Elena Wildner, CERN EUROnu meeting Paris June

Slides:



Advertisements
Similar presentations
Mats Lindroos Will we ever do a beta-beam design study beyond the present CERN-Frejus baseline? Mats Lindroos.
Advertisements

RAL 27 April 2006The beta-beam task, EURISOL1 Status of the beta-beam study Mats Lindroos on behalf of the EURISOL beta-beam task.
CERN First Considerations to implement nuSTORM on the CERN site “North Area Neutrino Hub” E.Wildner, CERN Wednesday, March 27, 2013Elena Wildner,
25/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)
Now 2010: Beta Beams, Elena Wildner1 Beta-Beams Elena Wildner, CERN
Summary of Nufact-03 Alain Blondel NuFact 03 5th International Workshop on Neutrino Factories & Superbeams Columbia University, New York 5-11 June 2003.
Nufact 2008The Beta Beam WP1 Beta beam R&D status Elena Wildner, CERN on behalf of the Beta Beam Study Group EURISOL/Euronu.
Beta Beams Safety issues and WBS E. Benedetto and E. Wildner EUROnu Safety Workshop 9-10 June 2011, CERN Outline Introduction: the Beta Beams Tentative.
EUROnu Annual Meeting 2-4 June Beta-Beam Costing Exercise Elena Wildner, CERN 03/06/10 1 EUROnu Annual Meeting, 2-4 June 2010.
Loss problems associated with the acceleration of radioactive beams and what we can do about it A.Jansson f fermilab Loss issues (and ideas for solutions)
Moriond 2003M. Benedikt, S. Hancock Injection and Accumulation in a High Energy Ion Storage Ring Michael Benedikt, Steven Hancock AB Division, CERN.
Liquid targets for isotope production Jerry Nolen Physics Division, Argonne National Laboratory NuFact'11 XIIIth Workshop on Neutrino Factories, Superbeams.
Review EUROnu, Beta Beams, Elena Wildner1 Elena Wildner, CERN, For WP
05/02/08 EUROnu, Elena Wildner, CERN, 05/02/ EURO Beta Beams Kick-off meeting  Elena Wildner, CERN.
R.G. 7/09/20101 Options for neutrinos. R.G. 7/09/20102 Conventional beam from the SPS (1/3) Neutrinos using the SPS Nominal CNGS 732 km baseline from.
EUROnu mid-term meeting, RAL, Jan 2011 Beta-Beam Baseline Elena Wildner, CERN For WP4 19/01/ EUROnu mid term meeting, RAL, Jan 2011.
Mats Lindroos Future R&D: beta-beam Mats Lindroos.
Highlights of Tuesday’s session Machine aspects Copyright © Dale Carnegie & Associates, Inc.
J. Bouchez CEA/DAPNIA CHIPP Neuchâtel June 21, 2004 A NEW UNDERGROUND LABORATORY AT FREJUS Motivations and prospects.
EuCARD 1st ANNUAL MEETING, 2010 Progress on ion production studies for beta beams Elena Wildner, CERN 14/04/10 1 Rutherford Appleton Laboratory (RAL),
Andreas Jansson, Neutrino Workshop, ANL, March 3-4, 2004 Possible beta beam scenario(s) in the US Andreas Jansson Fermilab.
NuFact'06 WG3, Aug. 2006A. Fabich, CERNBeta-beam Ion Losses, 1 The EURISOL Beta-beam Acceleration Scenario: Ion Losses A. Fabich, CERN NuFact’06, UCIrvine.
AGS/Booster PP Setup Status Feb. 5, 2013 Time Meeting Haixin/Vincent.
CERN, 15/03/05EURISOL - Beta Beam Task1 EURISOL and the Beta-Beam Task Status and Planning Michael Benedikt Mats Lindroos AB-Department, CERN.
Status and Plans for EUROnu FP7 Design Study Status and Plans for EUROnu FP7 Design Study EUROnu = A High Intensity Neutrino Oscillation Facility in Europe.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
EUROnu, RAL, Summary Beta Beams, Elena Wildner1 Elena Wildner, CERN, For WP
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
4K Wave Cold in both rings PS gave us e-lens PS work during Day PP12 lattice test evening First Collisions Overnight Stores 109x109 Start Physics The Story.
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe Introduction Aims Structure Tasks Link to other activities Future dates.
A CCELERATOR S ESSIONS S UMMARY D AVE W ARK, I LIAS E FTHYMIOPOULOS Neutrino Strategy Workshop CERN, October 3, 2009 Outline  Show highlights from the.
MI/RR Operation Status Ioanis Kourbanis August 21, 2014.
Elena Wildner, CERN Beta Beams GDR Neutrino 20 juin 2012 to 21 juin 2012 at APC, Paris.
EUROnu Review: 14 th April 2011 EUROnu Introduction and Objectives Neutrino oscillations: much interest since 1 st paper in extension required to.
Orsay, 03/Feb/05EURISOL - Beta Beam TaskM. Benedikt 1 The Beta-Beam Task Status and Planning 02/2005 to 01/2006 Michael Benedikt AB-Department, CERN.
ELENA installation progress F. Butin / ELENA collaboration.
Summary of IAP comments from 2007 EURISOL Town Meeting
Status of the magnet studies in the ARCS (FLUKA)
IPHC-IN2P3/CNRS Strasbourg
Accelerator R&D for Future Neutrino Projects
A.Lachaize CNRS/IN2P3 IPN Orsay
A BASELINE BETA-BEAM Mats Lindroos AB Department, CERN
Beta-beams M. Benedikt, A. Fabich and M. Lindroos, CERN
Beam switching yard interfaces
Status of the beta-beam study
Elena Wildner CERN CA15139 Meeting, Sofia 15/
EuPRAXIA working package report
of secondary light ion beams
of secondary light ion beams
Acknowledgments: LIU-PT members and deputies, H. Bartosik
Future R&D: beta-beam Mats Lindroos Mats Lindroos.
Accelerator R&D for Future Neutrino Projects
Elena Wildner, CERN For the Beta Beam Team
Superbeams with SPL at CERN
Elena Wildner, CERN For the Beta Beam Collaboration
Status of the Production Ring for Beta Beams Studies
Beta beam R&D status Elena Wildner, CERN on behalf of
Collimation for beta-beams
W. T. Weng Brookhaven National Laboratory
ELENA Extra Low ENergy Antiproton Ring
Status of the BETA-BEAM Task within the EURISOL Design Study
E.Wildner, A. Fabich (CERN)
A High Intensity Neutrino Oscillation Facility in Europe
Muon Collider Magnet Technologies/Challenges
A High Intensity Neutrino Oscillation Facility in Europe
Joint session – Beta-beams
Beta-beams M. Benedikt, A. Fabich and M. Lindroos, CERN
Accelerators for Future Neutrino Facilities: Strengths and Challenges
MEIC New Baseline: Performance and Accelerator R&D
Concepts and R&D for beta beam facilities
Presentation transcript:

