Current Status Future Progress Monitoring

Slides:



Advertisements
Similar presentations
FCMAT Response & Preparation: Process Outline October 25, 2006.
Advertisements

Software Quality Assurance Plan
® IBM Software Group © 2006 IBM Corporation PRJ480 Mastering the Management of Iterative Development v2 Module 4: Phase Management - Elaboration.
© Prentice Hall CHAPTER 9 Application Development by Information Systems Professionals.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware November 2004 Status Marc Campell, Subsystem Manager.
Project Tracking and Scheduling Infsy 570 Dr. R. Ocker.
NON PROFIT ORGANIZATION An Activity for Good Cause.
SR1 ongoing workH.Pernegger21/2/02 Ongoing work in SR1 and preparations for detector macro assembly Heinz Pernegger.
Hans-Åke GustafssonLHCC review January 31, ALICE meets LHCC referees 31/01/ :00  Milestones report H-A Gustafsson  FMD questions H. Boggild.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
Framework for Automated Builds Natalia Ratnikova CHEP’03.
12 Dec 2005 J. Schukraft1 ALICE USA ALICE position towards US participation EU participation in emcal Requirements Formal steps & schedule.
Open Workbench By Wilmer Arellano Spring Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Amendments to NTS Shrinkage Reporting Process Nick Reeves.
04/02/ FH Plans for 2005 PH-DT1-GS. 04/02/ FH Physicists: Stefan Haider, Serguei Morozov (PJAS), Ferdi Hahn, Mar Capeans Technicians: Andrea.
DT1 Gas Section Debrief of 2005 activities.. The Purpose of the Debrief  Compare plan and achievements.  Analyze how the work is done ? Do we meet the.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
The Construction of the LHC Detector Gas Systems ? Ferdi Hahn PH-TA1-GS Detector Steering Meeting 4th of June 2004.
TOF Gas System Project Overview. Content Prototype for Aging tests done for RPC’s TOF Gas System: parameters and module layouts. Special Technology: channel.
G. Carboni – Muon Meeting – April 2002 Muon Meeting LHC schedule is now official (Council Committee) First protons (Pilot run) delayed to
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Cable Layouts, Connectors for the LHC GAS SYSTEMS GAS COORDINATION MEETING, OCTOBER 2005 PH / DT1 GS.
Gas System production for LHC detectors Stefan Haider EP / TA1 - Gas.
TCR to CRR Transition Plan Proposed method for TCR Auction Revenue refunds Contingency plans For TAC Nov 1st, 2007.
5 th May 20061M. Battistin CERN LEAF Committee 2/R-030 8h30 - May 5 th 2006 Michele Battistin (TS/CV/DC) TS M&O agreement for Detector Cooling installations.
Detector Gas Systems Status Update Ferdi Hahn PH-TA1-GS Detector Steering Meeting November 2004.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
1 Project Management Software management is distinct and often more difficult from other engineering managements mainly because: – Software product is.
Gas System Construction Status Oct FH. General Construction is proceeding well, (nearly on-schedule). Testing of Racks is longer than foreseen Testing.
Project Breakdown Structure Tracing changes to our different baselines I. Bejar Alonso and Project Office TCC – 14 th January 2016.
CMS-GEM gas system GEMs for CMS High Eta Muons - Workshop III, CERN April R.Guida PH-DT-DI.
Report on database work for INB in ALICE Latchezar Betev (ALICE) Information Session INB – June 8, 2006.
Transition Plan Network Operations Model Change Requests 5/26/2010.
VAC – CTRL SYS internal meeting, 14 Dec A list of topics Start of the disassembly works: mid Jan. At first the W arm shall be off- service, then.
Quality Assurance for LHC Gas Systems Stefan Haider / EP-TA1.
Totem Gas Systems ( T1, T2 ) F. Hahn and S. Haider PH / DT1.
3/7/20131 PHENIX WEEKLY PLANNING 3/7/2013 Don Lynch.
CERN GS Department CH-1211 Genève 23 Switzerland cern.ch/gs-dep Internet Services GS AIS General Services Department GS Advanced Information Services EVM.
Tracker cooling plant refurbishment Project status Revised plan Financial impact.
ALICE Trigger Upgrade CTP and LTU Design Review ALICE CTP and LTU Upgrade Design Review CERN 27 th January 2016 Budget, time schedule, resources David.
Rad. Shield 2 Feb. 06D.LACARRERE1 IP8 POINT 8 – RADIATION SHIELD – UX85 Introduction  History (in brief)  Conceptual Design  Why installation shifted.
ELENA installation progress F. Butin / ELENA collaboration.
Generator Services planning meeting Witek Pokorski
Detector Gas Systems Status Update Ferdi Hahn PH-DT1-GS 3 rd Detector Steering Meeting on Gas Systems June 2005.
Gas Schedules
CERN PH-DT Physics Department (PH) Detector Technologies (DT)
Gas system Commissioning procedures and status
LCLS Klystron Modulator AIP Sec 28 AIP Review Feb 2010
CMS gas systems meeting
Senior Staff Meeting November 12, 2008
LHC Experimental Vacuum Systems Status October ‘07
Savannah to Jira Migration
ProtoDUNE SP DAQ assumptions, interfaces & constraints
CMS RPC Endcap RE1 Status Report
Toward the final design of a TPC for the ILD detector
Q1-Q2, Q2-Q3 Interconnect Zone Disconnection Q1 Magnet Extraction
CMS Goal of the experiment
Final Order The Final Order is a very important section that must be completed. In this area, you will put the issuance date, and the requirements that.
Benoît DAUDIN (GS-AIS-PM – CERN) 22-March-2012
Overall Project RAG Status:
Installation of Photon Beam Transport to FEH
Simulation Project Structure and tasks
XRN Feb 19 Minor Release - Status Update
WLCG Status – 1 Use remains consistently high
Upgrade Phase 2 Mechanics meeting, 21 March 2013 Introduction
Regional Haze SIP Status Report
CO2 progress and issues on the control systems
SNS-PPU upgrades the existing accelerator structure
Information system analysis and design
Presentation transcript:

