Introduction to the Midtown Express Project

Slides:



Advertisements
Similar presentations
I-96 Reconstruction/Bridge Repair Project City of Livonia and Redford Township Wayne County May 10, 2013 Association of the Council of Western Wayne Yankee.
Advertisements

CEM-512 Value Engineering Highway Project: South Interchange.
Congressional District Projects New CD-2 SH 392 Interchange at I-25: — Bridge replacement and widening, will also improve on/off ramps and frontage roads.
August 18, 2011 State Route 99 Auxiliary Lanes Project Route 32 to East 1st Avenue.
I-394 Express Lane Community Task Force March 18, 2004.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
S.R. 690 (118th Avenue) (C.R. 296). Agenda Introduction Alternative Analysis –Comparison of Compressed ROW and Viaduct –Why the Viaduct –Flyover Alternative.
75 Express Lanes Segments A&B Construction From NW 170 Street to South of Miramar Parkway Community Meeting Presentation Tuesday April 28, 2015.
Congressional District Projects New CD-1 Central Park Blvd/I-70 — $47.2 million project funded through the American Recovery and Reinvestment Act (ARRA).
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
The Roads Ahead Leroy D. Alloway, Director Community Development.
Congressional District Projects New CD-7 North I-25 Record of Decision (ROD): — Recently signed the Environmental Impact Statement (EIS), for the corridor.
Some things can’t wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
Status Report of the Alamo Regional Mobility Authority October 25, 2012.
Regional HOT Lanes Study Preliminary Findings An Informational Hearing of the Senate Transportation and Housing Committee Toll Roads and Managed Lanes.
Project Update: Airport Freeway, I-820 and I-35W Townhall Meeting for State Representatives Stephanie Klick and Jonathan Stickland Monday, May 12.
The Mobility Authority Story: Building for our Future.
Regional Transportation Council Mobility Plan Workshop North Central Texas Council of Governments November 12, 2015.
IH-10 Managed Lanes Project: A “Public-Public” Partnership ENGINEERS PLANNERS ECONOMISTS Wilbur Smith Associates Presented at the Value Pricing Conference.
SR 518 Interchange Restoration Pre-Bid Meeting 4/28/16.
Excellence - Integrity - Service - Creativity - Communication Courts of Canterbury HOA Meeting Rufe Snow Reconstruction Project Construction Update Keith.
GEORGE WASHINGTON HIGHWAY WIDENING PROJECT E.V. WILLIAMS, INC.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
Discussion of the Differences Public Works Law and Bid Law
I-66 OUTSIDE THE BELTWAY Shrevecrest HOA JUNE 21, Susan Shaw, P. E
UNIT 3 Foundations of Effective Driving
Orange County Transportation Authority
Thoroughfare Plan Update
City of New Braunfels Regional Transportation Planning Garry Ford, P.E., PTOE City Engineer June 13, 2017.
Sophie Rogers School for Early Learning Closure Dates
Southwest Parkway and Chisholm Trail Briefings
Est. Begin Construction
Four Winds Condominium Association August 2, 2017
Thank you for bringing us to where we are
Sully District Council of Citizens Associations January 25, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation.
UTILITY DESIGN SERVICES
CDBG-DR Public Meeting Thursday September 14, 2017
June 26, 2017.
Huntsville City Schools
Florida Gas Transmission 18-Inch Mainline Hydrostatic Test
DICKINSON AVENUE RECONSTRUCTION
2012 Sarasota Chalk Festival Overview Sarasota City Commission
The Oakton Condominium Association September 12, 2017
Huntsville City Schools
Southern Gateway Public Green Project Update
Florida Gas Transmission 18-Inch Mainline Hydrostatic Test
Tracking time spent here with us today WO# Task code: 886
General Tab Project, Cost Schedule, and Work Limits Roadway Character
CDOT North I-25 Express Lanes Update April 28, 2016
Malibu Canyon Pole Replacement Project Information
UND PARKING April 11, 2018.
Florida Transportation Commission FY 2009
Highway 169 Bridge Replacement & Pavement Resurfacing
I-69 Southwest/I-610 West Loop Interchange Reconstruction
SR 400 Express Lanes: Market Sounding
US 75 Improvement Study Thanks for attending the Texas Department of Transportation’s first Grayson County open house for the US 75 Project from FM 1417.
Project Planning Resources Management By Phaik San Liew.
Thanksgiving Day (11:45a – 11:45p) Christmas Eve (8:45p – 11:45p)
Ad-Supported TV Dominated Twitter’s Top 10 Trending Topics During Key Holiday Time Periods 75% of the aggregated top 10 trending topics across the five.
Background Incorporated as a city September 12, 1960, the City of Manvel was first settled in 1857 twenty miles southwest of Houston. During the 1960’s.
projects update ATLANTA district
Paris & DALLAS DISTRICT corridor PROJECTs update
General Tab Project, Cost Schedule, and Work Limits Roadway Character
NEDLAC PRESENTATION TO THE PORTFOLIO COMMITTEE OF LABOUR
A133 IPSWICH ROAD SCHEME COMMUNICATION UPDATE ( )
Metropolitan District | mndot.gov
Year 10 into 11 Transition Bishop David Brown School
January 2020 Proposed Service Changes Public Comment Meetings
Civics Corner Part 12.
Greater Pittsburgh Airport Area Property
Presentation transcript:

Introduction to the Midtown Express Project Lisa Walzl TxDOT Public Information Officer Selma Stockstill SouthGate Public Information Manager

Selma Stockstill SouthGate Constructors Public Information Manager Midtown Express Selma Stockstill SouthGate Constructors Public Information Manager

The Team – Who We Are

Interim Project Limits SH 183 – SH 121 to IH 35E SH 114 – International Parkway to SH 183 Loop 12 – SH 183 to IH 35E

The Contract Contract Type: DBfOM Estimated Interim Project Value: Design & Construction $847.6 million Public Funds $600 million Developer Funds $247.6 million 25yr O&M $199 million Interim Project Duration: Substantial Completion: 2018

One managed lane in each direction between SH 161 to Rochelle Additional Capacity: One westbound managed lane between SH 161 and International Parkway only Typical Section – International Pkwy to SH 161 Additional Capacity: One managed lane in each direction between SH 161 to Rochelle Typical Section – SH 161 to Rochelle

Typical Section – SH 121 to IH 35E Additional Capacity: One managed lane in each direction between SH 121 to I-35E. Reconstruct portions of mainlanes and frontage roads Typical Section – SH 121 to IH 35E Additional Capacity: One managed lane in each direction across the Trinity River Typical Section – Elm Fork of the Trinity River

Typical Section Loop 12- North Of SH 183 to I35E Additional Capacity: One managed lane in each direction between SH 183 and I-35E Note: Existing Frontage Roads to Remain in Place

How are We Phasing SH 114 Work? What you will see: Phase 1 – Move existing traffic into the center Phase 2 – Reconstruct outside ramps and general purpose lanes Phase 3 – Once complete, switch traffic onto these new general purpose lanes and build the toll managed lanes in the middle

Helping You Through Construction Selma Stockstill SouthGate Constructors Public Information Manager

Understanding Closures and Impacts Full highway closures – 14 days advance notice Major traffic switches – 14 days advance notice Closures in effect longer than 24 hours – 14 days advance notice Closures in effect less than 24 hours – 48 hours advance notice

“Blackout Dates” New Year’s Eve and Day Easter Weekend Memorial Weekend Independence Day Labor Day Weekend Thanksgiving Holiday Christmas Holiday

Be Prepared www.DriveMidtown.com

Be Prepared Sign up for the E-alert TODAY!

Other Ways to Engage Toll-Free Hotline – 844-4-183-114 Social media Facebook – DriveMidtown Twitter - DriveMidtown Mobile app launching soon Open House - May 7 (take a flyer) Business Owners’ Task Force – Coming soon

Questions