Elena Wildner, CERN EUROnu meeting Paris 12-15 June High-Q ion production Status of Production Ring for 8B and 8Li Optimization for neutrino flux Elena Wildner, CERN

European Strategy for Neutrino Oscillation Physics - II, Elena Wildner Outline Milestones & Deliverables ok! Status High-Q ion Production Optimizations for higher neutrino fluxes 2012-15-05 1 European Strategy for Neutrino Oscillation Physics - II, Elena Wildner

European Strategy for Neutrino Oscillation Physics - II, Elena Wildner High-Q ion production, 1 2012-15-05 2 European Strategy for Neutrino Oscillation Physics - II, Elena Wildner

European Strategy for Neutrino Oscillation Physics - II, Elena Wildner High-Q ion production, 2 2012-15-05 3 European Strategy for Neutrino Oscillation Physics - II, Elena Wildner

The Production Ring (8B and 8Li) Aachen Univ., GSI, CERN, ANL Production of 8B and 8Li C. Rubbia, EUROnu proposal Gas jet target: too high density would be needed vacuum problems Direct production with liquid Li film targets 2012-15-05 4 European Strategy for Neutrino Oscillation Physics - II, Elena Wildner

High-Q ion production, next ? 2012-15-05 5 European Strategy for Neutrino Oscillation Physics - II, Elena Wildner

High-Q ions, other rings ? 2012-15-05 6 European Strategy for Neutrino Oscillation Physics - II, Elena Wildner