Current Status Future Progress Monitoring TA1 Gas Section Work Current Status Future Progress Monitoring

Ongoing work AICE TPC: CMS Distribution: Software tests have started. CMS Distribution: We had a problem with some NBR joints -> they were damaged due to “over compression”. The modification is ongoing. Finished by Feb. 04 RPC Endcap racks will be finished in Dec. Mixer Construction starting Jan. (+ 1 month) ATLAS Construction starting March (+ 2 month) Hold ups in validation of components Component cleaning with EST is not operational (at earliest March 03) (+ 6 month) New Lab Bldg 164 finished in Feb 04.

Milestones

Simple Manpower Calculation Note: This estimates accounts only the labor for rack assembly and installation. Engineering and physicist manpower is not included. Manpower Estimate [man-years] Work completed [man-years] Remaining Work ATLAS 9 (without TRT) 0.2 8.8 CMS 8 3.5 4.5 ALICE 6.5 2.0 LHCb 2.9 (without Rich’s) Total 26.4 5.7 20.7 The remaining 21.2 man-years have to be completed until mid 2006 (in 2.5 years), that means every 6 months we must complete work for the equivalent of ~4.0 man-years. At the moment we are a factor 2 to 3 below, but the manpower will increase over the next months.

Proposal for Progress Monitoring Collect all the schedule data from the 4 experiments (ongoing) Define a few system specific milestones for each experiments. Define some milestones related to the module construction. Monitor the amount of work completed in periods of 6 months. By March 2004 we can have revised schedule and detailed proposal for the progress reporting.

This Requires some further Clarifications: Reducing the non LHC work to < 1man-year/year. (was 2.5 my’s in 2002, and 1.5my’s in 2003) User requirements (design Documents) shall be approved documents in EDMS. Modifications will require “ECR” Our team must reduce the installation work in the pits to the minimum possible (example: CMS) Bottlenecks (e.g. cleaning, component validation, mechanical engineering) in the construction must addressed and removed. QC program put in place.