Insulating Gas Management Program

Slides:



Advertisements
Similar presentations
Chapter 2 Scuba Diving Tanks / Air Cylinders Valves
Advertisements

Sputter Stand Safety Specifics Electrical Hazards High Voltage : Electrical power is required for the high voltage supply, gauging, system controller and.
3.7.6 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Conducting Container Vapor Flaring Operations Before.
Working with refrigerants After studying this chapter, you will be able to Purge system with nitrogen. Pressurize system for leak detection Describe different.
Model GA11 March 2012 SF 6 Excellence Product Launch 1 SF 6 - Q uality-Analyser Zero emission Integrated Pump back Battery powered Graphic touch screen.
Fuels Systems Management Program CRTP First Nation Communities Types of Facilities Commercial (gas station); Industrial (remote Fuel Farms); Residential.
CIRCUIT BREAKER.
INSPECTIONS: WHAT TO LOOK FOR HERB WAGNER, DIRECTOR, OEHS UNIVERSITY OF ARIZONA LABORATORY FIRE SAFETY.
3.2.2 Student Book © 2004 Propane Education & Research CouncilPage Performing DOT Cylinder Evacuation and Vapor Flaring Operations Before DOT cylinder.
WELCOME The Fixed Fire Suppression Systems. We carry out the supply installation & Annual required maintenance in regard to the fixed.
Refrigerant Management
Placing Vapor Distribution Systems and Appliances into Operation MODULE 8 System Tests.
BOBTAIL DELIVERY OPERATIONS Bobtail Delivery Operations 1.
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
Joint ILC/CLIC Safety document ► Incentive for this document:  Share effort to define a coherent safety protocol for future linear colliders.  Insure.
© 2012 Delmar, Cengage Learning Chapter 12 Administrative Controls.
Student Book © 2004 Propane Education & Research CouncilPage Reducing Cargo Tank Vapor Pressure Using a Plant Compressor In order to use.
Sulfur Hexafluoride (SF6) Gas Handling. Description Sulfur hexafluoride (SF6) in its pure state is inert, nontoxic, odorless, nonflammable and colorless.
11/26/2008 Utility Water Hydro-Pneumatic Tank System & Recovery.
Submitted to: Submitted by:
3.1.8 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Conducting Container Vapor Flaring Operations Before.
1 Proposed Regulation for Reducing Sulfur Hexafluoride Emissions from Gas Insulated Switchgear California Air Resources Board February 25, 2010.
BC Timber Sales Fuel Handling A pictorial of key requirements of the BCTS FUEL HANDLING ENVIRONMENTAL FIELD PROCEDURE 06.
Greenhouse Gas Inventory and Reporting at SLAC National Accelerator Laboratory Kirk Stoddard Air Quality Program Manager June 3, 2009.
Standards Certification Education & Training Publishing Conferences & Exhibits Expanding LDAR Technology to Tank Vents and Compressor Seals Michael Webb,
Dr. W. Huisman Cairo, november 19th ISO 15189:2007 clauses 5.1 Personnel 5.2 Accommodation and environmental conditions 5.3 Laboratory equipment.
NFPA 99 – 2012 Building a better medical gas maintenance program.
1.  Career description: construct and repair structures and fixtures of various woods prepare cutting lines on materials with a ruler, pencil, chalk.
The copyright to this material belongs to the Korea Occupational Safety and Health Agency. Unauthorized use and distribution are prohibited. If an individual.
Group names  أبوبكر عبد المعز & عبدالله سلامه. Circuit breakers  Circuit breakers are be considered one of the most important component in power systems.
ETP 2161C Week #1 HV Power Circuit Breakers (Text book ref.) This course will refer to the following text book, chapter and page #. Power Line Worker:
© 2016 Global Market Insights. All Rights Reserved Gas Insulated Substation Market Trends and Forecast Gas Insulated Substation.
Comparison of AIS and GIS Grid Station Muhammad Ali Ashraf Management Associate (Electrical) CPP Project.
Sensistor ISh2000 Hydrogen Leak detector
Unit 11: Calibrating Instruments
© 2016 Global Market Insights, Inc. USA. All Rights Reserved Gas Insulated Switchgear Market Price, Packaging Trends, Industry Outlook.
HYDRAULIC AND PNUEMATIC ACTUATION SYSTEMS
Chapter 12 Administrative Controls
CIRCUIT BREAKER presented by: M Aamir sohail khan & sufyan saleem Dept, of electrical engineering bahaudain.
MICE Safety Review Meeting 4th Oct 2011 PJ Warburton - Daresbury Lab
1 Connect pumping equipment (group) with leak detector to insulation vacuum 1 or 2 pumping groups? connected to SB or CM or both? Which pumping group?
BC Timber Sales Fuel Handling
Chapter 9 Safety Permit Systems
DILO’s 2017 SF6 Gas Management Seminar Best Practices Dealing with Decomposition in Gas Insulated Equipment November 16, 2017 Neil Hutchins Equipment.
Nameplate Adjustments
Subsea 100 Global Services Products Presentation
DILO Company Inc. Zero Emissions. No Substitutes. Corey Ratza Cell#:
Monitoring, Reporting, and Reducing SF6 Emissions from the U. S
Chapter 14 HAZWOPER.
BC Timber Sales Fuel Handling
Do’s and Don'ts of SF6Gas Handling
Best Practices for SF6 Leak Reduction At Consolidated Edison Co. Of NY
SF6 Reporting Challenges
Spill Prevention Control and Countermeasures
Sulfur Hexafluoride (SF6) Gas Handling
Response of California Utilities to SF6 Emission Regulations
Voluntary SF6 Emission Reduction Partnership: Recent Achievements and Planned Activities Volha Roshchanka 14 November, 2018.
BC Timber Sales Fuel Handling
Overarching Commissioning Plan
TxMAG presentation
All rights reserved Gas-insulated Switchgear (GIS)
Chapter 12 Administrative Controls
SWITCH GEAR AND PROTECTION(IV-1) TOPIC-CIRCUIT BREAKER
CIRCUIT BREAKER presented by: M Aamir sohail khan & sufyan saleem Dept, of electrical engineering bahaudain.
History of SF6 High Voltage Circuit Breakers
CIRCUIT BREAKERS E. Chikuni. Circuit Breakers Mechanical Switches capable of making and breaking currents under normal circuit conditions and for a specified.
Voluntary SF6 Emission Reduction Partnership: Program Update
g3 Alternative Gas Solutions
Nameplate Adjustments
Uinta Basin Industry BMPs Stuart Siffring
Presentation transcript:

Insulating Gas Management Program Manitoba Hydro November 16, 2017 Doug Dyck Interrupting Equipment Maintenance Specialist Manitoba Hydro Canada

Outline Manitoba Hydro Background Insulating Gas in Manitoba Hydro Insulating Gas Management Program Chapter Title

Chaptier Title

Chapter Title

Chapter Title

Doug Dyck 2016 to present, Interrupting Equipment Section/IGMP 2014 – 2016, Insulating Gas Management Program (IGMP) 2013, Manitoba Hydro International in KSA 1996 – 2012, Interrupting Equipment Section 1985 – 1996, Electrical Technician, T&D Substations Chapter Title

National Grid Saudi Arabia Chapter Title

Insulating Gas in Manitoba Hydro Mid 70’s SF6 6 bays Siemens 230 kV Text Chapter Title

Insulating Gas in Manitoba Hydro Mid 70’s SF6 4 bays Alstom 115 kV

Insulating Gas in Manitoba Hydro SF6 (sulphur hexafluoride) Equipment operating temp of -50 ⁰C, SF6 is mixed CF4 (carbon tetrafluoride) or N2 (nitrogen) SF6/CF4 Full interrupting rating SF6/N2 Reduced interrupting rating

Gas Insulated Equipment (GIE) 230 kV Live Tank Circuit Breaker

Gas Insulated Equipment (GIE) 115 kV Dead Tank Circuit Breaker

230 kV Gas Insulated Switchgear (GIS) Gas Insulated Equipment (GIE) 230 kV Gas Insulated Switchgear (GIS)

Gas Insulated Equipment (GIE) 66 kV Dead Tank Circuit Breaker

Insulating Gas Management Program

Insulating Gas Management Program Educate, equip and empower all staff to work with insulating gas in a safe and environmentally responsible manner

Insulating Gas Management Program Environmental Compliance Central Services Standards & Procedures Certification Training

1. Environmental Compliance Government Regulations Insulating Gas Release Reporting Insulating Gas Inventory

1. Environmental Compliance Government Regulations Greenhouse Gas Emission Reporting CEA/EC Annex A: Emission Estimation and Reporting Protocol for Electric Utilities Transportation of Dangerous Goods (TDG) Material Safety Data Sheet (MSDS)

1. Environmental Compliance b. Insulating Gas Release Reporting Release Report CMMS Annual reporting

1. Environmental Compliance c. Insulating Gas Inventory Insulating Gas Inventory & Tracking Cylinder Storage Gas Insulated Equipment CMMS

Insulating Gas Management Program Environmental Compliance Central Services Standards & Procedures Certification Training

2. Central Services Operations Field Service Work Shop

2. Central Services Operations Procurement of: Insulating gas Cylinders Inventory control Shipping, TDG requirements Data entry to CMMS Operating Procedures: Instruments Equipment

2. Central Services b. Field Service

2. Central Services c. Work Shop

Insulating Gas Management Program Environmental Compliance Central Services Standards & Procedures Certification Training

3. Standards & Procedures Safety Testing & Instruments Monitoring & Detection Handling & Equipment Resource & Reference

3. Standards & Procedures a. Safety

3. Standards & Procedures b. Testing & Instruments

Multi-function SF6 analyzer 3. Standards & Procedures b. Testing & Instruments Multi-function SF6 analyzer

3. Standards & Procedures b. Testing & Instruments Pressure gauge Cylinder scale Gas detector Density Monitor Test Kit

3. Standards & Procedures c. Monitoring & Detection

3. Standards & Procedures c. Monitoring & Detection Density Monitor Testing

3. Standards & Procedures c. Monitoring & Detection

3. Standards & Procedures d. Handling & Equipment

3. Standards & Procedures d. Handling & Equipment Handling Processes Preparation Recovery/Reclaiming Evacuation Filling / Top-up

3. Standards & Procedures d. Handling & Equipment

3. Standards & Procedures d. Handling & Equipment Vacuum pump Gas compressor Gas collection bag Fill Kit

3. Standards & Procedures d. Handling & Equipment Equipment Adapters Hose Coupling

3. Standards & Procedures e. Resource & Reference

Insulating Gas Management Program Environmental Compliance Central Services Standards & Procedures Certification Training

4. Certification Training

4. Certification Training Insulating Gas Awareness CBT Level 1 – Testing & Handling Equipment Level 2 – Testing & Density Monitor Check Level 3 – Handling (no decomposition) Level 4 – Handling (with decomposition)

Insulating Gas Management Program 2. Central Services Environmental Compliance Insulating Gas Management Program 3. Standards & Procedures 4. Certification Training

Questions? Doug Dyck Manitoba Hydro 820 Taylor Ave (4) Winnipeg, MB Canada djdyck@hydro.mb.ca 204-360-4823