22/06/2016 Andy Blue & Maeve Conway (Ohio State)

Slides:



Advertisements
Similar presentations
PC Tips & Trouble Shooting I didnt know that! Short Cut Keys Short cut keys are an easy way to complete tasks on a computer.
Advertisements

Configuring APACS & AAN Controllers
MICE Electronics Upgrade P J Smith (University of Sheffield) J Leaver (Imperial College) 17 th June 2009.
04/02/2004 az Outer Tracker Distribution Boxes 1 EFNI H K Outer Tracker Distribution Boxes Ad Berkien Tom Sluijk Albert Zwart.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
Online Chess Project 3 Due date: April 17 th. Introduction Third in series of three projects This project focuses on adding online support –2 players.
Molly, Gwyn, Sam, and Eric.  Configure DACs to have their digital input set to zero (2.5V) when they receive power  Ramp up to higher voltage at a “user.
“Power Supply” Controls Voltage Difference in Voltage is set Output Current is “as requested” by attached device.
1 ONE TIME PRINT SETUP To print Requisitions from Banner, follow this process once: Open Microsoft Excel, select (1) TOOLS, then (2) MACROS, then (3) SECURITY.
PROBE CARD INTEGRATION IN pALPIDEfs TEST SYSTEM ALICE | ITS-MFT Mini-Week | | Markus Keil.
Getting started with Microsoft.NET Gadgeteer Comberton Village College Gadgeteer Club.
Low Voltage Power Requirement of TOF FEEs. Maximum tray. Low Noise:  Periodic and Random Distortion (PARD) < few mV RMS Floating.
Computers in the real world Objectives Understand what is meant by memory Difference between RAM and ROM Look at how memory affects the performance of.
Move Pictures From Your Mobile Phone to Your PC.  You never know when a photo opportunity is going to arise, which is why having a camera phone can be.
1 WP3 Bi-Weekly Meeting Activities at Liverpool 1.Evaluation of Compact DCDC converter Designed to match up to an ABC130 module 2.Status of FIB’d hybrid/module.
Installing and Using MySQL and phpMyAdmin. Last Time... Installing Apache server Installing PHP Running basic PHP scripts on the server Not necessary.
Hello We are looking for a coder to code the following We have a network that has different sites: we need an application that will scan the network and.
Stave DAQ Updates. Testing two collobarative software websites Wiki 22ATLAS_Upgrade_- _Stave_DAQ%22#Code_Versions.
Muon System Safety Issues Burkhard Schmidt.
D0 Workshop Bagby, Foglesong John Foglesong Run 2B SMT Low Voltage Power The present location of the SMT DC power supply units creates a problem.
Andy Blue Glasgow Update. Andy Blue WP3 Meeting Summary ESD Protection –Part all arrived and installed Compressed Air Controls –New lines and panel being.
Birmingham Update Module bonding (Sam and Simon) Great difficulty bonding on to patterned glass ASICs. (OK on sensor). After 1 st two rows of bonds, abandon.
ROBOX with Multi Anode PMT’s Status and plans A.Mestvirishvili, I. Schmidt, S. Sen, F. Ozok University of Iowa.
Source Controller software Ianos Schmidt The University of Iowa.
Birmingham update: making modules? ASICS to hybrid Gluing: many trials i) heated plate with silver loaded (8 hybrids i.e. 1 panel per day) ii) UV cured.
Proposal for an Open Source Flash Failure Analysis Platform (FLAP) By Michael Tomer, Cory Shirts, SzeHsiang Harper, Jake Johns
Network Topologies Created by: Ghadeer H. Abosaeed June 22, 2012.
Update from Birmingham Phil Allport, Daniel Briglin, James Broughton, Andy Chisholm, Laura Gonella, Kostas Nikolopoulos, Simon Pyatt, Juergen Thomas, John.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
MCast Errors and HV Adjustments Multicast Errors (seen on the DATA ERIS connection) have caused a disruption of a HV Adjustment due to a timeout (since.
Helen Heath, Magnus Loutit.  Useful meetings at CERN before Easter ◦ ML and HH met with John Fullerton from BE for practical advice on the CEDAR motor.
Programming and Debugging with the Dragon and JTAG Many thanks to Dr. James Hawthorne for evaluating the Dragon system and providing the core content for.
How to Recover Deleted Contacts from Samsung Phone How many phone numbers do you save on your contact list? As a matter of fact, as you use mobile phones.
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
Inside a Computer. Computer Hardware/Software What is the difference? Computer Hardware.
Berkeley status Aug 10th, 2012.
Unit Hardware Troubleshooting
ElComandante An ELaborate Computer Operated Modular Accessible Nested Data Aggregation Network Testing Environment.
Programming and Debugging with the Dragon and JTAG
Status of NA62 straw electronics and services
Annual Performance Management Cycle Management Training Tutorial
TOF Low Voltage and High Voltage Systems Vahe Ghazikhanian UCLA Department of Physics and Astronomy V. Ghazikhanian July 21, 2005.
How to use Library Kindle Books
How to use Library Kindle Books
→ need to guide UV light into gap; also beware temp effects
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
Injectors BLM system: PS Ring installation at EYETS
ITK Strip Module Meeting; 12st October 2015
Testing and Configuration for VMM1 on the mini-MMFE
Constructional requirements from ITk-Strips
Status of the Merlin Readout System
DT Infrastructure: LV, HV, Gas
FlowArm PLTW Programming
Next steps – with notes from during the meeting 17 March 2016
Next steps - with notes from during the meeting 24 March 2016
Introduction to Computers
USB Project (22nd July) Ian Coulter.
7/10/2017 John Podczerwinski, Horatio Li
ADC32RF45 Testing.
HOW TO CREATE A CLASS Steps:
Use USB_DAQ to Complete the Calibration of PGA309 EVM
US Rod Burn-in Readiness DAQ Hardware/Power Supplies
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Blue Goose Technology Solutions, Inc.
RapidFinder Analysis Software How-To Guide
ACO & AD DCS Mario Iván Martínez H..
Hardware needs (ARCS) Current ARCS capabilities at both sites should be able to keep up with production assuming software changes Automatic I-V curves,
HP Printer In Error State
Epson Error Code 0x98 Fix for Epson Error Code 0x98 in USA | Epson support 247.
RT9114B GUI User Manual V3.0.
Presentation transcript:

