Charge for the Technical Board Members of the Tesla Technology Collaboration (TTC)

Slides:



Advertisements
Similar presentations
ILC Global Design Effort 1 ILC SCRF (WG2) program GDE Status Debriefing Hitoshi Hayano 2008/2/25.
Advertisements

1 Collaboration%20Meetings/SMTF%20Collaboration%20Meeting.
COMP 208/214/215/216 Lecture 2 Teams and Meetings.
ILC PM Meeting S0 Webex Global Design Effort 1 S0/S1 Next Steps Lutz Lilje GDE.
WG3: Main Linac H. Hayano, C. Nantista, C. Pagani.
E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 1 Lorentz Force Detuning Eiji Kako (KEK, Japan)
Akira Yamamoto Project Manager, SCRF To be presented, April 19, 2009 AAP Review – SCRF Introduction AAP-SCRF-Introduction.
Cavity performance vertical test → horizontal test → CM test C.M. Ginsburg On behalf of the ILC Database Group with special thanks to Detlef Reschke, Lutz.
Cavity Productions at DESY DESY -MPY- FNAL Overview on the cavity productions Review of cavity performance Some conclusions.
Summary of Main Linac SCRF-part H. Hayano, ILC08 at UIC.
Cryomodule Design and R&D during the EDR phase Robert Kephart With input from the T4 CM Collaboration.
Summary of SRF WG, LCWS14 H. Hayano, A. Yamamoto.
D.Proch, DESY; GDE meeting Vancouver 06 Technical systems: Cavity Report Overview on costing activities for ILC –European costing method Overview industrial.
R.L. Geng, KEK September 9, 2010 Global Design Effort 1 Near Term ILC Gradient R&D R&D Specification and Standardization Gradient Gradient Yield/Scatter.
ML Planning for ILC08 First Pass + SCRF agenda Chris Adolphsen Hitoshi Hayano.
Global Design Effort 1 S0 Status High-Gradient cavities Lutz Lilje DESY supplement by H. Hayano 04Sep2008 EC
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
SCRF Meeting Fermilab, April 21-25, 2008 Draft agenda updated, April-10 General Agenda: 4/21: Cavity: Gradient R&D, performance, diagnostics (S0), 4/22:
A Satellite Meeting at IPAC-2010 SCRF Cavity Technology and Industrialization Date : May 23, 2010, a full-day meeting, prior to IPAC-2010 Place: Int. Conf.
TILC09 SCRF Session Global Design Effort 1 EU Status TILC09 SCRF Session Lutz Lilje DESY.
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
22 September 2006 Global Design Effort 1 The Global R&D Board Status Bill Willis GDE Columbia University.
On S1Global Writeup S1G Writeup Meeting Nobu Toge 1.
SCRF Cavity WebEx Meeting May 17, 2010 Reports from PM (10 min.) – Brief report from ILC-PAC – Industrialization workshop as IPAC satellite meeting, Kyoto,
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
General remarks: I am impressed with the quantity and quality of the work presented here and the functioning of the organization. I thank ILC and FNAL.
Global Design Effort Main Linac Technology System Kick-off Meeting Cavity Summary 20 Sept 2007 DESY Marc Ross.
SCRF Monthly WebEx Meeting Agenda 1.Report from PMs 2.Report from Group Leaders 3.Topics 1.Cavity Gradient and Yield re-evaluation 2.Update of.
Summary of SCRF Meeting Fermilab, April 21-25, 2008 April 25, 2008 General Summary and Further Plan: 4/21: Cavity: Gradient R&D, performance, diagnostics.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
ML-SCRF: Monthly WebEx Meeting April 4, Reports from PMs (20 min.) GDE activity and meeting plan Summary document of SCRF-Baseline Technical Review.
05/12/2011O. Napoly1 TESLA Technology Collaboration Beijing, 5-8 December 2011 O.Napoly, CEA-Saclay TTC Chairman Introduction and update since last meeting.
Technical Board Report TESLA Technology Collaboration Meeting, Dec. 5 – 8, 2011, IHEP, Beijing, China TESLA Technology Collaboration Meeting, Dec. 5-8,
TTC TB Nov.7, TESLA Technology Collaboration At Jlab, 5-8 November, 2012 Nobu Toge and Wolf-Dietrich Moeller Report from the Technical Board (TB)
A Proposal for FJPPL (TYL) Development of Frequency Tuners Optimization and Cryomodule Integration for 1.3 GHz SRF Cavities G. Devanz, F. Nunio, O. Napoly.
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
Hans Weise, DESY TTC Meeting, Milano, February 28 – March 3, 2011 Technical Board Meeting TESLA Technology Collaboration Meeting Milano, February 28 th.
05/12/2011O. Napoly1 TESLA Technology Collaboration JLab, 5-8 November 2012 O.Napoly, CEA-Saclay TTC Chairman Collaboration Board Report.
TTC Tech Board Report Dec 7, Frascati h edwards. Tech Board Topics to discuss 1) Cavity gradient issues. This is a critical issue and the TB meeting has.
Start of S2 Milestone Work H. Padamsee. Intro At KEK S2 meeting we decided to make a list of milestones and eventually cost S2 activities I tried to start.
05/12/2011O. Napoly1 TESLA Technology Collaboration Meeting Beijing, 5-8 December 2011 O.Napoly, CEA-Saclay TTC Chairman Collaboration Board Report.
19Jul06 Vancouver GDE meeting 1 S2 Task Force Status (String test definition) Tom Himel.
SCRF Monthly WebEx Meeting March 9, Report from PMs (15 min.) 1.Acknowledgements for completing S1-Global cold/RF test (A. Y.) 2.GDE meeting plan.
SCRF WebEx Monthly Meeting Agenda and Reports from PM
SRF summary accelerator WG
ILC Cryogenics Work Package Status and Plans
ILC R&D Board Meeting: SRF Cavities Status and Plans
Evolving an ILC focused SCRF Facility from the XFEL Infrastructure
WG-1 Session Cavity Performance Cryomodule Performance
DESY experiences on education and training of cleanroom team
ICFA Report to ICHEP 2016 August 2015 to August 2016 J. Mnich (DESY)
2009 TESLA Technology Collaboration Meeting at Orsay
Jiyuan Zhai ( IHEP ) TTC Meeting, JLAB, 6 Nov 2012
BAW Prep S1 Global Status Pilot Plant Status
2. SCRF General Preparation for the AD&I Preparation for AAP Review
2nd TTC Topical Workshop on « SRF Cryomodule Clean Room Assembly »
WG3: Main Linac SCRF(cavity,cryomodule)
COMP 208/214/215/216 Lecture 2 Teams and Meetings.
Nick Walker (DESY) EU GDE Meeting Oxford
EU-XFEL summary of performance degradation
Retreatment of Superconducting Cavities for the European XFEL
The S0S1 Taskforce: an Example of the Complexity for the ILC R&D Environment Lutz Lilje DESY Beijing ILC Workshop Global Design Effort.
Report of TTC-TB meeting at INFN-Milano
TTC meeting at Milano, 2011' Feb. .28
TTC meeting, Milano Global Design Effort
TESLA Technology Collaboration Meeting at Milano
Welcome & Introduction
Hans Weise, DESY February 5th, 2019
Report of TTC-TB meeting at TRIUMF, UBC
Introduction WG2 Martina Martinello, Oliver Kugeler TTC Meeting 2019.
Presentation transcript:

