NMME Phase-II Data: Status

Slides:



Advertisements
Similar presentations
WMO SPICE Guthega Dam (Australia) Site Configuration Update Oct 10 th, 2012 Information from Shane Bilish Prepared by Rodica Nitu.
Advertisements

DOE Global Modeling Strategic Goals Anjuli Bamzai Program Manager Climate Change Prediction Program DOE/OBER/Climate Change Res Div
ETCCDI climate extremes indices
REFERENCES Maria Val Martin 1 C. L. Heald 1, J.-F. Lamarque 2, S. Tilmes 2 and L. Emmons 2 1 Colorado State University 2 NCAR.
GFS (left), ECMWF (right) 500 mb Height, Winds, and Temp 00 hr forecast valid 12z 24 Dec 2010.
Phase Difference = Phase Difference = 0.05.
US National Multi-Model (NMME) Intra- Seasonal to Inter-Annual (ISI) Prediction System.
October 16-18, Research Data Set Archives Steven Worley Scientific Computing Division Data Support Section.
Presented by The Earth System Grid: Turning Climate Datasets into Community Resources David E. Bernholdt, ORNL on behalf of the Earth System Grid team.
3.5 – Solving Systems of Equations in Three Variables.
Slide: 1 Osamu Ochiai Water SBA Coordinator The GEO Water Strategy Report – The CEOS Contribution Presentation to the 26 th CEOS Plenary at Bengaluru,
WLE Operations Team Planning Meeting 2 nd February 2015, Water’s Edge.
What’s in the ReStore project for you? David Martin ESRC National Centre for Research Methods.
Learning Outcomes Assessment Learning Outcomes Committee Co-Chairs - David Steer: Stephane Booth:
ESG Observational Data Integration Presented by Feiyi Wang Technology Integration Group National Center of Computational Sciences.
A Computationally Efficient Platform to Examine the Efficacy of Regional Downscaling Methods AGU Fall Meeting Abstract GC12C-04 AGU Fall Meeting Abstract.
DIALE administration items 15 April 2011 Sanna Ruhalahti.
LATERAL AREA of a HEMISPHERE GEO188 The lateral surface of a HEMISPHERE is the dome. The lateral surface area is half the surface area of a sphere. LSA.
MM5 - Iowa State Soil initialization: - Reanalysis run: soil moisture at initial time - GCM runs: soil moisture in a “neutral” year of reanalysis run Spin.
“Comparison of model data based ENSO composites and the actual prediction by these models for winter 2015/16.” Model composites (method etc) 6 slides Comparison.
WP9/JRA3: ESM Evaluation: developing an Infrastructure Participants: AA, CNRS-IPSL, DLR, FMI, SMHI, MPG OBJECTIVES Create an interdisciplinary infrastructure.
Running CESM An overview
Parks & Recreation Service Delivery Model Review Progress Report #1 City of Pitt Meadows Council January 19,
4 th WCRP Observations and Assimilation Panel Meeting Hamburg, Germany, March 29-31, Workshop on Ensuring Access and Trustworthiness of Climate.
Climate-SDM (1) Climate analysis use case –Described by: Marcia Branstetter Use case description –Data obtained from ESG –Using a sequence steps in analysis,
The Community Climate System Model (CCSM): An Overview Jim Hurrell Director Climate and Global Dynamics Division Climate and Ecosystem.
AOLI 2015 The NMME Experience: A Research Community Archive Lessons learned from Climate Model data archive and use AOLI Meeting 2015 Eric Nienhouse NCAR.
基 督 再 來 (一). 經文: 1 你們心裡不要憂愁;你們信神,也當信我。 2 在我父的家裡有許多住處;若是沒有,我就早 已告訴你們了。我去原是為你們預備地去 。 3 我 若去為你們預備了地方,就必再來接你們到我那 裡去,我在 那裡,叫你們也在那裡, ] ( 約 14 : 1-3)
Images were sourced from the following web sites: Slide 2:commons.wikimedia.org/wiki/File:BorromeanRing...commons.wikimedia.org/wiki/File:BorromeanRing...
A41I-0105 Supporting Decadal and Regional Climate Prediction through NCAR’s EaSM Data Portal Doug Schuster and Steve Worley National Center for Atmospheric.
II Международный творческий конкурс для педагогов "Занимательные головоломки" Ребусы для детей «Музыкальные инструменты» Составила: Овчарова О.Н. Музыкальный.
Program Shutdown Update
Developing the next generation ECCC seasonal forecasting system
TIGGE Archives and Access
Project Name Company Name Presenter Name
NMME Program Development
Bentley Project Reel Digitization Bentley Historical Library t
Calibration CSL Monitor
continued on next slide
EVALUATION RESEARCH Research Methods
NMME Update High Frequency Data Online – and Growing
Recruiter / Staffing Process - (US)
                                                                                                                                                                                                                                                
continued on next slide
continued on next slide
2018 Safety Group 1 – 5 Year Program Timeline Guide

إستراتيجيات ونماذج التقويم
2017 Safety Group 1 – 5 Year Program Timeline Guide
4th NARCCAP Users Workshop
Long Range Forecast Transient Intercomparison Project (LRFTIP-A)
Слайд-дәріс Қарағанды мемлекеттік техникалық университеті
Mississippi River at Clinton, Iowa.
.. -"""--..J '. / /I/I =---=-- -, _ --, _ = :;:.
University of Washington Center for Science in the Earth System
HRS4R – from PROGRESS to QUALITY
II //II // \ Others Q.
I1I1 a 1·1,.,.,,I.,,I · I 1··n I J,-·
2019 Safety Group 1 – 5 Year Program Timeline Guide

Expert Group on Reporting under the Nature Directives
USING CAMERA TRAPS AND iSPORTSMAN
2016 Safety Group 1 – 5 Year Program Timeline Guide
. '. '. I;.,, - - "!' - -·-·,Ii '.....,,......, -,
continued on next slide
COLLABORATION AND ENGAGEMENT WITH CROSS-CUTTING WMO PRIORITIES; WIGOS MAIN OBSERVING COMPONENTS GLOBAL CRYOSPHERE WATCH 25 Jan 2019 Árni Snorrason Chair,
2012 Safety Group 1 – 5 Year Program Timeline Guide
Native American Webquest
LOA Assessment 31 October – 04 November 2016
continued on next slide
Presentation transcript:

NMME Phase-II Data: Status Recent Highlights CFSV2 & GEOS-5 TAS (surface temp) published Missing Variables ETA to complete daily archive Oct 31, 2015 Archive assessment complete (see following slide) CFSV2 Processing & publishing 6hr temp, winds “Missing” variables identified and transferred to NCAR 6hr ETA Oct 31, 2015 Documentation Model and data product documentation on ES-COG sites (in progress) Script sharing repository (need input) NMME data highlight on NCAR ESG Climate Data Portal (Nov 1, 2015)

NMME Phase-II Data Archive Status: Oct 8, 2015 Archive Data by Variable and Model CCSM4 CESM1 CFSV2 CanCM3 CanCM4 FLORB GEOS5 Variable Daily 3hr 6hr TAS  ✔ EX TA TASMIN TASMAX PR PSL UA VA G ✔ Complete EX Expected (not yet published)  Not Expected ? Status not yet evaluated or unknown Daily, 6hr, 3hr products complete by Oct 31, 2015 CESM1 daily available Feb, 2016