Procedures for the Design of Roads in Harmony with Wildlife

Slides:



Advertisements
Similar presentations
HELPING THE NATION SPEND WISELY Performance audit and evaluation: common ground with Internal Audit ? The UK National Audit Office experience Jeremy Lonsdale.
Advertisements

STATE OF TRANSPORT CLIMATE CHANGE ADAPTATION ACTIONS IN EEA COUNTRIES, RECENT EXPERIENCES Natalia Sobrino (TRANSyT- UPM) ETC/CCA Task Adaptation.
Alignment of COBIT to Botswana IT Audit Methodology
Interaction between EIA and Articles 6.3 and 6.4 of Habitats Directive Yvonne Scannell Law School, Trinity College, Dublin Arthur Cox, Solicitors, Dublin.
Project Monitoring Evaluation and Assessment
IEMA QMark Series Next Steps in Ecological Impact Assessment Steve Jackson-Matthews CEnv CIEEM MEECW October 2014.
“Building Effective Public Participation in Environmental Impact Assessment in a Transboundary Context” in Bulgaria Institute for Ecological Modernisation.
ISO General Awareness Training
The SPECIAL Project (Spatial Planning & Energy for Communities In All Landscapes) Contract No: IEE/12/762 8 March 2013 – 7 March 2016 June 2013.
An introduction to the EU and its legislation. Member States currently 15 –Austria- Ireland –Belgium- Luxembourg –Denmark- Netherlands –Finland- Portugal.
Facilities Management Category Management Plan Synopsis Version 1.1 (March 2015)
UNEP Training Resource Manual Topic 13 Slide 1 Aims and objectives of SIA are to: F analyse how proposals affect people F identify and mitigate adverse.
Evaluation methods and tools (Focus on delivery mechanism) Jela Tvrdonova, 2014.
TEN-T Experts Briefing, March Annual Call Award Criteria.
Gulana Hajiyeva Environmental Specialist World Bank Moscow Safeguards Training, May 30 – June 1, 2012.
Evaluation Plan New Jobs “How to Get New Jobs? Innovative Guidance and Counselling 2 nd Meeting Liverpool | 3 – 4 February L Research Institute Roula.
Participation in 7FP Anna Pikalova National Research University “Higher School of Economics” National Contact Points “Mobility” & “INCO”
DETERMINE Working document # 4 'Economic arguments for addressing social determinants of health inequalities' December 2009 Owen Metcalfe & Teresa Lavin.
EIAReview11.07(Gajaseni, 2007)1 Reviewing. 2 Reviewing is the process of EIA report assessment produced during EIA process is concerned with assessing.
Implementation and follow up Critically important but relatively neglected stages of EIA process Surveillance, monitoring, auditing, evaluation and other.
Mitigation and Impact management
SEA in the Czech Republic Prague, 24 September 2008.
Risk Management Standards and Guidelines
Bureau for International Research and Technology Cooperation Herlitschka 1 Warsaw FP6 Launch Conference - 26 Nov Small and Medium Enterprises -
UNEP EIA Training Resource ManualTopic 14Slide 1 What is SEA? F systematic, transparent process F instrument for decision-making F addresses environmental.
SUPPORTED BY THE EUROPEAN UNION’S OBNOVA AND PHARE PROGRAMMES EIA TRAINING RESOURCE MANUAL FOR SOUTH EASTERN EUROPE Reporting in the EIA process.
Pilot Project on implementation of SEA for regional planning in Ukraine Prof. Dr. Michael Schmidt Dmitry Palekhov Brandenburg University of Technology.
Professor Jim Lynch Chief Executive, Forest Research, GB.
Executive Order Environmental Stewardship and Transportation Infrastructure Project Reviews Priority Issues.
UNEP Training Resource ManualTopic 9 Slide 1 No EIA EIA Required *Public involvement Scoping Mitigation and impact management EIA Report Proposal Identification.
Working Group 1: Eionet nature October 2007
“HABITAT FRAGMENTATION TRANSPORTATION INFRASTRUCTURE”
by Trina Rytwinski Carleton University, Ottawa, Ontario
EIA approval process, Management plan and Monitoring
Eligibility and evaluation
Alison Donnelly Terry Prendergast, Mike Jones, Tadhg O’Mahony
International Energy Agency
BEST PRACTICES IDENTIFICATION
Tracking Progress for Building Efficiency Accelerator
Principles and Key Issues
ww.oecd.org/edu/evaluationpolicy
The European Investment Advisory Hub Support to CEF Blending
Guidance on Natura 2000 and Forests – Scoping Document
WORKSHOP 17th Sept 2008 EUROPEAN COMMISSION
Marine Strategy Framework Directive: an introduction
Alignment of COBIT to Botswana IT Audit Methodology
Twelfth Meeting of the Management Group on Statistical Cooperation
DG Environment, Unit D.2 Marine Environment and Water Industry
Reporting in the EIA process
Development of a protocol for identification of reference conditions, and boundaries between high, good and moderate status in lakes and watercourses (REFCOND)
Update of Guidance document on Wind ENErgy and natura 2000
London Water Directors Meeting
EC GUIDANCE ON IWT AND NATURA 2000 CHAPTER 3
Kerstin Sundseth, Ecosystems LTD
Albania 2021 Population and Housing Census - Plans
Cost Effectiveness Analysis Questionnaire Results
REPORTING ON DELIVERY OF EU BIODIVERSITY ACTION PLAN
WFD, Common Implementation Strategy  Water Scarcity and Droughts Expert Group Madrid, February 17, 2010.
Guidelines on the Mid-term Evaluation
Seventh Regional Public Procurement Forum, May , 2011
Analysis of the notification of compensatory measures
The Joint Action on Health Information InfAct
EUROPEAN TOPIC CENTRE ON AIR AND CLIMATE CHANGE
European Commission, DG Environment, Marine Unit
Meeting of PAP/RAC Focal Points, Split, Croatia, 8-9 May 2019
Finalisation of study report
5.b3 Monitoring & Reporting 2019
Guidance on Non-energy extractive industries & Natura 2000
ECA Special Report No 4/2014 Integration of EU water
Finalisation of study report
Presentation transcript:

Procedures for the Design of Roads in Harmony with Wildlife Eugene OBrien Roughan & O’Donovan Innovative Solutions, Ireland András Weiperth Centre for Ecological Research (MTA), Hungary Dennis Wansink Bureau Waardenburg, The Netherlands Georg Tschan National Road and Transport Research Institute (VTI), Sweden

CEDR Research Program – Roads and Wildlife The Conference of European Road Directors (CEDR) funded 4 projects in recent years: Harmony (www.harmony-project.net) SafeRoad (http://www.saferoad-cedr.org) SafeBatPaths and ECOROAD Three projects was selected: SAFEROAD – Safe roads for wildlife and people – Cost-efficient mitigation strategies and maintenance practices HARMONY – Procedures for the design of roads in harmony with wildlife and SafeBatPaths – Fumbling in the dark: Effectiveness of bat mitigation measures on roads They have presented some of their results at this conference allready

Roads in Harmony with Wildlife Harmony Topics Ecological Assessment - Environmental Impact Assessment - Appropriate Assessment Contract Procurement Project Appraisal Contract Performance and Follow up Maintenance - Road verges - Mitigation measures Today’s Presentation

Roads in Harmony with Wildlife Harmony Geographic Scope 7 main countries had all aspects examined: Austria, Belgium, Hungary, Ireland, Netherlands, Sweden, UK. 4 further countries had some but not all aspects examined: Denmark, Norway, Germany, Greece.

Ecological Assessment – EIA National Guidelines on Environmental Impact Assessments (EIA’s) Comparative analysis of national guidelines from 9 countries carried out using a review template of 20 questions. All countries provide guidelines that ensure compliance with EU legislation. 3 of the 9 countries did not have guidelines available for specific species or habitats. 4 of the 9 countries do not provide guidelines for all stages of EIA. EIA Analysis 100 EIA’s examined over 10 countries to identify the degree of implementation: Screening, Scoping, Identification of Habitats, Impact Assessment Methodologies, Mitigation measures and Monitoring

Implementation of each Stage Monitoring Mitigation measures Impact Assessment Identification of Habitats Scoping Screening

Ecological Assessment – EIA

Ecological Assessment – EIA Survey results For a significant proportion of the EISs, no surveys were carried out in the past two years. Cumulative impacts are not suitably addressed in a significant proportion of the EISs examined. Large proportion of the EISs examined do not include a plan for monitoring (not implemented in over 50%).

Ecological Assessment – AA National Guidelines on Appropriate Assessments Comparative analysis of national guidelines from 9 countries 2 of the 9 countries do not provide guidelines for AA’s Guidelines treat the significance of adverse effects, the difference between direct and indirect (external) impacts and mitigation. None of the guidelines have a paragraph about monitoring the impacts of a project or the effectiveness of measures. AA Analysis 44 Appropriate Assessments were examined in 10 countries. Experts examined each AA and filled out a 21 question template questionnaire.