Optimization for neutrino flux Do we need higher fluxes, and how much ? Where are the limitations ? Production Acceleration, losses Injection, Decay Ring (intrinsic, longitudinal merging) Storage Radiological issues Shielding of equipment 2012-15-05 7 European Strategy for Neutrino Oscillation Physics - II, Elena Wildner

Optimization for neutrino flux Do we need higher fluxes, and how much ? To be discussed by WP6 What do we gain by putting more ions? What do we loose by relaxing the SF? Much has already been done WP4 has been able to find directions of research 2012-15-05 8 European Strategy for Neutrino Oscillation Physics - II, Elena Wildner

CPV dependence on SF (Fréjus option) SF 2% seems sufficient for larger sin22q13 (0.6% used up till now) Permits higher fluxes and reach will increase (needs optimization) E. Fernandez, P. Coloma, C. Hansen, E. Wildner 2012-15-05 9 European Strategy for Neutrino Oscillation Physics - II, Elena Wildner

Optimization for neutrino flux Production: The main focus of EUROnu WP4 is isotope production 8B and 8Li production is the central research Difficult technical obstacles for 8B and 8Li Switch of focus: 18Ne (6He already in good shape) Good progress Production of 6He and 18Ne is our baseline 2012-15-05 10 European Strategy for Neutrino Oscillation Physics - II, Elena Wildner

Optimization for neutrino flux Acceleration, losses: In all machines we have intense ion beams We do not yet know the limits of what is possible What can be improved in the machines? Cost ? 2012-15-05 11 European Strategy for Neutrino Oscillation Physics - II, Elena Wildner

European Strategy for Neutrino Oscillation Physics - II, Elena Wildner Intensity Limits: PS & SPS Tune scans in PS 6He will survive, 18Ne needs resonance compensation (PS) Beam stability in the PS and the SPS still needs studies 2012-15-05 12 European Strategy for Neutrino Oscillation Physics - II, Elena Wildner

Optimization for neutrino flux Injection, Decay Ring (intrinsic, longitudinal merging) To what extent can we profit of relaxed duty factors ? Study of all machines, RF Bunching… To what extent can this help the acceleration ? 2012-15-05 13 European Strategy for Neutrino Oscillation Physics - II, Elena Wildner

Optimization for neutrino flux Storage How much can we store in the Decay Ring? Magnets, dumps, shielding 2012-15-05 14 European Strategy for Neutrino Oscillation Physics - II, Elena Wildner

Optimization for neutrino flux Radiological issues So far no show stoppers have been seen 2012-15-05 15 European Strategy for Neutrino Oscillation Physics - II, Elena Wildner

European Strategy for Neutrino Oscillation Physics - II, Elena Wildner Integration: PS, radiation studies (1) S. Damjanovic DGS-RP, CERN 2012-15-05 16 European Strategy for Neutrino Oscillation Physics - II, Elena Wildner

European Strategy for Neutrino Oscillation Physics - II, Elena Wildner Integration: PS, radiation studies (2) 2012-15-05 17 European Strategy for Neutrino Oscillation Physics - II, Elena Wildner

Optimization for neutrino flux Shielding of equipment Needs studies in all machines No evident show stoppers have been found 2012-15-05 18 European Strategy for Neutrino Oscillation Physics - II, Elena Wildner

European Strategy for Neutrino Oscillation Physics - II, Elena Wildner The CERN Beta Beam, now What is changing is mainly the production Decay Ring: Br ~ 500 Tm, B = ~7 T, C = ~6900 m, Lss= ~2500 m, g = 100, all ions 2012-15-05 European Strategy for Neutrino Oscillation Physics - II, Elena Wildner

European Strategy for Neutrino Oscillation Physics - II, Elena Wildner Production of b-active isotopes Aim 6He and 18Ne: 2 1013/s Targets below MWatt is a considerable advantage! What is changing is mainly the production 6He production exp. T. Stora, CERN-2010-003, pp. 110-117 2012-15-05 20 European Strategy for Neutrino Oscillation Physics - II, Elena Wildner

Templates PRSTAB (Latex) I recommend you download and unzip this: https://authors.aps.org/revtex4/revtex4-1.zip Also see https://authors.aps.org/ https://authors.aps.org/tips.html for other related information. 2012-15-05 21 European Strategy for Neutrino Oscillation Physics - II, Elena Wildner