Tahun: 2010.
123rd Air Control Squadron Mobile network
I © 2015 Bentley Systems, Incorporated Andrew Smith, Feb 2016 How BIM can positively influence rail O&M.
MH...CH LECT-021 SYSTEMS CONCEPT Adopting a materials handling systems from overall optimization point of view. Adopting a materials handling systems.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Gary Rees UE Systems Europe Ultrasound for Preventative and Predictive maintenance.
Low Impact Light Rail Update. Forward plan: All contracts to be signed up by end of August All feasibility to be completed by end of 2014/14 financial.
LECTURE 5 Nangwonvuma M/ Byansi D. Components, interfaces and integration Infrastructure, Middleware and Platforms Techniques – Data warehouses, extending.
Using existing lifts in existing buildings to evacuate disabled persons Derek Smith Technical Director UK Lift and Escalator Industry Association.
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
Update & Overview. August 12, : Assessment and Action Challenges: Understand RTD’s people, practices, projects, challenges Compare with others.
DoD Lead Agent: Office of the Assistant Secretary of the Army (Installations and Environment) Department of Defense Voluntary Protection Programs Center.
Reactive to Proactive Approach to Track Maintenance on Indian Railways
Today´s Challenges of the Rail Infrastructure Industry
Part II AUTOMATION AND CONTROL TECHNOLOGIES
Constraints Space Load Capacity Costs Operating hours.
Divisional Engineer/East/Ranchi South Eastern Railway
2016 Maintenance Innovation Challenge
IC3 GS3 Standard COMPUTING FUNDAMENTALS Module
Florida Public Service Commission’s 2007 Storm Preparedness Workshop
CALIBRATION OF MEDICAL EQUIPMENT
Chapter 16 Supplement Maintenance.
15S Maintenance.
Increasing Asset Lifecycle through the application of Innovative Technology
OVERVIEW: POSITIVE TRAIN CONTROL (ptc)
Fire Door Inspections Qualified Training
Patti Caswell ODOT Maintenance and Operations Branch October 2017
Automation Topics: Elements of an Automated System
Experience with an IT Asset Management System
Designed-in Logic to Ensure Safety of Integration and Field Engineering of Large Scale CBTC Systems Author: Fenggang Shi.
Elements of Effective Signal Maintenance
Basic Check Link Principles
wRails Theoretical Track Geometry Data Input &
NAF Product Training.
TYRE MANAGEMENT SOLUTION
Technology Department Annual Update
Capitalize on Your Business’s Technology
ProZorro : Innovations in Digital Ex-Ante Monitoring Tools for Public Procurement in Ukraine Eliza Niewiadomska
Field installable, upgradeable and scaleable
Journey Centric Delivery Day 1 Live Plan
Presentation transcript:

Coal Line Longitudinal Rail Stress Project ENGINEERING & TECHNOLOGY

The Challenge Solution 50 – 60 % of all Perway train delays are stress related The Longitudinal Rail Stress Project provides a solution: to significantly reduce incidents and delays relating to rail stress and reduce required occupation time for testing and repair

A Solution is required for Early Detection of Rail Stress What is Rail Stress T E N S I O N Tension and Compression forces cause Rail Stress that may lead to a Rail Break or Kick Out A Solution is required for Early Detection of Rail Stress

Project Purpose To develop a wayside system that will monitor longitudinal rail stress in real time to enable better management of Continuously Welded Rail (CWR) The system should be able to warn against possible kick-outs and rail breaks The system should be a tool to plan and execute CWR maintenance The system should prevent… ……Derailments

CWR Measurement Methods currently in use 1. Cutting the Rail Accurate if measurements are done correctly Timeous operation –occupation is required Closure rail and welding is required Weakening the track structure 2. Lifting Frame Accurate if used properly Timeous procedure of loosening & fastening clips and requires occupation of selected section of line Only useable in tension conditions Frame upgraded to enhance accuracy and performance 3. Strain Gauging Extremely accurate with Digital measurements Usable in any stress condition High skill level required for initial installation Expensive

