PITT COUNTY SOLID WASTE & RECYCLING

Slides:



Advertisements
Similar presentations
Making Greenways Greener: Developing a Sustainable Trail in Ramsey County Ramsey County 2007 Lower Afton Road Trail Project By Commissioner Victoria Reinhardt.
Advertisements

East Hampton High School July 2013 – July 2014 Design Phases.
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Josephine County / City of Grants Pass Solid Waste Agency
Prepared by Denese Ballew and Brian Taylor from Land-of-Sky Regional Council Solid Waste Management Study for the Town of Waynesville.
Wake County Experience with Alternative Landfill Land Use Presented by: John Roberson, P.E. Director of Solid Waste Management Division.
C&D & MRFs Willamette Resources, Inc. Wilsonville, OR Armando Arellano, LEED AP BD+C, O+M Willamette Resources, Inc. Wilsonville, OR Armando Arellano,
Construction and Demolition Waste Management at UVM
Environmental Issues and Concerns Louisiana Dept. of Environmental Quality Debris Management.
Presented to SWAC February 16, 2012 City of Cleveland Automated Waste Collection And Curbside Recycling Program.
Mid-Florida Materials (MFM) (Division of Hubbard Construction) C&D Debris Disposal Facility Renewal of C&D Permit.
Solid Waste Management in Lincoln & Lancaster Co.  Private Waste Collection  Residential Menu of Service  Once or twice/week waste collection  Seasonal.
Salvage: It’s like destroying things, Only a lot gentler Blake Rainville Thomas Pinello Eammon Coughlin Peter Connelly.
Division of Pollution Prevention and Environmental Assistance Industrial Assistance Section John Burke
1 2 nd Informal Workshops on Draft Revisions to the Disposal Reporting System Regulations June 24, Diamond Bar June 26, Sacramento.
Adem.alabama.gov Regulatory Update Gerald Hardy Chief ADEM Land Division Southern Section AWMA Conference August 10, 2007.
Department of Public Works Non-Exclusive Solid Waste Collection Franchise System – Review September 29, 2014.
February 13, 2007CIWMB Board Meeting, SacramentoPage 1 Team Findings of the Market Assessment Action Plan (MAAP)
NAVIGATING THE STORM Disaster Debris Management March 2014 Ice Storm Chris Marriott Deputy Director – Field Operations Department.
Cargo Dock 16: Pre-Bid Meeting Presentation June 13, 2013.
Greg Shinaut Black Hills Energy City of Lincoln – Green Practices Consultant.
Sedgwick County Solid Waste Management Plan Update June 10, 2009 – June 10, 2010.
Organic Recycling at ECI “Helping to Build A Better Tommorrow" Rosetta Rose, Deputy Director of Procurement Services| Department of Public Safety and Correctional.
Local Jurisdiction Adoption of Construction & Demolition Ordinances Local Assistance & Market Development July 11,
CWMA Conference March 30, 2007 Will Burrows. Did you say “Wood”? Play (videos removed for downloadable version)
Construction and Demolition Waste Management at UVM.
Defeasance of the Solid Waste System Refunding Revenue Bonds Series 2003 Orange County Board of County Commissioners Meeting September 18, 2007 Defeasance.
Solid Waste – Exclusive Commercial Franchise P RESENTATION TO B OARD OF C OUNTY C OMMISSIONERS M ARCH 30, 2010 S PECIAL M EETING.
Proposed Demolition Processing Pilot Project. Background Northwoods Pilot Project – Results presented at MPCA Conference – 2000 Re-Use sheds constructed.
September 23, 2005 Local Hazardous Waste Management Program in King County Washington Program Funding.
Take the Risk out of Sustainability Willis Construction Risk Management Conference September 2013.
Solid Waste Management Plans Update Webinar Training March 5, 2014.
Phone: Fax: “Service with Integrity”
Kindersley Waste & Recycle: Landfill Impacts SWANA Regional Waste Management Workshop November 16, 2015 – Saskatoon, SK.
Region 2000 Solid Waste Management Initiative January 18, 2007 Virginia’s Region 2000 Local Government Council Briefing Region 2000 Solid Waste Management.
Status Report On Staff Review Of Board Regulations For Alternative Daily Cover, Food And Green Waste Composting, Farm And Ranch Composting, Compostable.
Keys to Successful Public Hearings Linda Hagthrop Public Information Officer County of Orange Integrated Waste Management Department Janice V. Goss, Director.
1. FY Proposed Budget Jamie Justice, Town Manager & Piet Swart, Finance Director April 26, 2016 Fiscal Year Proposed Budget 2.
Department of Environmental Quality Life-of-Site Permitting Required Changes to Solid Waste Management Rules 15A NCAC 13B March 10, 2016.
Recycling C&D Waste Instead of Landfilling. What CAN Be Recycled? Dirt Cardboard Drywall HDPE (5 gallon buckets) Clean white wood Metal Brick block and.
Recycling in the IVAR - region Sibiu, november 2009 Tron Ree, Chief engineer IVAR IKS.
Post-Consumer Reclaimed Asphalt Shingles in Asphalt Pavement February 2012 James M. Ross Asphalt Quality Control Manager Greenville Paving & Contracting,
Solid Waste Study Board of County Commissioners March 20, 2012 Orange County.
EASTERN MUNICIPAL WATER DISTRICT Public Access Areas Renovation Project – Update Debbie Hoffman, PE Civil Engineer II March 23,
BUDGET PROCESS & REVENUE & EXPENSE INFORMATION For FISCAL YEAR 2011.
Pier Partial GMP Proposal for Marine Structural June 1, 2017
COMPOSTING WHIRLIN’ WATERS
Portsmouth Solid Waste Disposal Critical Decisions
PUBLIC WORKS DEPARTMENT
The New Construction and Demolition Debris Waste Ban Amendments
Sun City Lift Station Odor Control Improvements
Construction Documents
A Joint Powers Authority of
Fauquier County’s Journey of Construction and Demolition
LAND RECLAMATION MARVIN BOATRIGHT Land Reclamation Specialist
Springbrook Estates Sewer Improvement Area Informational Meeting
Mecklenburg County Solid Waste FY 2018.
Designers’ Manual Overview and Chapter Contents
Designers’ Manual Appendix Contents
Solid Waste Management Plan 2012 Triennial Update
Solid Waste Division - Operations
Fiscal Year Recommended Budget Presentation May 14, 2018
NC WasteWise Training Workshop
Request by Councilmember Madison to reagendize the Desiderio Park Design for reconsideration September 17, 2018 Item 17.
Michael Etheridge “Retired” Recycling Coordinator
SWAC – Agenda 11/27/18 1. City of Bend – Southeast Development Plan
Solid Waste in Larimer County Yesterday – Today – and Tomorrow
SWAC – Agenda 1/22/19 1. Introduction / Approval of Minutes
Solid Waste Grant Program Information Session June 4, 2019.
SWAC – Agenda 10/23/18 Chapter 6 – Alternative Technology – Draft Findings 2. Chapter 7 – Draft Landfill Disposal Existing Disposal System Disposal Options.
Presentation transcript:

PITT COUNTY SOLID WASTE & RECYCLING C&D RECYCLING PROGRAM

Transfer Station Tipping Fees Residential Waste……………………..No charge Commercial or Non Residential Waste………………$45 per ton Construction and Demolition……. $40 per ton ****Household Fee $71 per year****

C&D DATA Materials Recycled 6,659 Tons of Shingles 261 Tons of Carpet 29, 384 Tons of C&D Received 17,236 Tons sent to the Landfill Materials Recycled 6,659 Tons of Shingles 261 Tons of Carpet 985 Tons of Gypsum/Drywall 60 Tons of Ridge Plastic 320 Tons of Metals 2,768 Tons of wood/pallets 30 Tons of Vinyl Siding 245 Tons of Cardboard Data is from fiscal year 2016 / 2017

C&D DATA March 2017 – September 2017 Materials Recycled 18,618 Tons of C&D Received 8,504 Tons sent to the Landfill Materials Recycled 3,798 Tons of Shingles 165 Tons of Carpet 740 Tons of Gypsum/Drywall 83 Tons of Ridge Plastic 215 Tons of Metals 3,568 Tons of wood/pallets 38 Tons of Vinyl Siding 333 Tons of Cardboard 344 Tons of Fines – (Used for Alternate Daily Cover-Starting Hauling in Oct.)

Picking Pad Sheet Rock Cardboard Carpet Wood/Pallets

Block/Brick/ Concrete Vinyl Metal Ridge Plastic

Manual Picking Vs Picking Line

How Did We Get There……. Visited facilities in Maysville, New Hanover County and Virginia. Met with equipment vendor. Obtained recommendations and budgetary cost. Prepared multiple concepts with cost estimates for evaluation and selected the preferred site layout. Met with NC Solid Waste Section regarding requirements. Discussed Storm water Management requirements with the city. Met with City Planning Department regarding site plan requirements. Obtained direction from GUC concerning the electrical service connection. Obtained survey information from previous surveys of the site. Operations Plan Amendment- Submitted to NC Solid Waste Section Site Plan Submission to the City of Greenville

Next Steps…. Prepared a summary of lessons learned from visiting similar facilities. Finalize equipment layout for optimal material flow and safety. Review with operations staff on site. Prepare Construction Documents. Vet the documents with County and Equipment vendor review. Obtain regulatory and local government approval. Let for bids. 2 Bids- One for the Equipment and one for the Building and Site Work. Construction began on September 6, 2016 Final Inspection completed on February 28, 2017. Began operating on March 1, 2017 Ribbon Cutting Ceremony April 5, 2017

Summary of Projected Costs Description Projected Cost Building $324,000 Foundation and Site Improvements $425,000 Electrical $40,000 Equipment, Shipping, & Setup $758,000 10% Contingency $155,000 Budgetary Construction Costs Estimate $1,702,000 Planning-Engineering-Construction Administration $98,000 Total Project Cost $1,800,000 Under Budget $149,000 Total Final Cost $1,799,851

Director of Pitt County Solid Waste & Recycling John Demary Director of Pitt County Solid Waste & Recycling john.demary@pittcountync.gov (252)902-3355