Risk Reduction Strategies Funct. & NF Requirements Summaries

Slides:



Advertisements
Similar presentations
Strategic Planning Process: An Overview
Advertisements

Please login now.
Class 6 – Scope Management Group Project 2 1.Project strategy – how to attack it 2.Inception skills requirements 3.Planning technique requirements Scope.
Project Integration Management Sections of this presentation were adapted from A Guide to the Project Management Body of Knowledge 4 th Edition, Project.
Team Name Critical Design Review Team Members Date Fall 2011 Rev A
Proposals A Template. In Organizations & Workplaces: proposals… 1.Clarify work agreements within and outside the organization 2.Set forth your productivity.
Chapter 3: The Project Management Process Groups
PROJECT MANGMENT SAMPLES By: Prof. Lili Saghafi. Contents of a Scope Statement Contents and length will vary based on the project. Typical contents include:
Recreation and Wellness Intranet Project
CIS 499 Senior Seminar IT project management. Exercise. Write a testable problem statement in subject verb format. Who? Are the people going to use this.
Risk Management - the process of identifying and controlling hazards to protect the force.  It’s five steps represent a logical thought process from.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Chapter 10 Information Systems Analysis and Design
Boston University Project Management Association Website Development Group 3 Team3 CS632 Dr. Vijay Kanabar Team Members Mario Soto Emily Ziegler Kevin.
Facility Integration Project Update Chelsea Smith – Project Manager Lake Shore Solutions.
Robotics & Engineering Design Projective Management Chin-Sung Lin Eleanor Roosevelt High School.
Lecture 3 Title: Information Technology Project Methodology By: Mr Hashem Alaidaros MIS 434.
Request for Proposal (RFP)
Project Management Inspections and Reviews 1 February.
Information System Project Management.  Some problems that org faced with IS dev efforts include schedule delays, cost overrun, less functionality than.
Program / Project Review PROGRAM/PROJECT REVIEW FORM
Microsoft Project 2010 ® Tutorial 1: Planning a Project.
Your Interactive Guide to the Digital World Discovering Computers 2012 Chapter 12 Exploring Information System Development.
1 Systems Analysis & Design 7 th Edition Chapter 2.
Request for Proposal (RFP) In response to the RFP – the first step is to prepare a proposal 1. Review Customer Requirements and come up with candidate.
HCIS 410 Read, Lead, Succeed/Uophelpdotcom For more course tutorials visit
The Project Management Process Groups
* Project Name Progress Report 2 Date Presented by:
CIS 170 MART Teaching Effectively/cis170mart.com FOR MORE CLASSES VISIT HCIS 410 AID Inspiring Minds/hcis410aid.com FOR MORE CLASSES.
What is PDF?  Each group is required to create a Product Development File (PDF).  The PDF is a series of documents that cover the entire history of the.
Prof. Shrikant M. Harle.  The Project Life Cycle refers to a logical sequence of activities to accomplish the project’s goals or objectives.  Regardless.
Class 12: Exam Review  Client project  Exam review -- check list for client project  Client project work time and Q & A.
Tools to Help  Product flow Dependencies and relationships of deliverables  Work breakdown structure The parts  PERT charts Program Evaluation and.
Class 5 – Planning IT Projects
HCIS 410 AID Experience Tradition /hcis410aid.com
Class 12: Exam Review Client project
Your Name or Team’s Member’s Names Current Date
BUSINESS DRIVEN TECHNOLOGY
Fundamentals of Information Systems, Sixth Edition
Systems Analysis and Design in a Changing World, 4th Edition
Chapter 6: Database Project Management
Class 6 – Scope Management
<Project Name> <Name> SOLUTIONS / COUNTERMEASURES
Class 7 – Inception Phase: Steps & techniques
Project Management 3. Project Management Plans
Project Management and Information Security
Planning Phase: Project Control and Deliverables
JTAMS PRE-MILESTONE B ANALYSIS
HCIS 410 Education for Service-- snaptutorial.com.
INF 342 Enthusiastic Study/snaptutorial.com
HCIS 410 ASSIST Lessons in Excellence- - hcis410assist.com.
HCIS 410 PAPER Lessons in Excellence - - hcis410paper.com.
HCIS 410 ASSIST Education for Service- -hcis410assist.com.
HCIS 410 Teaching Effectively-- snaptutorial.com.
HCIS 410 Education for Service-- tutorialrank.com
Request for Proposal (RFP)
<PROJECT NAME> THEME STAKEHOLDERS BACKGROUND CURRENT CONDITION
STATUS REPORT.
Requirements Walk-through
Project Management Process Groups
CIS 210 Systems Analysis and Development
The Software Engineering Process
DOD’S PHASED SYSTEM DEVELOPMENT PROCESS
Case Study Exercise #5 Instructors Notes
Strategy.
Project Integration Management
Group Work Breakdown Each member needs to have assigned an equal share of work Easily definable and measureable tasks Try to have the tasks independent.
Project Integration Management
Project Management Essentials
The Database Development Process
Presentation transcript:

