Jeff Brinkhus Lei Jiang

Slides:



Advertisements
Similar presentations
IO Interfaces and Bus Standards. Interface circuits Consists of the cktry required to connect an i/o device to a computer. On one side we have data bus.
Advertisements

TRANSPORTATION TUESDAY
E4004 Surveying Computations A Two Missing Bearings.
PARTS OF A CIRCLE To understand and apply the vocabulary.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
DNAv6 Goals JinHyeock Choi, Samsung AIT
1 Routing and Wavelength Assignment in Wavelength Routing Networks.
Cooperating Processes Independent process cannot affect or be affected by the execution of another process. Cooperating process can affect or be affected.
Multistage Implementation Problem: There are cases in which the filter requirements call for a digital filter of high complexity, in terms of number of.
The Chemotactic Paradox Amie Cubbon Denise Gutermuth.
Lecture 7 Negotiating Strategy 1.Axiomatic (Nash) Bargaining 2.Connection to Alternating Offers 3.Voting, Stability and Group Decisions.
Network based System on Chip Part A Performed by: Medvedev Alexey Supervisor: Walter Isaschar (Zigmond) Winter-Spring 2006.
Lecture 12 CSE 331 Sep 30, Announcements Final exam: Dec 16, 11:45am-2:45pm, NSC 210 HW 2 solutions at the end of the lecture Mid term: Oct 16,
CSCI 4550/8556 Computer Networks Comer, Chapter 11: Extending LANs: Fiber Modems, Repeaters, Bridges and Switches.
Simulation with ArenaChapter 2 – Fundamental Simulation Concepts Discrete Event “Hand” Simulation of a GI/GI/1 Queue.
A = p 4 B = p 5 CP = E[ p 7, p 2, p 3, p 6, p 1, p 8 ] S[p 4, p 5 ] d min = d 45 Plane Sweep Algorithm for Closest Pair Problem E=Event QueueS=Status Queue.
Given Connections Solution
1 Lab #9 AC Circuits Activity #1 – Simulating a Low Pass Circuit Activity #2 – Building & Testing a Low Pass Circuit Activity #3 – Comparison of 3 methods.
DataTAC 5000 Network Base station ARLAN 640 ARLAN 690 InfoTAC Mobile workstation Server InfoTAC Ethernet Wireless LAN SAHWW Architecture.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
3: Transport Layer 3a-1 8: Principles of Reliable Data Transfer Last Modified: 10/15/2015 7:04:07 PM Slides adapted from: J.F Kurose and K.W. Ross,
6.6 Solving Radical Equations. Principle of power: If a = b then a n = b n for any n Question: Is it also true that if a n = b n then a = b? Explain in.
7 th Grade Language Arts. Definitions:  (noun) something that brings about a result or effect  (verb) to serve as the reason for something For example:
Timers. Known Problems: If you use PowerPoint 2007, PowerPoint will only allow you to link your flash components. In order for the flash component to.
EE141 Project: 32x32 SRAM Abhinav Gupta, Glen Wong Optimization goals: Balance between area and performance Minimize area without sacrificing performance.
3:00. 2:59 2:58 2:57 2:56 2:55 2:54 2:53 2:52.
Tunnel-based mechanisms for datacenter latency control Xinpeng Wei.
Solving equations with variable on both sides Part 1.
1 Phase Angle Measurement Using the Oscilloscope This procedure measures the phase angle difference between two sinusoidal waveforms connected to channels.
親愛的吉姆舅舅: 今天吃完晚餐後,奶奶說,在家 裡情況變好以前,您要我搬到城裡跟 您住。奶奶有沒有跟您說,爸爸已經 好久沒有工作,也好久沒有人請媽媽 做衣服了? 我們聽完都哭了,連爸爸也哭了, 但是媽媽說了一個故事讓我們又笑了。 她說:您們小的時候,她曾經被您追 得爬到樹上去,真的嗎? 雖然我個子小,但是我很強壯,
Warm Up  Use a ruler to draw a large triangle. Measure the angles of the triangle. Make a conclusion about the sum of the measure of the angles.
Barcelona Group Clermont Ferrand 11/12/2003 FunctionsFunctions Boards location and distributionBoards location and distribution CB block diagram CB block.
SHORTEST ROUTE PROBLEM A Networking Model Report for DPA 702 QUANTITATIVE METHODS OF RESEARCH By: ALONA M. SALVA Cebu Technological University.
Chapter 5 Concurrency: Mutual Exclusion and Synchronization Operating Systems: Internals and Design Principles, 6/E William Stallings Patricia Roy Manatee.
The Scientific Method Oceanography. Whales and their Sonar  In the oceans, where distances can be long and visibility can be short, many animal species.
 Types of communication systems ◦ Coaxial (Wired) ◦ Microwave (Wireless) ◦ Satellite (Wireless) ◦ Cable (Wired) ◦ Cellular (Wireless)
CSC311 Data Communication & Networking
“Language Mechanism for Synchronization”
Quiz: Driving a SAR ADC with a Fully Differential Amplifier TIPL 4103 TI Precision Labs – ADCs Created by Art Kay.
Module I. Fundamentals of Information Systems:
Solving Equations with Grouping Symbols
Logic Functions Pneumatics Module 7.
Micro-Solar Distance Learning Initiative
A lecture for Arduino Course, Winter 2017/18
Introduction to Data-Link Layer
Lecture 13 review Explain how distance vector algorithm works.
Top Fire Protection Services Ottawa available on Dubinskyconstruction
COMMUNICATION.
BACK SOLUTION:
Bullying Prevention Cyber Bullying.
Decision-directed Joint Tracking Loop for Carrier Phase and Symbol Timing in QAM Project 2 ECE283 Fall 2004.
More about DesignWorks
Chapter 9: testing a claim
فرایند تسهیلگری در مددکاری جامعه ای
TRANSPORTATION TUESDAY
TYPES OF CELLULAR JUNCTIONS:
Figure 7.1 Some queue operations. Figure 7.1 Some queue operations.
Discrete Event “Hand” Simulation of a GI/GI/1 Queue
PXD Alarms Florian Lütticke
Motion Graphs Time – Distance Graphs.
Typically for using the shared memory the processes should:
A simple network connecting two machines
Compound Inequalities and their Graphs
Motion Graphs Time – Distance Graphs.
Process Synchronization
Motion Graphs Time – Distance Graphs.
Myrinet 2Gbps Networks (
Baofeng Ji,Bingbing Xing,Huahong Ma Chunguo Li,Hong Wen,Luxi Yang
Direct Proportion – Higher – GCSE Questions – AQA
More concurrency issues
Presentation transcript:

Jeff Brinkhus Lei Jiang Feedback Jeff Brinkhus Lei Jiang

Mechanism 1 Buffer Buffer Internal Buffer Internal Buffer 2 4 3 P2S S2P Move data from internal buffer of S2P. So, the buffer is FULL! But, the internal buffer of S2P is empty. Data at (1, 2, 3, 4) are safe!!! When FULL, STOP! P2S can’t get data from the first buffer.

Simulation Waveform

Simulation Waveform

Simulation Waveform

Simulation Waveform

Simulation Waveform

Simulation Waveform

Problem Now, we assume S2P passes Buffer2_FULL signal to P2S side. (connect directly) But, is it all right? Long distance link. One direction communication. Another copy? The solution or new assumption.