Mitixa Jani Supervisor - Dr.Christopher Ward Dr.Sarah Dunnett Managing The Risk Of The Implementation Of Mechatronic Bogies In Rail Vehicles Mitixa Jani Supervisor - Dr.Christopher Ward Dr.Sarah Dunnett UKACC PhD Presentation Showcase
UKACC PhD Presentation Showcase List of Contents Introduction and Background Difference between present bogie and proposed new bogie Project Layout UKACC PhD Presentation Showcase
Introduction And Background New Project investigate using model based condition monitoring and FMEA for design low risk and low weight ‘Active Mechatronic Bogie’. UKACC PhD Presentation Showcase
UKACC PhD Presentation Showcase Why? Passive Bogie Not Track Friendly Heavy weigh and two stage suspension Low Risk Regular Maintenance Bogie operation is traditional way. Active Bogie Track Friendly Light weigh and one stage suspension High Risk Low Maintenance Bogie less operation using advanced condition monitoring and making efficient use of sensors for active control system Carriage side view End view UKACC PhD Presentation Showcase
Project Layout UKACC PhD Presentation Showcase Passive Vehicle Active Vehicle Future Work Low Risk? High Risk? Present Work Reliability Analysis/FMEA Literature Review Proposed Bogie Architecture Modelling and Simulation Reliability Analysis/FMEA Modelling and Simulation Risk? Risk? Condition Monitoring Reduce The Risk as Present Bogie level UKACC PhD Presentation Showcase
UKACC PhD Presentation Showcase Thank You M.Jani@lboro.ac.uk UKACC PhD Presentation Showcase