Technical Board Meeting TESLA Technology Collaboration Meeting Orsay, June 16th – 19th, 2009

Charge for the Technical Board Members of the Tesla Technology Collaboration (TTC) According to the MoU of TTC the Technical Board TB shall provide advice to the Collaboration on technical activities towards reaching the goals of the Collaboration Mission. To this end, the TB will compile information on the technology activities in different technical areas, provide findings and recommendations to the CB. … The TB can be described as the technical arm of the Tesla Technology Collaboration, TTC. As such its primary duties are to carry forward the technical program of the TTC. Much of the work to the TTC is carried out in, and as a result of, the semi-annual meetings of the TTC. Working Groups focuse on technical items of current interest as defined by the CB. The TB will discuss and lay plans for advancing the issues under consideration. Some activities of the TB and its members will be self-assigned while some will result from responses to requests from outside by leaders of the various projects which depend on superconducting RF.

TTC Technical Board Cavity: P. Kneisel (JLAB) L. Lilje (DESY) D. Reschke (DESY) K. Saito (KEK) R. Laxdal (TRIUMF) Coupler: E. Kako (KEK) W.D. Moeller (DESY) Module: N. Ohuchi (KEK) C. Pagani (INFN) P. Michelato (INFN) B. Petersen (DESY) T. Peterson (FNAL) T. Arkan (FNAL) Linac and and Integration: H. Edwards (FNAL) S. Michizono (KEK) S. Simrock (DESY) H. Weise (DESY) Chair Ex-Officio (per TTC MOU) Spokespersons of major test facilities TTF / FLASH: S. Schreiber ILCTA-NM (old SMTF): S. Nagaitsev STF: H. Hayano

TTC Technical Board Guests: O. Napoly (IRFU, CEA Saclay) N. Toge (KEK) M. Ross (FNAL) A. Yamamoto (KEK) Y. Yamazaki (J-PARC, KEK&JAEA) J. Mammosser (SNS) D. Proch (DESY) B. d’Almagne (Orsay)

General studies / common topics At the last TTC Meeting the TB decided to support the HF free electro polishing studies done at INFN Legnaro. CEA Saclay had/has also interest in further EP R&D and is looking into Buffered EP. For the latter R&D line see the talk of F. Eozenou / Saclay. For the first we unfortunately have no recent information and hope for the SRF workshop. Excitation of other pass-band modes was observed in many cavity tests. So far there is some understanding of the excitation mechanism. Is it multipacting? Where? Which modes are excited when / under which conditions? KEK and DESY have presented their findings. The DESY results are going to be published at the SRF workshop. The TB suggests to consider a summary report given at the next TTC Meeting together with a TTC Report. Since the last TTC Meeting some progress was made wrt. pressure vessel certification. We have some additional information from all three regions. The TB will ask the relevant TB members to take care of the preparation of an overview at the next TTC Meeting. Participation in ILC GDE discussions is assumed. Concerning the usable gradient the acceptable field emission limit was discussed. It was suggested to define a calibration procedure for existing Vertical Test Stands, i.e. a calibration source. Marc Ross is going to check if FNAL can work on this. The gradient yield is important for all larger projects since lots of money is involved here. The TB supports the clear distinguishing between process and production yield. The definition of both exists. Important: whenever the definition can not be used in the strict sense, explanations should be listed together with the yield plot. The key issue is: why to exclude which cavities from the statistics?

General studies / common topics (cont.) Around 2005 an overview about existing Cavity Preparation Infrastructure was produced. Since then two tables were established (KEK and within CARE, the EU funded projects). An update should be made for the next TTC Meeting with the help of the tables’ authors. Whenever projects arrive on the real axis some excellent R&D plans have to be stopped or paused. The TTC Meetings should be used to present the status of such activities with the hope that the baton can be passed to ‘some good friends’ in the SRF community. The TB would be happy to include more low beta cavity issues. As also discussed in the Collaboration Board the TB’s expertise should be strengthened as soon the relevant colleagues become regular participants of the TTC Meetings.