Risk Reduction Strategies Funct. & NF Requirements Summaries Overview Graphic of Group Project 2 Report Planning Tools Gantt Chart For Development Team Network Diagram Milestone Summary Analysis Tools Risk Evaluation and Risk Reduction Strategies Funct. & NF Requirements Summaries For Users & Management Org Impact Strategy Discussion Group Project 2 report “pieces” -- in order of the final assembled report: 1. One-page executive summary (cover letter) 2. Strategy discussion 3. Organizational Impact Statement 4. Functional Requirements Summary Non-Functional Requirements Summary Risk Evaluation and Risk Reduction Strategies 7. Milestone summary 8. Network diagram of your plan 9. Gantt chart Executive Summary 1

Risk Reduction Strategies Funct. & NF Requirements Overview Graphic of Group Project 2 Report Summary of What we plan to do & When Gantt Chart For Development Team Network Diagram Milestone Summary Risk Evaluation and Risk Reduction Strategies Why our plan fits the goals and situation Funct. & NF Requirements Summaries For Users & Management Org Impact Strategy Discussion Group Project 2 report “pieces” -- summarized by the purpose of each section of your report This section is your explanation of Why your plan is a good one: 1. One-page executive summary (cover letter) 2. Strategy discussion 3. Organizational Impact Statement 4. Functional Requirements Summary Non-Functional Requirements Summary Risk Evaluation and Risk Reduction Strategies These documents provide an overview of your plan 7. Milestone summary 8. Network diagram of your plan This final document is the detail plan for the development team. 9. Gantt chart Executive Summary 2

Overview Graphic of Group Project 2 Process Case Brain Storm Solution Milestone Summary (Phases) Project Specs Gantt Chart Organiza- tional Impact Network Diagram (simul- taneous phases) Stake- holders Task-by-Task Estimation Sw / Hw Environments Functional Require- ments Root Cause Analysis Non-Functional Require- ments Group Project 2 – recommended steps 1st – review the case & GP1 materials (stakeholders, environments, root cause analysis, & DFDs) 2nd – Draft your Org Impact & Requirements Summaries & Risk Evaluation and Risk Reduction Strategies 3rd – 1st meeting: Brain storm your solution and come to a consensus on the functional and non-functional requirements 4th – Create your list of phases (Milestone summary) and figure out what phases can be simultaneous (Network diagram) 5th – Figure out how long each phase will take by completing your Gantt chart with detail tasks and your estimate of the time for each task 6th – Revisit and update your Network Diagram & Milestone Summary list with your Gantt Chart dates 7th – Clean up your early drafts and write your Strategy discussion 8th – Write your one-page executive summary (cover letter) Context Diagram & DFDs Strategy Discussion Executive Summary Risk Evaluation and Risk Reduction Strategies Do last 3