TGad Process Overview Date: Authors: January 2009

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0677r0 Submission May 2015 Slide 1 IEEE ah Closing Report for May 2015 Date: Authors: Yongho Seok (NEWRACOM)
Advertisements

Doc.: IEEE /1445r1 Submission TGad November 2011 Closing Report November 2011 Eldad Perahia, Intel CorporationSlide 1 Date: Authors:
Doc.: IEEE /0547r0 Submission May 2009 Menzo Wentink, QualcommSlide 1 IEEE TGz Montreal Agenda Date: May 10, 2009 Authors:
Doc.: IEEE /0393r1 Submission March 2008 Eldad Perahia (Intel)Slide 1 Orlando Liaison Report Date: Authors:
Doc.: IEEE /1583r1 Submission November 2011 Osama Aboul-Magd (Huawei Technologies)Slide 1 TGac November 2011 Closing Report Date: Authors:
VHT SG Report to EC Date: Authors: November 2008 April 2007
VHTL6 task group work plan proposal (VHTL < 6 GHz)
IEEE TGw March Agenda Date: Authors: May 2008
TGax March 2017 Closing Report
VHT SG Report to EC Date: Authors: July 2008 April 2007
IEEE aj Process Overview
TGac Documents and Timeline
Proposal for TGad Evaluation Methodology
TGad March 2010 Closing Report
TGad September 2010 Closing Report
Proposal for TGad Selection Procedure and Timeline
TGn Chairs’ Closing Report Waikoloa, HI 802 Interim – Sep ‘07
Proposed Modifications to VHT60 PAR
VHT SG September 2008 Closing Report
China MM-Wave (CMMW) Study Group - Introduction of CMMW PAR and 5C
VHT SG Report to EC Date: Authors: July 2008 April 2007
TGad July 2009 Closing Report
TGaf Waikoloa Closing Report
802.11af Liaison Report Date: Authors: November 2011
802.11af Liaison Report Date: Authors: January 2012
Task Group Process Overview
TGs Montreal Closing Report
TGad September 2009 Closing Report
VHT SG September 2007 Closing Report
TGad November 2009 Closing Report
Dec 2008 doc.: IEEE /0xxx Nov aa –Robust Audio Video Transport Streaming Atlanta Closing Report Date: Authors: Graham Smith,
TGad January 2010 Closing Report
TGaf Geneva Closing Report
IEEE aj Process Overview
VHT SG July 2008 Closing Report
Proposed Modifications to VHT60 PAR
TGaf San Francisco Closing Report
TGad March 2009 Closing Report
IEEE aj Process Overview
TGad July 2010 Editor Report
TGad May 2009 Closing Report
Denver Liaison Report Date: Authors: July 2008
May Liaison Report Date: Authors: May 2009
802.11bd Timeline Date: Authors: January 2019
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [A Brief Overview of Draft Approval.
TGn Closing Report Los Angeles, CA, US 802 Interim
IEEE P Working Group for Wireless Personal Area Networks
Task Group Process Overview
Proposed Modifications to VHT60 PAR
TGaf Waikoloa Closing Report
Proposed Modifications to VHT60 PAR
TGad Editor Report Date: Authors: May 2011 April 2007
TGad Editor Report Date: Authors: July 2011 April 2007
VHT SG November 2008 Closing Report
TGad March 2011 Closing Report
Proposed Modifications to VHT60 PAR
TGad May 2011 Closing Report
Timeline for the Light Communications TG
Nov 2011 Closing Plenary Motions
2019 March TGba Closing Report
802.11be Timeline proposal Date: Authors: May 2019
TGad Editor Report Date: Authors: March 2011 April 2007
VHT SG January 2009 Report Date: Authors: January 2009
TGae Closing Report – July 2011
TGad January 2009 Closing Report
November 11, 2010 Dallas, Tx Session #70
Simulation Scenario Floor Plans
TGad Task Group Document Open Items
Proposal for TGad Evaluation Methodology
TGad November 2010 Report Date: Authors: November 2010
Presentation transcript:

TGad Process Overview Date: 2009-01-19 Authors: January 2009 April 2007 doc.: IEEE 802.11-07/0570r0 January 2009 TGad Process Overview Date: 2009-01-19 Authors: Eldad Perahia, Intel Corporation Eldad Perahia, Intel Corporation

Task Group Steps Begin Task Group Create Selection Procedure January 2009 Task Group Steps Begin Task Group Elect Officers Create Selection Procedure Develop TG documents Begin Selection Procedure Confirmation vote Initial Letter Ballot Comment Resolution Recirculation Ballot(s) Initial Sponsor Ballot Recirculation Sponsor Ballot(s) Eldad Perahia, Intel Corporation

TG documents January 2009 Functional Requirements Similar to 11n document PAR Additional quantitative constraints Evaluation Methodology Combine best from both 11n’s usage model and comparison criteria documents 11n defined dozens of comparison criteria that were ignored 11n defined dozens of environments, use cases and applications, but in the end mainly focused on three simulation scenarios Discuss usage models and then define limited set simulation scenarios for MAC simulations Include point-to-point link test for functional requirements Define PHY simulations Physical layer impairments Define metrics Channel Models Impulse responses Path loss Antenna Define model per simulation scenario environment Eldad Perahia, Intel Corporation

Other considerations Coordination with TGac Coexistence Usage models January 2009 Other considerations Coordination with TGac Usage models In 08/1395: MAC functions, for example “Session mgmt” (seamless fallback from VHT60 and/or VHTL6 to 802.11n to legacy) Aggregation to support larger data units Space-time channel management Coexistence Liaison with 802.15.3c Liaison with 802.19 Eldad Perahia, Intel Corporation

Official Time Line for TGad January 2009 Official Time Line for TGad 12-2008: PAR approved 09-2010: WG LB Initial 05-2011: WG LB Recirculation 09-2011: Form Sponsor Ballot Pool 10-2011: MEC Done 12-2011: SB Initial 03-2012: SB Recirculation 07-2012: Final WG approval 07-2012: Final EC approval 12-2012: RevCom & Standards Board approval Eldad Perahia, Intel Corporation