Ecological Assessment – AAs % of AA’s Poor understanding of N2000? P:\Proj\2014\14214\14214-54-WEB & DISSEM\Conferences\IENE 2016 P:\Proj\2014\14214\14214-54-WEB & DISSEM\Conferences\IENE 2016

Ecological Assessment – AAs % of AA’s Poor understanding of N2000? P:\Proj\2014\14214\14214-54-WEB & DISSEM\Conferences\IENE 2016 P:\Proj\2014\14214\14214-54-WEB & DISSEM\Conferences\IENE 2016 Objectives of monitoring unclear?

Ecological Assessment – AAs % of AA’s P:\Proj\2014\14214\14214-54-WEB & DISSEM\Conferences\IENE 2016 P:\Proj\2014\14214\14214-54-WEB & DISSEM\Conferences\IENE 2016 Insufficient (or old) data to assess impacts?

Ecological Assessment – AAs % of AA’s P:\Proj\2014\14214\14214-54-WEB & DISSEM\Conferences\IENE 2016 P:\Proj\2014\14214\14214-54-WEB & DISSEM\Conferences\IENE 2016 Insufficient (or old) data to assess impacts? Poor because AA integrated in EIA

Ecological Assessment – AAs % of AA’s P:\Proj\2014\14214\14214-54-WEB & DISSEM\Conferences\IENE 2016 P:\Proj\2014\14214\14214-54-WEB & DISSEM\Conferences\IENE 2016 Insufficient (or old) data to assess impacts? Poor because AA integrated in EIA Significance of adverse effects objectively demonstrated?

Ecological Assessment – AAs % of AA’s Poor understanding of key terms? P:\Proj\2014\14214\14214-54-WEB & DISSEM\Conferences\IENE 2016 P:\Proj\2014\14214\14214-54-WEB & DISSEM\Conferences\IENE 2016

Ecological Assessment – AAs % of AA’s Poor understanding of key terms? Cumulative effects not properly assessed? P:\Proj\2014\14214\14214-54-WEB & DISSEM\Conferences\IENE 2016 P:\Proj\2014\14214\14214-54-WEB & DISSEM\Conferences\IENE 2016

Ecological Assessment – AAs % of AA’s Poor understanding of key terms? Cumulative effects not properly assessed? P:\Proj\2014\14214\14214-54-WEB & DISSEM\Conferences\IENE 2016 P:\Proj\2014\14214\14214-54-WEB & DISSEM\Conferences\IENE 2016 Insufficient mitigation?

Ecological Assessment – AAs % of AA’s Poor understanding of key terms? Cumulative effects not properly assessed? P:\Proj\2014\14214\14214-54-WEB & DISSEM\Conferences\IENE 2016 P:\Proj\2014\14214\14214-54-WEB & DISSEM\Conferences\IENE 2016 Insufficient mitigation? Overall poor quality?

Ecological Assessment – AAs % of AA’s Poor understanding of key terms? Cumulative effects not properly assessed? P:\Proj\2014\14214\14214-54-WEB & DISSEM\Conferences\IENE 2016 P:\Proj\2014\14214\14214-54-WEB & DISSEM\Conferences\IENE 2016 Insufficient mitigation? Overall poor quality? Unclear conclusions on adverse effects

Contract Procurement and Follow-up Procurement Interviews Used phone interviews with a questionnaire to gather information. Questionnaire consisted of 27 questions, split into two parts: 10 questions on procurement. 17 questions on follow-up. 14 interviews carried out over the 10 countries.

Procurement – Contract Strategies Contracting Types Four contracting strategies:

Procurement – Recommendations Road Authority needs ecological expertise and resources to advise & monitor contractor Quality Assessment in the procurement process should include ecological requirements Specialist ecologists need to be engaged for implementation and monitoring in the procurement of large Works and Maintenance Contracts. The use of performance based specifications would lead to better ecological outcomes

Key Performance Indicators (KPIs) Contract Performance and Follow up Key Performance Indicators (KPIs) KPIs should be easy to measure and compare, taking the Environmental Impact Statement into account A baseline should be established for each KPI KPIs should be considered during procurement process KPIs should show if a mitigation structure is functioning KPIs should include incentives and penalties Two possible indicators are: Road kill (according to a pre-specified process of measurement); and Usage of crossings (using a pre-defined method of measurement and pre-specified target species)

Roads in Harmony with Wildlife Procedures for the Design of Roads in Harmony with Wildlife Website www.harmony-project.net Acknowledgement This project is being funded by the CEDR Transnational Road Research Programme