22/06/2016 Andy Blue & Maeve Conway (Ohio State) Glasgow Work 22/06/2016 Andy Blue & Maeve Conway (Ohio State)

DAQLoad Testing the DAQload again Has issue with Stave09 Adapter Card Losing connection (And very loose) so no bias (or leakage current) Found a spare and will use/solder that Was still able to work on the DAQ

Testing regime Capture the HCC Address (Capture  Capture HCC Address). HCC ID = 22 Capture the Chip IDs (Capture  Capture Chip IDs) Chips = 25 Run the iDelay scan (Capture  iDelay Scan) This test will likely crash root unless you have done the SVN update. Version 3961 does not work. Run the Strobe Delay Test (Test  Strobe Delay (0.40)) Results was 14 and 16. The PDF file name is in now in the format (YYYYMMDD_HHMMSS). Run the 3 Point Gain Test (Test  3PointGain @ 1fC). There is high noise as it was unbiased. All scans work fine Using Trunk SVN (from yesterday)

DCS Building up our DCS for the DAQ testing High Voltage Low Voltage Temperature Interlock In the past (2013) I presented how I Integrated these with SCTDAQ/HSIO Details on page here https://twiki.cern.ch/twiki/bin/view/Atlas/ITSDAQHvLvInterlock This week myself and Maeve went through this using the trunk ITSDAQ/ATLYS We used NI:GPIB USB Cable which we attached to the computer and to the power supplies

High Voltage Start by adding ‘TkHVdll.vcproj‘ to yours ITASDAQ project Creates the necessary dll file Using Keithley 2410 From Root gSystem ->Load(“khdvll.dll”) Keith= new TkHV (“GPIB::20::INSTR”) Note: the number in the middle of the code is noted to be 24 on the website, but this has to be changed for your on IRQ number keith->Ramp(V,I,b) where V is the required voltage , I is the current compliance limit (in uA) , b is the ramping factor , which is either 1,2,3 or 4 *(50, 20 1 and 5V/s repectively) However not working as yet Every value for ‘I’ returns the error ‘Has be below -2.35344e-185uA.’

High Voltage For GUI use Edit the Rootlogon.C file in c://sctdaq For ‘switch(hvtype)’ case Change ‘Int_t hvtype’ from ‘0’ to ‘1’ number in the middle of the code to 20 (i.e. “GPIBO::20::INSTR”) We renamed HV driver to “Detector Bias”

Low Voltage Using TTI TSXC3510P For GUI use Edit the Rootlogon.C file in c://sctdaq For switch(lvtype) Change ‘Int_t lvtype’ from ‘0’ to ‘1’ number in the middle of the code to 6 (i.e. “GPIBO::6::INSTR”) Rename the LV driver to “TTI Low Voltage” Mistake we made. Don’t change ‘Int_t nHVSupplies = 0’ This may be because the program adds one to whatever number you input and then looks for that amount of drivers. If you input 0, it will add 1 and look for only 1 driver.

GUI Now, Under DCS on the BurstData, there should be HV RampUp, HV RampDown, HV Status, LV On, LV Off, LV Status, and LV Adjust.

Interlock Working on it Getting a fault ST [11] locker = new TILock("ASRL10::INSTR") failed with code 0xbfff0015 -> Timeout expired before operation completed. Mon: viWrite failed with code 0xbfff0015 Mon: viRead (2) failed with code 0xbfff0015 Status is UNKNOWN:-( (class TILock*)0x791440 Working on this with help from Bruce and Peter

Plans The HVRampup/HVRampDown is hard wired to 200v in 5v steps Might look to change this Would like to integrate IVScan into the GUI as well Test the interlock And update the twikis

DAQ Testing iDelay, StrobeDelay, and 3PointGain Test with DAQ board Acquire ATLYS board, IB board, DAQ board with ABC130 chip, Ethernet cable, 16IDC Cable, PC, and voltage supply Connect PC to ATLYS board using Ethernet cable Connect ATLYS board with IB board using VHDCI Connect IB board to DAQ board using 16IDC Cable Connect DAQ board to the power supply for bias Start up Root 19 January 2016 Dima Maneuski