Director’s Update AT Users’ Committee -- November 2016

Slides:



Advertisements
Similar presentations
Australian Report -- The view from down under
Advertisements

SKA New Technology Demonstrator Ray Norris CSIRO Australia Telescope National Facility.
Science Operations Phil Edwards 30 October 2012 Space for collaborator logos [delete instructions before use] CSIRO ASTRONOMY & SPACE SCIENCE.
Square Kilometre Array (SKA) Project PRE-CONSTRUCTION PHASE Briefing for Industry & Science Organisations Tuesday 14 th August Wellington.
ASTRONOMY & SPACE SCIENCE Lewis Ball CASS Director Director’s report ATUC Nov 2014 CSIRO ASTRONOMY AND SPACE SCIENCE.
CSIRO ASKAP Science Data Archive (CASDA) Project Kick-Off IM&T AND CASS Dan Miller| Project Manager 17 July 2014.
Spectrum Management: Parkes & ATCA Briefing for ATUC members CSIRO ASTRONOMY AND SPACE SCIENCE Erik Lensson | Head, ATNF Engineering Operations 30 October.
ATUC Meeting Project Update CSIRO Astronomy and Space Science Antony Schinckel, ASKAP Director 30 October 2012 ATUC Meeting | Antony Schinckel | Page 1.
Decadal Plan UNSW, 17 Dec 2004 Australia Telescope Operated by CSIRO as a National Facility since 1990 As a National Facility, the Australia Telescope.
ASKAP and DVP David DeBoer ASKAP Project Director 15 April 2010 Arlington, VA.
ATUC, Marsfield Phil Diamond, Chief of Division 28 June 2011 CSIRO Astronomy and Space Science ATNF: Director’s Update.
MWA Project:. Site: Murchison Radio Observatory Australia’s proposed SKA Site Strategy: 512 Antenna “Tiles” Explore “Large N / Small D” regime Correlate.
Mopra Time Allocation Mopra publications performance Mopra time allocation statistics Mopra Large Projects Proposal applications for 2012 APRS Jessica.
Australian Radio Astronomy Facilities Tasso Tzioumis Australia Telescope National Facility CSIRO Spectrum Management Coordinator
Technologies for Radio Astronomy Graeme Carrad | Assistant Director - Engineering Mark Bowen | Group Leader – Front End Technologies JULY 2012 CSIRO ASTRONOMY.
1 | CSIRO ASKAP Science Data Archive (CASDA) – Stage 0 Project Intent Statement Confirm the necessary requirements, use cases, workflows, business processes,
Mark Bowen Acting Theme Leader – Technologies for Radio Astronomy CSIRO Astronomy and Space Science 14 October 2010 Australia Telescope Users Committee.
Recent Developments in Australia Phil Edwards Head of Science Operations CSIRO ATNF.
LBA Calibrator Survey Chris Phillips eVLBI Project Scientist 23 July 2009.
Transition from SKADS to PrepSKA Richard Schilizzi Lisbon, 3 October 2008.
ATUC meeting Director’s Report Lewis Ball May 2009 GASS Image McClure-Griffiths & the GASS team.
Focus on 128T Steven Tingay. Where are we? Prior to NSF proposal review, I prepared a contingency plan in Australia - use Australian-only (and Indian,
The SOC Pilot and the ATOA Jessica Chapman CASS Observatory Operations Research Program Leader 28 June 2011.
Science Operations Philip Edwards Head of Science Operations 29 October 2009.
ATUC meeting Director’s Report Brian Boyle November 2007.
Netherlands Institute for Radio Astronomy 1 ASTRON is part of the Netherlands Organisation for Scientific Research (NWO) LOFAR Operations and Schedule.
CRISP & SKA WP19 Status. Overview Staffing SKA Preconstruction phase Tiered Data Delivery Infrastructure Prototype deployment.
