DT Infrastructure: LV, HV, Gas

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

DCS workshop 13-14/6/2005G. De Cataldo, CERN-CH and INFN bari1 Common FSM’s updates An exercise to design the standard FSMs for the DCS, the HV and the.
Winter shutdown 08/09 Summary of HV interventions Barrel Muon Workshop, 02/09 Jesús Puerta-Pelayo, CIEMAT 17-February-2009.
Year End Technical Stop DT work Mu Barrel Workshop 13 October 2011 A. Benvenuti (INFN Bologna)
Il sistema di HV del sottorivelatore DT S. Braibant, P. Giacomelli, M. Giunta, E. Borsato Bologna, 20/01/2007.
HV Report F.Cavallari (INFN Roma). High Voltage set-up in M0’ 2 channels each driving 50 crystals (100 APDs) 1 Crate hosting 1 board (final system). 1.
A3016 and MAO test at CAEN Pigi, A. Boaino & CAEN.
Barrel Maintenance Scenario for LS1 MUON-IB CMS week 11 December 2012 A. Benvenuti (INFN Bologna)
Low Voltage Power Requirement of TOF FEEs. Maximum tray. Low Noise:  Periodic and Random Distortion (PARD) < few mV RMS Floating.
CMS FPIX Reinstallation/Commissioning Lorenzo Uplegger 4/20/091.
Noise studies: hardware tests and preliminary results Anna, Anton, Giovanni, Pigi, Silvia, A. Boiano, A. Vanzanella.
ISR Work Progress Report Muon Week April 10 th 2003 A. Benvenuti INFN Bologna.
Status of TRD Chamber and Readout Electronics Integration Ken Oyama and Christian Lippmann for the TRD Collaboration Sep. 26, 2005 TRD status meeting in.
LV and HV status of the RPC system RPC detector and trigger group.
Low Voltage LB status RPC detector and trigger group.
Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling on YB Fabio Montecassiano INFN PH/CMM.
FEE + ROC cooling S. Popescu CERN, U. Frankenfeld, H.R. Schmidt GSI.
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
André Augustinus 6 October 2005 Cabling, Interlocks, Racks Some remarks.
André Augustinus 21 June 2004 DCS Workshop Detector DCS overview Status and Progress.
LHC 8:30 meetingEBH 1  Cryogenics recovery in point 8  Meanwhile a couple of accesses:  MKI investigation on noise in IP2  Insulation Vacuum.
r1Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling YB+2 and YB+1, extension to minus wheels and YB0, cables between UXC55 and USC55.
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
STATUS OF HO Sudhakar Katta TIFR, Mumbai India-CMS meeting, Delhi 27 th Sept 2007.
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
DT Hardware Status and Monitoring A.Benvenuti INFN Bologna Muon Barrel Workshop 28/09/2010.
Power Up of the First VELO Module at IP8 Eddy & Olaf on behalf of the VELO group.
“Breve” stato dell’apparato: Risultati e Problemi Anton, Ian, Nicolas, Saleh, Salvatore Barrel Endcap Endcap Endcap Cooling Endcap Cooling Last Minute.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
Muon Tracking Meeting SOR issue First priority Diagnostic: MCH DetectorScriptError Arriving at the initialization stage: the whole or part.
DT Shifter Training Infrastructure A. Benvenuti, M.Giunta 07/07/2010.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
P. Paolucci - I.N.F.N. of Napoli 1 RPC workshop, 2 march 07 RPC Power system P. Paolucci, G. Polese and D. Lomidze I.N.F.N. di Napoli.
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
24/03/2010ALICE TOF General Meeting March TOF hardware and data taking 2010 Andrea Alici Museo Storico della Fisica e Centro Studi e Ricerche “Enrico.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Preparation for production phase Web – New web with HV pigtail qualified (?) – Installed on 2 views in Technical run Very little effect on noise; detector.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
TOF status and LS1 plansTOF status and LS1 plans 27/06/2012.
 94 LVPS Packages mounted 4’-25’ from the front-end electronics.  4 modules per package. u +5V& -5V “Digital”, +5V & -5V “Analog” 18 A 1A 18A 18Amps.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
André Augustinus 13 June 2005 User Requirements, interlocks, cabling, racks, etc. Some remarks.
1 Top Level of CSC DCS UI 2nd PRIORITY ERRORS 3rd PRIORITY ERRORS LV Primary - MaratonsHV Primary 1 st PRIORITY ERRORS CSC_COOLING CSC_GAS CSC – Any Single.
TPC FEE status and more TUM Physics Department E18 I.Konorov.
TRIPLEGEM and VFATs at The Test Beam Area TRIPLEGEM and VFATs at The Test Beam Area N. Turini……reporter Eraldo Oliveri! Eraldo Oliveri main worker! N.
D. De Gruttola SALE-01: issues with HV supply fixed SALE-01: issues with HV supply fixed QA weekly meeting 26/04/2016.
S A Griffiths CM42 June 2015 Electrical & Control.
Power consumption (Watts) LBB27 ROS18 TSC50 TIM8 1 SC crate416 Alignment20 TOTAL per rack906~1 kW X2J22X2J02 With a water flow of 10 l/min, it should.
Integration and Services RE3/1 and RE4/1
Operation of CSC DCS Ryan Carroll Carnegie Mellon 29-Sept-2009.
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
DCS: Temperature Probes
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Introduction Status before the 2009 run Results from the 2009 run
DCS: Temperature Probes
Services – First Considerations Sigi Wenig / Nicolas Massol ATLAS Tracker Upgrade Workshop Valencia December 2007 Existing services (in cryostat.
CMS Area Working Group Meeting
Tracker cooling loop “check out” draft for discussion
WP02 PRR: Master Oscillator and RF Reference Distribution
Summary Friday h38: Ramp down and pre-cycle.
Pierluigi Paolucci - I.N.F.N. Naples
RPC HV&LV status Introduction HV power supply tender
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
RPC Detector Control System
Track Finder Crate, Backplane and Parts
HV-LV-DCS Status NEWS DCS Endcap Integration
Pierluigi Paolucci & Giovanni Polese
RPC Detector Control System
Presentation transcript:

DT Infrastructure: LV, HV, Gas CMS week 28 June 2011 A. Benvenuti (INFN Bologna)

A Few Problems Since May Workshop 5 Work Packages for LV related problems 6 WP for HV fixes Fan Tray Operation test (with Silverio Dos Santos) => It does not !

LV Problems In reality only two problems in YB-1: - A3100 Connector temperature - A3050 (MB1 MB2 S12) repeated power off due to high temperature interlock One UXC access was needed because the A3050 had lost communication due to the brutal switch off following the power cut. Was fixed by extracting and reinserting the module Vcon error on YB+2 MB3S12 only a modest temperature increase (but not the first time)

June 7, Temperature jumped to 37 °C MC OFF (May 24 @ 22:20) °C June 7, Temperature jumped to 37 °C MC OFF (June15 @ 22:16) MC OFF (June25 @ 07:12) YB-1 MB1, MB2 S12 LV Supply The A3050 switched OFF the MC on a high temperature interlock on May 24 ( 64°C), June 15(66°C) and June 25 (72°C) The first two instances were recovered quickly On June 25 , switching ON the MB1 MC caused again the interlock. The rest of the fill was taken with MB1 S12 MC off After the beams were dumped, ~13:20, the MB1 went ON, but we decided to replace the A3050 Looking at the error messages, I discovered two additional cases on February 10 and March 10 What should we do with this module? We can send it to CAEN but I am afraid they will not be able to reproduce the problem.

The temperature stabilized at 29.1 °C . Sensors Mounted on A3100 side Sensors mounted on cable connectors at SC side YB-1 Alarms started on June 24 ~13:00 as the temperature measured with V307 went above 27.7 °C The temperature stabilized at 29.1 °C . In UXC It was measured at 41.5 °C Disconnecting and reconnecting the cable brought V307 down to 25.8 °C The same incident occurred on May 20 The A3100 is in the same crate where we substituted the A3050 for MB1MB2 S12

LV Modules Temperatures The available cooling power is marginal for the crates with A3100 Check heat exchangers during next Technical Stop After the insertion trick the A3100 temperature dropped to 39 °C

HV Problems  16 Channels lost L2 16 Channels lost A876 Replaced 5 modules that failed in the detector but were OK in B904 were inserted in easy positions. OK so far YB-1 MB2S02, switched OFF while in STANDBY 3 DT stuck/tripped due to HV Spikes on wires while at step 1

HV Problems In Summary: 12 Chambers: 4MB1, 1MB2, 2MB3, 5MB4 6 in YB0, 2 in YB±1, 1 in YB±2 If the detector opens for the Pixels, priority to YB-2, we can recover 1 or 2 MB4

Planned Activities During Next TS Done Improving the TJB grounding consists of a few steps: - Substitute plastic cover with aluminum plate - add pigtail ground connection to TJB - close box with aluminum tape - connect ground shield on the cable with box - wrap everything with aluminum foil… Reduces synchronous noise (it can’t hurt) It is difficult to intervene on the TJB (if needed) 10 TJBs to be done Make the procedure simpler

Modified A3050s (Matteo) 4 Modified A3050 are in B904 Daniele will test them this Friday We will replace modules in YB0 sectors that already gave problems: MB1S01, MB4S02, MB2S10, MB3S04

Gas System Stable situation (no changes) YB0 H20 content (ppm) from March 08 to May 31 Stable situation (no changes) H2O content increased 30% (60% in peak) since March 8 O2 content in input lines varies from 82 to 106 ppm and from 89 to 103! In output Position of O2 spikes very stable N2 content measured in USG on common return line but data still not summarized H20 Content in peak from March 08 to June 14 It is summer, vacation time Decided with Roberto to consolidate: - O2 analysis cells calibration - H2O station calibration (YB0) - N2 last measured In September review some issues: Online gas chromatograph, H20 control (~400 ppm), O2 content (100 - 200 ppm)