Olifants River Bridge – Ore Line Strain Gauging in use since early 80’s 16 Force measurement channels 2 Rail Temperature channels 2 Air Temperature channels 2 Concrete Temperature channels 4 Expansion gap deflection channels HBM UPM60 Scanning Unit

Olifants River Bridge – Ore Line Force & Temperature Continuous measurement of Rail Force and Air & Rail Temperatures Constant and Real Time monitoring allows operations to take action proactively – reduce train speeds or stop trains at alarm levels No derailments occurred since installation Outdated technology expensive to maintain Technological developments have improved Strain Gauge technology Enabled wayside recordings from multiple locations Improved methodology applied to Coal Line Pilot Project

Coal Line Pilot Site Selection Criteria Sites were selected on a priority basis: Tunnel entrances and exits Kick-out and Rail break areas Turnouts before/after deviations Long bridges Inside two tunnels (for comparison) Additional sites Site Selection Phase 1 Line 1: Vryheid – Richards Bay 98 Sites Line 1: Overvaal Tunnel 7 Sites Phase 2 Line 1: Ermelo – Vryheid Phase 3 Line 2: Remainder of Coal Line

Coal Line Pilot Wayside Intelligent Long Stress Management System Test Equipment Pilot Site Instruments covered with panels to protect against vandalism & on-track damage Operations takes action for train speeds and movement Infrastructure takes action for prioritising maintenance All the strain and temperature gauges are encapsulated for ease of application and re-usage Encapsulated gauges are manufactured by trained strain technicians adhering to strict QC measures ROCLA concrete cubicle containing Test Equipment Rail force and temperature measurement devices installed on tracks

DISPLAY

Installation / Rollout The Track Technology Centre is installing the system (start date: September 2006) A total of 26 Engineers and Technicians are utilized for the installation Coal Line Engineering Technicians are assisting and are trained in the operation and functionality of the system and its components A Coal Line signalling technician will be utilized for power supply purposes Target date for full operation of the system: July 2008

Coal Line Pilot Installation Overview

Test Results: 15 days (Left Rail) Date

iCOMS Main screen display Normal Warning Alarm

iCOMS Forecasting Prediction date Max air temp Est. Rail temp 24/06/2006 Max air temp 35°C Est. Rail temp 46°C

System Benefits Safety Assist in derailment prevention Warning system Rail break / kick-out detection Supporting data in the unfortunate event of an derailment Maintenance Intelligent maintenance Continuous CWR long stress measurements Maintenance management Maintenance cost savings Progress Continuous research possibilities due to system expandability Better understanding of track behaviour and CWR Expandability to instrument line 2 with minimal capital outlay Advantages to other maintenance actions (e.g. tamping & placing closures) System Users Coal Link Operations Centre Maintenance Managers Depot Engineers and Technicians Production Managers Technology Management (TTC) Viewer that will access data on the main server

Technological Development World first development : For future installations the Rocla concrete box is to be replaced by a smaller device mounted on mast poles or rail with own solar powered batteries

HARDWARE

Coal line project will be fully functional by July 2008 Decision Required Coal line project will be fully functional by July 2008 Require ROE and Regional Infrastructure participation in determining next priority routes / corridors for rollout in subsequent phases

Thank you for your attention The End Thank you for your attention

Measurement site breakdown Vryheid East Tintasdrift Dassieshoogte Lenjanedrift Engogweni Komvoorhoogte Bloubank Nhlazatshe Izolof Eqwasha Uloliwe T1 T2 T3 T4 T5 T6 T7

Measurement site breakdown Ulundi ILangakazi Intsamanzi Enqolothi Umunywana Isangoyana Emakwezini IDondotha Elubana Nsese RCB T10/11 T8 T12/13 T14/15 T16

Measurement site breakdown

Coal Line Pilot Installation Overview

HARDWARE

Maintaining WILMA Development of a complete maintenance plan Monitoring of warnings and alarms TTC and then NOC Maintenance of field equipment by contract