EVLBI and the Australian SKA Pathfinder (ASKAP) Prof. Steven Tingay Curtin University of Technology Perth, Australia 7th eVLBI workshop SHAO, 2008 June.
ATNF Users’ Committee: Director’s Update CSIRO Astronomy and Space Science Philip Diamond, Chief CASS & Director ATNF 11 July 2012.
CSIRO Astronomy and Space Science Technologies for Radio Astronomy Tasso Tzioumis Assistant Director – Engineering June 2015 Mark Bowen Group Leader –
ASKAP Capabilities John Reynolds on behalf of the SEIC and ASKAP team.
ATUC meeting Director’s Report Brian Boyle May 2008.
ATNF Operations Douglas Bock ATUC – 25 NOVEMBER 2014.
Astro Report to ATUC – October 2011 Simon Johnston Head Astrophysics, CASS ATUC, October 2011.
May 17, 2004SSWG - PFIS Shared Risk1 PFIS Commissioning, Shared Risk, and Transition to Operations.
Director’s update CSIRO Astronomy and Space Science Lewis Ball CASS Chief 11 June 2013.
VLBI Facility report - Mar 2003 Tasso Tzioumis ATNF CSIRO.
The Parkes Data Archiving Project Arkadi Kosmynin 11 December 2009 The Third ATNF Gravitational Wave Workshop.
Australian SKA Pathfinder (ASKAP) David R DeBoer ATNF Assistant Director ASKAP Theme Leader 06 November 2007.
ASKAP Update David DeBoer ASKAP Project Director 26 May 2010.
Planning for Operations SKA Engineering Meeting 2015 Prof. Gary Davis 10 th November 2015.
ATUC meeting Director’s Report Lewis Ball October 2008 Gomez et al P616 H 2 O maser AGB star.
The ATNF Front End and Back End Groups Presented by Graeme Carrad Assistant Director – Engineering - May 2010 Australia Telescope Users Committee Technologies.
Frazer OwenNSF EVLA Mid-Project Review May 11-12, Transition to EVLA
VLBI Developments in Australia ASTRONOMY AND SPACE SCIENCE Chris Phillips| LBA Lead Scientist 11 November 2014.
ASKAP status and commissioning Astronomy and Space Science Max Voronkov | ASKAP Software scientist Kiama - 3 March 2014 Some pictures from Ben Humphreys,
Kate Chow Carol Wilson, Lisa-Harvey Smith, Balt Indermuehle, and MWA The MRO, Australia’s radio-quiet site: enabling world-class radioastronomy CSIRO ASTRONOMY.
First result with PAF on a big single-dish radio telescope X. Deng, A. Chippendale, S. Johnston, G. Hobbs, D. George, R. Karuppusamy ASTRONOMY AND SPACE.
Literally. Building the SKA Dr. Lisa Harvey-Smith | CSIRO Square Kilometre Array Project Scientist 1st June 2012 ASTRONONY & SPACE SCIENCE.
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
SKA update Sarah Pearce| Deputy Director, CSIRO Astronomy and Space Science November 2016 CSIRO ASTRONOMY AND SPACE SCIENCE.
The CSIRO ASKAP Science Data Archive Progress and Plans
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
Mid Frequency Aperture Arrays
Science Operations Phil Edwards 14 November 2016
Technologies for Radio Astronomy
Astronomy Governance Working group ASA update
Paul Wild Observatory at Narrabri
Pulsar Timing with ASKAP Simon Johnston ATNF, CSIRO
CSIRO Agency Update Dr. Robert Woodcock.
For more information, visit
Wide Field Astronomy with ASKAP
For more information, visit
VLA to EVLA Transition Plan
Quantification of BMP Impacts on CBP Management Strategies
EVLA Advisory Committee Meeting
SKA PEP - Dish Array WP5 Phase 1 Dishes with Single Pixel Feed Systems
Australia Telescope Users Committee Technologies Report – October 2011
Correlator Growth Path
ATUC Meeting, 7 May 2008, Astro Issues Robert Braun
Presentation transcript:

Director’s Update AT Users’ Committee -- November 2016 Douglas Bock -- Director

ATUC Members – Nov 2016 Virginia Kilborn (Chair, Swinburne University) Jo Dawson (Secretary, Macquarie University / CASS) Stuart Ryder (AAO) James Miller-Jones (Curtin University) Stas Shabala (University of Tasmania) Willem van Straten (AUT) Vanessa Moss (Sydney University) Martin Bell (CASS) Sarah Hegarty (Student, Swinburne University) [vacant] Will be calling for nominations for ATUC and TAC in 2017

Highlights ASKAP Early Science PAF installation PAF on Parkes MRO Power station for ASKAP and MWA Breakthrough Listen start ATCA Legacy Projects FAST feed (and opening!) SKA IGO negotiations converging SKA construction focusing on a 2018 start DSS36 complete at Tidbinbilla Roadshow – Au Universities Oct/Nov (Swinburne, Sydney, UNSW, UWA, Curtin, AAO, ANU, UTas) The FAST 19-beam feed Photo credit: Wheeler Studios Most of these to be covered in later presentations

The ATNF in 10 years – the era of SKA Phase 1 Manager of the SKA Site & Radio Quiet Zone Operator for SKA in Australia Key Partner in SKA Regional Data Centre Technologies Research & Development Developing technologies for SKA and others Develop PAF technology as part of the SKAO Development Programme Towards SKA – Phase 2 An upgraded ASKAP ?

Status: stable ASKAP-12 array; 36 beams, 48 MHz bandwidth Demonstrate unique capabilities Data to community Feedback to CASS for tuning and improving science 12 ant. 25 % of time for about a year. 2000 nights. Status: stable ASKAP-12 array; 36 beams, 48 MHz bandwidth

CSIRO Astronomy & Space Science Page 5

PAF Production/Installation Status (as of 04/11/2016) COMPLETED / PASS RETEST REQUIRED PARTIAL COMPLETION AK13 MPI AK14 AK10 AK24 AK16 AK30 AK28 AK04 AK05 AK02 AK12 AK27 AK17 AK22 AK18 AK25 AK01 shipped AK19 AK20 AK34 AK26 AK08 shipped AK06 AK03 shipped shipped

ASKAP Timeline 7 Oct 2016: start of ASKAP-12 Early Science with BW = 48 MHz WALLABY has gathered ~10 nights of data on one ES field 24 PAFs are currently installed at the MRO, 4 PAFs shipping to MRO 03/11 from 21 Oct 2016: ASKAP commissioning team to upgrade bandwidth to the full 300 MHz and test performance Nov/Dec 2016: ASKAP-12 Early Science, increase b/w (300 MHz) Dec 2016: 30 PAFs at the MRO, ready for single dish testing Feb 2017: upgrade Pawsey computing system (storage focus) Feb − Jul 2017: observing continues with core ASKAP-12 work on adding six PAFs to ASKAP-12 for science Sep 2017: final 6 PAFs at MRO, ready for testing (31 – 36) Commence rollout of AR3, AR4 etc to enable 24, 30, 36 Q3 2017: commissioning with ASKAP-30 ** Demonstrate unique capability Data to community Feedback to CASS for tuning and improving science 12 ant. 25 % of time for about a year. 2000 nights ** message – essential to understand uncertainty of s/w rollout and testing. AR releases of ASKAPsoft will continue to discover issues with the system and Pawsey, even though we do full end to end tests in advance with simulated data. Increasing ASKAPSoft from 12 to 30 antennas should commence in June 2017, with a restricted number of modes – some transient, zoom etc won’t be till later (2018).

Initial operations include use of diesel generators and the Horizon Power 250kW solar array. Horizon Power will lead the integration of Stage 2 being the CSIRO SESKA funded 1.6MW solar Array and 2.5MWh energy storage system

2017 ASKAP Commissioning and Early Science ATCA Legacy Projects and Breakthrough Listen Technologies Deliver UWB-LOW feed and ASKAP PAFs Seek funding for Parkes PAF and ASKAP Feedleg upgrade, ASKAP Tied Array mode Publish the long term strategy for the program Pipeline of projects for continuity of expertise Broader impacts of our program ATNF Operations Negotiations on observing time (EoI process) Potential reductions in access to Parkes and/or ATCA, LBA. SKA Intergovernmental Org (IGO), funding, CDRs Designing our regional Centre (CSIRO SKA project scientist)

Key questions for ATUC Relative risks and priorities of maintaining merit-based access to ATCA Parkes LBA What should the SKA Regional Centre provide to Australian astronomers (ongoing consultation)? We are just beginning the discussion on Regional Centres. CASS will lead Australian community input to the process

We acknowledge the Wajarri Yamatji people as the traditional owners of the Observatory site

Backup slides follow

CSIRO funding of radio astronomy Expected to be steady